Exam Cheat Sheet · Quick Reference

Illinois Residential Roofing Contractor

Illinois  ·  Continental Testing Services

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
80
Passing score
70%
Exam time
90 min
Administered by
Continental Testing Services
Format
Closed-book

Illinois State Portion 80 questions

Safety and Employee Protection 25 Q · 31%
OSHA standards and regulations for construction (29 CFR 1926, 1910, 1904)OSHA recordkeeping requirements (Forms 300, 300A, 301)OSHA penalties and inspection types (programmed vs. unprogrammed)Employee rights and protections under the OSH ActEmergency action plan requirementsHazard communication and Safety Data Sheets (SDS)Environmental hazards and regulations (asbestos, lead, Clean Water Act, air quality, hazardous waste)Workers' compensation, employment-related insurance, and risk management
Roofing Preparation and Materials 12 Q · 15%
Roof deck types, requirements, and inspection (plywood, OSB, wood planks/boards, spaced vs. solid sheathing)Underlayment materials and configurations for steep-slope roof systems (asphalt felt, synthetic sheets, self-adhering polymer-modified bitumen)Asphalt shingle materials, types, and classifications (organic, fiberglass, three-tab, laminated/architectural, UL fire and wind ratings)Ice and water shield/eaves flashing requirements and installationClay, concrete, and slate tile materials, profiles, and physical characteristicsWood shakes and wood shingles: types, grades, and species requirementsMetal shingle materials and substrate compatibility (aluminum, copper, zinc, steel, naturally weathering vs. coated metals)Roof insulation types, R-values, and vapor/air retarder principles for roofing assembliesMetal panel roof system substrates (structural decks, purlins, solid substrates) and air/vapor retarder placement
Steep-Slope Roofing Systems 20 Q · 25%
Asphalt shingle materials, types, and grades (three-tab, laminated/architectural, specialty)Steep-slope roof deck requirements and substrates (plywood, OSB, wood planks)Underlayment types, configurations, and installation for steep-slope systemsFlashing components for steep-slope roofs (drip edge, valley, step, counter, chimney, pipe)Clay and concrete tile types, profiles, materials, and installation methodsSlate roofing materials, grades, sizes, and installation techniquesWood shake and wood shingle types, grades, and installation requirementsMetal shingle materials, types, and installation methods
Low-Slope Roofing Systems 8 Q · 10%
Membrane types and attachment methods (BUR, polymer-modified bitumen, EPDM, thermoplastic, liquid-applied, SPF)Roof deck types and substrate requirements for low-slope systemsRigid board insulation types, R-value principles, and multilayer installation requirementsSlope, drainage, and positive drainage design criteriaVapor retarders and air retarders in low-slope assembliesFlashing and metal edge components for low-slope roof systemsMembrane surfacings (aggregate, ballast, coatings, and vegetative systems)Reroofing evaluation, re-cover vs. replacement decisions, and building code complianceSpray polyurethane foam (SPF) roof systems: foam application, pass thickness, density, and slope/drainage over roof decks and other substratesSPF protective surfacings (elastomeric coatings, granules), roof accessories, reroofing over existing roofs, construction details, and code complianceWaterproofing vs. dampproofing: positive-side, negative-side and blind-side systems, hydrostatic pressure (62.4 lb/ft^2 per foot of head) and drainage designBelow-grade waterproofing membranes: built-up and hot-fluid-applied bitumen, polymer-modified bitumen and self-adhering sheets, EPDM/PVC/butyl sheets, fluid-applied elastomerics, minimum thicknesses and substrate temperature limits +3 more
Rules, Regulations and Business Practices 15 Q · 19%
Illinois Roofing Industry Licensing Act requirements and definitionsLicense types, application process, and qualifying party obligationsSurety bond and insurance requirements for licensureLicense renewal, expiration, inactive status, and restorationGrounds for disciplinary action, penalties, and enforcementContract requirements for roofing services including rescission and trust provisionsBusiness structure selection and formationFinancial management, recordkeeping, and accounting methods

Key Distinctions

ArbitrationvsMediation

In arbitration a third-party arbitrator acts as a judge and renders an award that legally binds all parties, while in mediation the mediator only facilitates discussion and the parties set the terms.

NASCLA Contractors Guide (14th ed.), Chapter 7 — Arbitration
Collaborative lawvsMediation/arbitration

Collaborative law uses no neutral mediator or arbitrator — the parties negotiate through their own advocates (usually lawyers) and are expected to settle without further ADR or litigation.

NASCLA Contractors Guide (14th ed.), Chapter 7 — Collaborative Law
AddendavsModifications / change orders

Addenda are changes to contract documents made before the contract is awarded, while modifications are changes after the contract is signed and executed and change orders are written owner-contractor agreements changing an already executed contract.

NASCLA Contractors Guide (14th ed.), Chapter 7 — Making Changes to the Contract
Lump-sum contractvsCost-plus contract

In a lump-sum contract the contractor takes essentially all the risk for a predetermined price (bearing extra costs such as weather, keeping any savings), while in cost-plus the contractor is reimbursed actual labor and material costs plus a percentage or fixed-fee markup, with payments based on actual costs and reconciled once actual costs are known.

