Exam Cheat Sheet · Quick Reference

Arizona R-11 Electrical Residential

Arizona  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
110
Passing score
70%
Exam time
240 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Arizona State Portion 110 questions

General Electrical Knowledge 6 Q · 5%
Ohm's Law formulas and calculations (voltage, current, resistance, power)Series, parallel, and combination circuit analysisElectrical formulas for amperes, horsepower, kilowatts, and kVA (single-phase and three-phase)Conductor ampacity, temperature ratings, and correction/adjustment factorsGrounding and bonding requirements for systems, equipment, and conductorsGround-fault circuit interrupter (GFCI) requirements and assured equipment grounding conductor programsWorking clearances and guarding of live parts for electrical equipmentCommon electrical distribution systems and conductor color coding
Service Feeders and Branch Circuits 18 Q · 16%
Branch circuit conductor sizing and ampacity requirementsBranch circuit overcurrent protection ratings and settingsFeeder conductor sizing using 125% of largest motor plus sum of remaining loadsFeeder overcurrent protection device sizing for multiple loadsGFCI protection requirements for dwelling unit branch circuitsAFCI protection requirements for dwelling unit branch circuitsVoltage drop calculations for single-phase and three-phase circuitsAmpacity correction and adjustment factors for temperature and conductor fill
Grounding and Bonding 16 Q · 15%
Equipment grounding conductor sizing (NEC Table 250.122)Grounding electrode conductor sizing for AC systems (NEC Table 250.66)Main bonding jumper and system bonding jumper sizing (NEC Table 250.102)Systems required to be grounded (AC and DC systems)Grounding connections and grounding path requirementsMade electrodes and resistance to ground requirementsBonding jumper capacity and electrical continuity requirementsIdentification and use of grounded versus grounding conductors
Conductors and Cables 12 Q · 11%
Ampacity tables for insulated conductors in raceways, cables, and free airAmpacity correction factors for ambient temperature deviationsAdjustment factors for more than three current-carrying conductors in a racewayConductor insulation types, trade names, maximum temperature ratings, and permitted locationsConductor and equipment termination temperature rating limitationsDC resistance and physical properties of conductors by AWG and kcmil sizeAC resistance and reactance for conductors in conduitDimensions and cross-sectional areas of insulated conductors by type and size
Raceways and Boxes 15 Q · 14%
Conduit fill calculations for mixed conductor types and sizesMaximum number of conductors by conduit type (EMT, RMC, IMC, PVC, FMC, LFMC)Box fill calculations and volume requirements per conductor sizeMetal box dimensions and maximum conductor counts by AWGConduit securing and supporting requirements by raceway typeUnderground installation minimum cover requirements by wiring methodSupporting conductors in vertical raceways spacing intervalsPull and junction box sizing for straight and angle pulls
Special Occupancies and Equipment 3 Q · 3%
Residential smoke alarm placement and location requirementsPower supply requirements for smoke and heat alarmsInterconnection of multiple-station alarmsResidential fire alarm system equipment performance and testingGeneral lighting loads for non-dwelling occupancies (Table 220.12)Demand factors for household electric clothes dryers and kitchen equipmentHazardous (classified) locations Class I, II, and III definitions and requirementsSpecial equipment disconnecting means for cranes, welders, elevators, and X-ray equipment
Electrical Devices 2 Q · 2%
Electrical symbols for outlets, switches, and wiring devicesNEMA receptacle configurations and wiring diagramsNEMA enclosure types and environmental protection ratingsReceptacle ratings and branch circuit compatibilitySwitch types and applications (single-pole, double-pole, three-way, four-way)Grounding terminals and grounding-type devices on receptaclesReceptacle installation in damp and wet locationsContact symbols and terminology (SPST, SPDT, DPST, DPDT, N.O., N.C.)
Motors 3 Q · 3%
Motor branch-circuit conductor sizing (125% of full-load current per NEC 430.22)Branch-circuit short-circuit and ground-fault protective device maximum ratings (NEC Table 430.52 percentages by motor type)Motor full-load current tables for DC, single-phase, and three-phase AC motors (NEC Tables 430.247–430.250)Motor overload protection requirements and sizing based on nameplate current (NEC 430.32)Motor feeder conductor sizing and feeder overcurrent protection (NEC 430.24 and 430.62)Motor disconnecting means requirements, types, location, and ampere rating (NEC 430.102–430.110)Running overload unit placement by motor type and supply system (NEC Table 430.37)Single-phase motor types, terminal markings, and direction of rotation reversal
Low Voltage 2 Q · 2%
Fire alarm circuit classifications: Class A, B, C, D, E, N, and X pathway designationsPower-limited fire alarm (PLFA) circuit wiring methods and cable types (FPL, FPLR, FPLP)Non-power-limited fire alarm (NPLFA) circuit wiring methods and cable types (NPLF, NPLFR, NPLFP)Class 2 and Class 3 remote-control and signaling circuit requirements and cable typesSmoke detector and heat detector installation location and spacing requirementsNotification appliance requirements: audible and visible signaling characteristicsLow-voltage lighting systems (Article 411): voltage limits, isolation, secondary circuit requirementsInspection, testing, and maintenance of fire alarm systems and record-keeping requirements
Lighting 6 Q · 5%
Luminaire installation requirements by location (wet, damp, closets, bathtubs, shower areas)Lighting load calculations for specified occupancies (VA per square foot, Table 220.12)Lighting load demand factors for feeders and services (Table 220.42)Required lighting outlets in dwelling units (habitable rooms, hallways, garages, storage spaces)Recessed luminaire requirements (Type IC vs. non-IC, thermal protection, clearances, wiring)Lighting track installation and load calculation (connected load, prohibited locations, support)Energy cost calculations for lighting (operating cost, payback period for energy-saving lamps)Luminaire grounding, support methods, and wiring requirements (Article 410)
Fire Detection and Alarm Systems 5 Q · 5%
Types and classification of initiating devices (heat, smoke, radiant energy, manual pull stations)Smoke detector location, spacing, and mounting requirements for various ceiling typesHeat detector temperature ratings, color coding, and spacing based on ceiling height and constructionNotification appliance requirements: audible signal levels, temporal evacuation pattern, and visible strobe spacingPathway class designations (Class A, B, C, N, X) and circuit survivability levelsPower supply requirements: primary, secondary, and battery capacity calculationsInspection, testing, and maintenance requirements including recordkeeping and notificationResidential smoke alarm placement, interconnection, and power supply requirements (Chapter 29)
Safety 5 Q · 5%
Employer and contractor accident prevention responsibilities (OSHA 29 CFR 1926.20)Personal protective equipment (PPE) requirements and employer payment obligationsElectrical safety work practices and lockout/tagout proceduresFall protection systems and duty to provide fall protection (6-foot rule)Safety training and employee instruction requirementsFire protection and prevention program requirementsGround-fault circuit interrupter (GFCI) and assured equipment grounding conductor programEmergency action plans and means of egress
Overcurrent Protection 7 Q · 6%
Motor branch-circuit overcurrent protective device maximum ratings by motor type (NEC Table 430.52)Branch-circuit conductor sizing at 125% of motor full-load currentRunning overload unit number and placement by motor phase and supply system (NEC Table 430.37)Feeder conductor sizing and feeder overcurrent device selection for multiple motorsStandard fuse and circuit breaker ratings and next-size-up rule (NEC 240.6 and 430.52 exceptions)Current-limiting fuse let-through characteristics and short-circuit calculationsAccessibility and location requirements for overcurrent devices (600V or less)Circuit breaker operational and labeling requirements (open/closed indication, SWD marking)
Photovoltaics 10 Q · 9%
PV system components and configurations (arrays, inverters, charge controllers, batteries, BOS)PV cell types, semiconductor materials, and the photovoltaic effectCurrent-voltage (I-V) curve parameters and PV device electrical characteristicsSolar radiation concepts (irradiance, insolation, peak sun hours, air mass)Array orientation, tilt angle, and azimuth angle optimizationUtility-interactive, stand-alone, bimodal, and hybrid system configurationsSite survey procedures including shading analysis and array location assessmentNEC Article 690 requirements for PV wiring, overcurrent protection, disconnects, and grounding

Key Distinctions

Motor feeder conductor sizing (NEC 430.24)vsMotor feeder overcurrent device sizing (NEC 430.62(A))

Feeder conductors must be sized at 125% of the largest motor's full-load current plus 100% of the FLCs of all other motors, while the maximum feeder overcurrent device rating is the largest motor's branch-circuit overcurrent device rating plus the full-load currents of all other motors.