NASCLA Contractors Guide (14th ed.), Chapter 7 — Lump-Sum Contract
Unit-price contractvsLump-sum contract

A unit-price contract pays a calculated price per unit for the actual quantities used (appropriate when the extent of work or quantities cannot be determined in advance), unlike a lump-sum contract's single predetermined price.

NASCLA Contractors Guide (14th ed.), Chapter 7 — Unit-Price Contract
Design/buildvsTurnkey

In design/build the owner contracts with one company that assembles the design and construction team to carry the project from design through completed construction; turnkey adds expanded responsibilities and liability, with the contractor also obtaining financing and land.

NASCLA Contractors Guide (14th ed.), Chapter 7 — Design/Build
Critical path method (CPM)vsCalendar and bar chart (Gantt) scheduling

CPM graphically shows the interdependent relationships of tasks, while calendar and bar chart methods do not show interdependencies (their weakness) — calendar scheduling's advantage is linking tasks to specific dates such as deliveries, payments, and vacations.

NASCLA Contractors Guide (14th ed.), Chapter 8 — Critical Path Method section
Free float timevsTotal float time

Free float is the time an activity can be delayed without impacting the early start of the next activity; total float is leeway without delaying the overall project completion date (zero float = critical activity).

NASCLA Contractors Guide (14th ed.), Chapter 8 — Float Time section
Positive method of roof measurementvsNegative method of roof measurement

The positive method divides an irregular roof into rectangles and adds their areas; the negative method extends roof lines into one large rectangle and subtracts the areas that are not roof — both yield identical results.

Roofing Construction and Estimating, Chapter 1, Pages 7-8
Fiberglass asphalt shinglesvsOrganic asphalt shingles

Fiberglass shingles use a fiberglass base mat saturated and covered with flexible asphalt and surfaced with mineral granules, while organic shingles use a cellulose-fiber base mat.

NRCA Roofing Manual: Architectural Metal Flashing Condensation and Air Leakage Control, and Reroofing, Appendix 6—Climatic Design Information (glossary, "asphalt shingle")
Channel (pan) sidewall flashingvsStep sidewall flashing

Channel/pan flashing extends under the roof covering along the length of the wall and is generally used with S-tile, pan-and-cover, and most interlocking tile systems, while step flashing is interwoven between courses and is used with plain (flat) tile profiles.

NRCA Architectural Metal Flashing, Chapter 3, Section 3.7 Sidewall Flashing
Shingle nail penetration in wood plank/board deckvsShingle nail penetration in plywood deck less than ¾ in. thick

In wood plank or board decks nails should penetrate at least ¾ in. into the deck, whereas in plywood decks thinner than ¾ in. nails must extend a minimum of ⅛ in. through the underside.

NRCA Roofing Manual: Steep-slope Roof Systems (2025), Section 4.2—Asphalt Shingle Roof System Design and Installation (Fasteners)