NEC 2017 Section 430.62(A)
Main bonding jumpervsSystem bonding jumper

The main bonding jumper connects the grounded circuit conductor to the equipment grounding conductor at the service, while the system bonding jumper makes that same connection at a separately derived system.

NEC 2017 Article 100 (Definition: Bonding Jumper, Main)
Single-phase formulasvsThree-phase formulas

Three-phase calculations include the 1.73 multiplier (square root of 3) — used in the denominator for amperes and in place of the factor 2 in voltage drop — while single-phase calculations omit 1.73 and use the factor 2 for voltage drop (the factor 2 alone applies to two-phase four-wire circuits).

Ugly's Electrical References 2020, Formulas for Calculating Amperes, Horsepower, Kilowatts, and kVA
AC ampere/horsepower formulasvsDC ampere/horsepower formulas

AC formulas include power factor (and 1.73 for three phase) because voltage and current can be out of phase, while DC formulas use no power factor, no factor of 2, and no 1.73 (e.g., I = (kW × 1000) ÷ E and HP = (E × I × %EFF) ÷ 746).

Ugly's Electrical References 2020, Formulas for Calculating Amperes, Horsepower, Kilowatts, and kVA
Chapter 9, Table 5vsChapter 9, Table 4

Table 5 gives the required area of each individual conductor, while Table 4 gives the usable area within the selected conduit or tubing; both must be used together (instead of Annex C) when conductors are of different sizes or insulation types.

NEC 2017 Chapter 9, Table 5
THHN insulationvsTW insulation

THHN is rated 90°C and permitted in dry and damp locations only, while TW is a moisture-resistant thermoplastic rated 60°C and suitable for dry and wet locations (THW and RHW are 75°C, dry and wet).

NEC 2017 Section 310.104, Table 310.104(A)
Grounded conductor 6 AWG or smallervsGrounded conductor 4 AWG or larger

Conductors 6 AWG and smaller must be factory identified (continuous white or gray outer finish or three continuous white/gray stripes on other than green) and may not be identified solely by field-applied marking tape, whereas 4 AWG and larger may be identified at installation by a distinctive white or gray marking encircling the conductor at its terminations.

NEC 2017 Section 200.6(A)
Motor overload heater sizing (NEC 430.32)vsMotor branch-circuit conductor and overcurrent device sizing

Overload heater elements must be sized from the actual motor nameplate amperes, while branch-circuit conductors and overcurrent devices are sized from the full-load current tables.

NEC 2017 Section 430.32
Voltage (of a circuit)vsVoltage to ground

Voltage of a circuit is the greatest rms difference of potential between any two conductors of the circuit (240 volts on a 120/240-volt circuit), while voltage to ground is the separately defined measurement from an ungrounded conductor to ground (120 volts).

NEC 2017 Article 100 (Definition of Voltage of a Circuit)
The earthvsEffective ground-fault current path

Per 250.4(A)(5) the earth shall not be considered an effective ground-fault current path because its resistance is too high; the effective path must be a low-impedance circuit able to safely carry the maximum ground-fault current to the supply source.

NEC 2017 Section 250.4(A)(5)
Type NM cablevsType USE cable

Type NM (with NMC and NMS) is permitted in one- and two-family dwellings and their attached or detached garages and storage buildings, while Type USE is identified for underground use and shall not be used for interior wiring.

NEC 2017 Section 334.10(1)
Grounding electrode conductor sizing (Table 250.66)vsEquipment grounding conductor sizing (Table 250.122)

The grounding electrode conductor is sized from the largest ungrounded conductor (or equivalent area for parallel conductors), while the equipment grounding conductor is sized from the rating or setting of the automatic overcurrent device ahead of the equipment.