Key Terms

Arbitration NASCLA Contractors Guide (14th ed.), Chapter 7 — Arbitration
An ADR method in which one or more arbitrators act as a judge and render an arbitral award that legally binds all parties, made binding under state and federal law by the widely adopted federal Uniform Arbitration Act.
Retainage NASCLA Contractors Guide (14th ed.), Chapter 7 — Retainage
A percentage (generally 10 percent) withheld from each progress payment, which may be reduced after substantial completion (for example, dropping to 5 percent after 75 percent completion).
Liquidated damages NASCLA Contractors Guide (14th ed.), Chapter 7 — Breach of Contract / Liquidated Damages
Predetermined damages written into the contract (often a per-day rate for late completion) that serve as the exclusive remedy for that breach — an owner suing for liquidated damages cannot also sue for actual damages.
Material breach Nascla Contractors Guide 14th, Chapter 7 — Breach of Contract
A serious contract violation — such as an owner refusing to pay for completed or partial work — that may void the contract, will most likely end in litigation, and allows the injured party to seek monetary damages for the loss suffered.
Progress payments Nascla Contractors Guide 14th, Chapter 7 — Progress Payments
Periodic payments that serve two functions: protecting the owner by holding the contractor to the planned schedule, and allowing the contractor to pay labor and material expenditures as they occur.
Free float time NASCLA Contractors Guide (14th ed.), Chapter 8 — Float Time section
The amount of time an activity can be delayed without impacting the early start of the next activity.
Perm (vapor permeance unit) NRCA Roofing Manual: Architectural Metal Flashing Condensation and Air Leakage Control, and Reroofing, Appendix 6—Climatic Design Information
One perm equals transmission of 1 grain (about 0.07 grams) of water vapor per square foot per hour per inch of mercury vapor pressure difference across the barrier; lower perm rating means better vapor barrier.
Equiviscous temperature (EVT) NRCA Roofing Manual: Membrane Roofing Systems, Chapter 5—Roof Membranes
The bitumen temperature at which 125 centipoise viscosity is attained — the optimum application temperature/viscosity, with roofing bitumen applied within 25°F of the EVT.
Heating-degree day (HDD65) NRCA Roofing Manual: Architectural Metal Flashing and Condensation and Air Leakage Control—2022, Chapter 1, Section 1.3—Climate Conditions
Established from local weather records as the difference between 65 F and the outdoor mean temperature for the day; when the mean is below 65 F there are as many degree days as degrees F of difference.
Cooling-degree day (CDD50) NRCA Roofing Manual: Architectural Metal Flashing and Condensation and Air Leakage Control—2022, Chapter 1, Section 1.3—Climate Conditions
Established from local weather records as the difference between 50 F and the outdoor mean temperature for the day; when the mean exceeds 50 F, cooling-degree days equal that difference.
Standard threshold shift NRCA Safety Manual (3rd ed.), Chapter 10—Exposures, 29 CFR 1904
Under 29 CFR 1904 injury and illness recordkeeping, a change in a worker's hearing threshold averaging 10 decibels across frequency ranges, which must be recorded.
Action level (lead, 29 CFR 1926.62) NRCA Safety Manual (3rd ed.), Chapter 10—Exposures, 29 CFR 1926.62 (action level definition)
Airborne lead of 30 micrograms per cubic meter of air as an eight-hour TWA, which triggers additional employer obligations such as biological monitoring (blood sampling and analysis); the PEL is a separate higher threshold of 50 µg/m³.
Large Quantity Generator (LQG) under RCRA NRCA Safety Manual Ch. 16—Hazardous Waste Management, Generator Categories section
A generator producing 2,205 pounds or more of hazardous waste per calendar month, subject to the strictest compliance requirements including a 90-day accumulation limit.
Roofing work (for safety-monitoring systems) NRCA Safety Manual Ch. 11—Fall Protection, Safety-monitoring Systems section
Hoisting, storage, application, and removal of roofing materials and equipment, including related insulation, sheet metal, and vapor barrier work, but specifically not construction of the roof deck — a safety-monitoring system may only be used for employees doing this work.
Workweek (FLSA) NASCLA 14th Edition, Chapter 10 - Employee Management, Fair Labor Standards Act (FLSA)
A fixed period of 168 hours over seven consecutive 24-hour periods that may begin any day/hour set by the employer; for minimum wage and overtime each workweek stands alone and may not be averaged with others.
Qualifying party serving multiple licensees (Illinois) 225 ILCS 335/4.5(a); 68 Ill. Adm. Code 1460.11(c)
A qualifying party may act for one additional licensee of the same license type only if there is a common ownership or management interest of at least 25% in each licensed entity, or if the person qualifies one entity and its licensed subsidiary.

Formulas to Know

Net (actual) roof area in squares from plan areaNet roof area = roof plan area × roof-slope factor; ÷ 100 = squares (e.g., 34 × 24 = 816 sq ft × 1.158 = 945 sq ft = 9.45 squares; 2,000 sq ft × 1.118 = 2,236 sq ft)
Roof slope expressed as rise per 12 in. of runSlope = (total rise ÷ total run) × 12 (e.g., 7.5 ft ÷ 15 ft × 12 = 6 in 12; rise 12 ft ÷ run 24 ft × 12 = 6 in 12); slope angle = arctan(rise ÷ run)
Common rafter actual lengthRafter length = run × common-rafter roof-slope factor (14 × 1.202 = 16.83 lin ft; 10 × 1.302 = 13.02 ft); equivalently √(run² + rise²) (√(28² + 14²) = 31.30 ft), where run = ½ span and rise = run × (pitch ÷ 12)
Actual valley lengthValley length = run of the low-sloping roof × valley length factor (24 ft × 1.247 = 29.93 lin ft; 11 ft × 1.500 = 16.50 ft each, two valleys = 33.0 lin ft)
Hip rafter plan length (conventional framing)Plan length of hip rafter = 1.414 × run (1.414 × 14 ft = 19.80 ft); 1.414 = √2 for the 45° plan angle
Hip and ridge cap units requiredUnits = (total ridge + hip length in ft × 12 in.) ÷ exposure in inches, rounded up (88.0 ft × 12 ÷ 5 in. = 211.2 → 212 units)
Material allowance factorAllowance factor = gross area including waste/lap/starter ÷ net roof area (18 ÷ 15 = 1.20, i.e., a 20% allowance)
Labor unit price per squareUnit price = total daily crew cost ÷ daily crew production (8 hr × $35.00/hr = $280 ÷ 6.37 squares = $43.96 per square)
Bid price after adding overheadBid = direct costs ÷ (percentage that direct costs represent of total revenue); with 9% project + 11% company overhead, direct costs = 80%, so $100,000 ÷ 0.80 = $125,000 (do NOT simply add 20% to direct costs)
Percentage of completion earningsPercent complete = project costs incurred ÷ total estimated costs ($300,000 ÷ $1,000,000 = 30%); cumulative earnings = percent complete × contract amount (30% × $1,500,000 = $450,000)