NEC 2017 Section 250.66 / Table 250.66
Low-voltage lighting power supply output circuit (411.3)vsLow-voltage lighting supply branch circuit (411.7)

The power supply output circuits must be rated 25 amperes maximum under all load conditions, while the Article 411 system itself must be supplied from a branch circuit rated 20 amperes maximum.

NEC 2017 Section 411.3
Peak let-through currentvsApparent prospective RMS symmetrical let-through current

On a fuse current-limitation chart, peak let-through current corresponds to the mechanical forces exerted on conductors and equipment, while the apparent prospective RMS symmetrical value corresponds to the heating effect (clearing time being a separate characteristic, less than ½ cycle in the current-limiting range).

Ugly's Electrical References 2020, Component Protection (Fuse Let-Through Charts)

Key Terms

Main bonding jumper NEC 2017 Article 100 (Definition: Bonding Jumper, Main)
The connection between the grounded circuit conductor and the equipment grounding conductor at the service.
System bonding jumper NEC 2017 Article 100 (Definition: Bonding Jumper, System)
The connection between the grounded circuit conductor and the supply-side bonding jumper, the equipment grounding conductor, or both, at a separately derived system.
Bonding conductor or jumper NEC 2017 Article 100 (Definition: Bonding Conductor or Jumper)
A reliable conductor installed to ensure the required electrical conductivity between metal parts required to be electrically connected, important where boxes have concentric or eccentric knockouts that can impair conductivity.
Current-limiting overcurrent protective device NEC 2017 Section 240.2
A device that, when interrupting currents in its current-limiting range, reduces the current in the faulted circuit to a magnitude substantially less than that obtainable in the same circuit if the device were replaced with a solid conductor of comparable impedance.
Tap conductor NEC 2017 Section 240.2
A conductor, other than a service conductor, that has overcurrent protection ahead of its point of supply exceeding the value permitted for similar conductors protected as described elsewhere in 240.4.
Voltage (of a circuit) NEC 2017 Article 100 (Definition of Voltage of a Circuit)
The greatest root-mean-square (rms) effective difference of potential between any two conductors of the circuit concerned.
Multiwire branch circuit disconnecting means NEC 2017 Section 210.4(B)
A means required at the point where the multiwire branch circuit originates that will simultaneously disconnect all ungrounded conductors, accomplished with a 2-pole breaker or two single-pole breakers with an identified handle tie.
Functional grounded PV system NEC 2017 Section 690.2
A PV system with an electrical reference to ground that is not solidly grounded, often connected to ground through a fuse, circuit breaker, resistance device, non-isolated grounded ac circuit, or electronic means of a listed ground-fault protection system.
DC-to-DC converter NEC 2017 Section 690.2
A device installed in the PV source circuit or PV output circuit that can provide an output dc voltage and current at a higher or lower value than the input dc voltage and current.
Photovoltaic source circuit NEC 2017 Section 690.2
Circuits between modules and from modules to the common connection point(s) of the dc system.
Solar cell NEC 2017 Section 690.2
The basic PV device that generates electricity when exposed to light, distinct from a module, panel, or array.
Flat-plate collector Photovoltaic Systems (2nd ed.), Chapter 1 (Introduction to Photovoltaic Systems)
A solar energy collector that absorbs solar energy on a flat surface without concentrating it and can use direct sunlight as well as radiation reflected by clouds and other surfaces.
Beam construction (NFPA 72) NFPA 72, Section 3.3.38.1
Ceilings having solid structural or solid nonstructural members projecting down from the ceiling surface more than 4 in. (100 mm) and spaced more than 36 in. (910 mm) center to center.
Electrically safe work condition Ugly's Electrical References 2020, Electrical Safety Definitions (from NFPA 70E)
A state in which a conductor or circuit part has been disconnected, locked/tagged out per established standards, tested to verify absence of voltage, and, if necessary, temporarily grounded for personnel protection.
Damp location receptacle (covered porch/patio) NEC 2017 Section 406.9(A)
A receptacle under a roof and not subject to beating rain must have an enclosure that is weatherproof when the receptacle is covered (plug not inserted, covers closed), and 15- and 20-ampere, 125- and 250-volt nonlocking types must be listed weather-resistant.
Horsepower Ugly's Electrical References 2020, Formulas for Calculating Amperes, Horsepower, Kilowatts, and kVA
The energy required to lift 33,000 pounds one foot in one minute; its electrical equivalent is 745.6 watts, commonly used as 746 watts in motor formulas.
General lighting load (dwelling unit) NEC 2017 Table 220.12
A minimum unit load of 3 volt-amperes per square foot, with floor area taken from outside dimensions excluding open porches, garages, and unused or unfinished spaces not adaptable for future use.
Base ambient temperature for ampacity NEC 2017 Section 310.15(B), Table 310.16 notes
Ampacity values in the tables are based on an ambient temperature of 30°C (86°F); correction factors must be applied when the ambient temperature differs.

Formulas to Know

Amperes when kilowatts are knownSingle phase: I = (kW × 1000) ÷ (E × PF) [e.g., (12 × 1000) ÷ (230 × 0.84) ≈ 62 A]; Three phase: I = (kW × 1000) ÷ (E × PF × 1.73); DC: I = (kW × 1000) ÷ E (no PF, no 2, no 1.73); Single-phase watts known: I = P ÷ (E × PF)
Horsepower and motor current conversions1φ AC amperes: I = (HP × 746) ÷ (E × %EFF × PF) [e.g., (0.5 × 746) ÷ (115 × 0.92 × 0.80) ≈ 4.4 A]; 1φ HP = (E × I × %EFF × PF) ÷ 746; DC HP = (E × I × %EFF) ÷ 746; 1 HP = 746 watts
Power: true power (kW) and apparent power (kVA)Single phase kW = (E × I × PF) ÷ 1000; Three phase kVA = (E × I × 1.73) ÷ 1000 (PF is not used for kVA, only for kW)
Voltage drop (inductance negligible) and percent voltage dropSingle phase: Vd = (2K × L × I) ÷ Cm; Three phase: Vd = (1.73 × K × L × I) ÷ Cm; K = 12.9 for copper at 75°C, 21.2 for aluminum; L = one-way length in feet; Cm = circular mils. %Vd = Vd ÷ source voltage × 100 [7 V ÷ 240 V = 2.9%]; NEC recommends no more than 5% total, 3% each on feeders and branch circuits.
Ohm's Law for currentI = E ÷ R (e.g., 120 V ÷ 12 Ω = 10 A, which does not exceed a 15-A breaker); in a parallel circuit total resistance is always less than any individual branch resistance
Ampacity derating (temperature correction and conductor fill adjustment)Corrected ampacity = base ampacity × temperature correction factor × conductor adjustment factor; 75°C conductors at 40°C ambient = 0.88; 4–6 current-carrying conductors = 80% (0.80); e.g., 100 A × 0.88 × 0.80 = 70.4 A; at 30°C ambient no temperature correction is needed (100 A × 0.80 = 80 A)
Motor branch-circuit and feeder sizing percentagesBranch-circuit conductors: ampacity ≥ 125% of motor FLC (125% × 65 A = 81.25 A); Feeder conductors: 125% of largest motor FLC + 100% of all other motor FLCs ((1.25 × 65) + 40 = 121.25 A); Feeder OCPD: largest motor's branch-circuit OCPD rating + FLCs of all other motors; Inverse time breaker on a single-phase motor branch circuit: max 250% of FLC; Overload heaters: sized from nameplate amperes
Continuous load sizing for feedersMinimum feeder conductor ampacity = noncontinuous load + 125% of continuous load; Minimum feeder OCPD rating = noncontinuous load + 125% of continuous load (40 A + 1.25 × 80 A = 140 A)
Operating cost and energy savingsCost = Watts × Hours Used × Rate per kWh ÷ 1000 (5000 W × 360 h × $0.15 ÷ 1000 = $270/month); Energy saved = old lamp watts − new lamp watts (100 W − 15 W = 85 W per hour)
Short-circuit calculation rules of thumbTransformer %Z = voltage applied to primary to produce full-load secondary current ÷ rated primary voltage (9.6 ÷ 480 = 0.02 = 2%Z); Motor short-circuit contribution ≈ total motor current × 4; At single-phase center-tapped transformer terminals, I(L-N) = 1.5 × I(L-L)