Exam Cheat Sheet · Quick Reference

Louisiana Foundations and Pile Driving

Louisiana  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
60
Passing score
70%
Exam time
150 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Louisiana State Portion 60 questions

Equipment and Technique 8 Q · 13%
Excavator and backhoe operation and production estimationDozer types, blades, and pushing techniquesCrane types and lifting capacity chartsScraper types, loading methods, and production cyclesTruck and hauling equipment productivity and fleet balancingDrilling methods for rock and earthSoil volume states and conversion factors for excavationEquipment selection based on site and material conditions
Compaction 8 Q · 13%
Optimum moisture content and maximum dry unit weightStandard Proctor and Modified Proctor laboratory compaction tests (ASTM D 698 and D 1557)Types of compaction equipment and soil type suitabilityField compaction methods and lift thickness requirementsIn-place soil density testing methods (sand-cone, rubber-balloon, nuclear gauge)Percent compaction and field control specificationsVibroflotation and dynamic compaction techniquesSoil stabilization methods (lime, cement, mechanical, geosynthetics)
Excavation and Grading 9 Q · 15%
Earthwork quantity calculation methods (average-end-area, cross-section, grid methods)Cut and fill volume calculations and balancingMass diagram construction and haul distance analysisReading and interpreting plan views, profile views, and cross-section viewsSlope stability analysis and factor of safety for cuts and fillsLateral earth pressure and retaining wall stabilityGroundwater and dewatering methods during excavationIBC excavation safeguards, slope limits, and protection of adjacent property
Soil Types 8 Q · 13%
Soil classification systems (USCS and AASHTO)Cohesionless vs. cohesive vs. organic soil characteristics and engineering propertiesGrain-size analysis and particle size distributionAtterberg limits (liquid limit, plastic limit, plasticity index)Presumptive load-bearing values by soil classExpansive soil identification and criteriaSoil formation, weathering, and deposit types (residual, alluvial, glacial, wind)Soil volume relationships and compaction properties (swell, shrinkage, density)
Piles 7 Q · 12%
Types of piles (timber, concrete, steel, composite) and their characteristics, capacities, and lengthsEnd-bearing vs. friction pile behavior and load transfer mechanismsPile capacity calculation methods (static analysis in sand and clay, skin friction, end bearing)Pile-driving formulas and wave equation analysis (Engineering News formula, Danish formula)Pile load testing procedures and interpretation (ASTM D1143, load-settlement curves, allowable load determination)Pile group behavior, efficiency, spacing requirements, and load distributionPile-driving equipment types (drop, single-acting, double-acting, diesel, hydraulic, vibratory hammers) and selection criteriaSpecial inspections and testing requirements for driven and cast-in-place deep foundations (IBC Table 1705.7, Table 1705.8)
Concrete Formwork 5 Q · 8%
Lateral pressure of fresh concrete on vertical forms (rate of placement, temperature, admixtures, vibration effects)Vertical loads on horizontal formwork (dead loads, live loads, minimum design values)Formwork materials (lumber species and grades, plywood, engineered wood products, steel, aluminum)Design of slab, wall, beam, and column form members (bending, shear, deflection criteria)Shoring, reshoring, and backshoring design and load distribution in multi-story structuresForm hardware and accessories (form ties, anchors, hangers, safety factors, release agents)Formwork erection, stripping, and safety requirements (OSHA regulations, fall protection, inspection)Formed concrete surface quality and tolerances (surface finish classes, deflection limits, ACI 117 tolerances)
General Concrete 8 Q · 13%
Water-cementitious materials ratio and its effect on strength and durabilityConcrete mixture proportioning and design stepsFresh concrete properties: workability, consistency, slump, and bleedingCuring methods, materials, and duration requirementsConcrete durability and exposure categoriesBatching, mixing, transporting, and handling ready-mixed concretePlacing, finishing, and consolidation of concreteConcrete defects and imperfections: causes, prevention, and repair
Safety 7 Q · 12%
Fall protection systems requirements and criteria (guardrail, safety net, personal fall arrest systems)Excavation safety and protective systems (sloping, shoring, shielding, cave-in prevention)Crane and derrick safety (power line clearance, ground conditions, assembly/disassembly)Personal protective equipment selection, use, and employer payment requirementsFire protection and prevention (extinguishers, flammable liquid storage, ignition hazard control)Occupational health controls (noise exposure limits, air contaminant permissible exposure limits, ventilation)Medical services, first aid requirements, and emergency action plansUnderground construction safety (air monitoring, ventilation, gassy operations, emergency provisions)

Key Distinctions

Type 1 differing site conditionvsType 2 differing site condition

A Type 1 condition exists when actual conditions differ materially from those indicated in the contract, while a Type 2 condition arises when actual conditions differ from what would reasonably be expected (neither clause relieves the contractor of the duty to thoroughly examine project conditions).

Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Earthwork Planning section
Standard Proctor test (ASTM D-698 / AASHTO T 99)vsModified Proctor test (ASTM D-1557 / AASHTO T 180)

The standard test compacts three equal layers with a 5.5-lb rammer dropped 12 in. 25 times, while the modified test uses a 10-lb rammer dropped 18 in. on each of five equal layers, delivering roughly five times the compactive energy and producing a higher maximum dry density at a lower optimum water content.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Compaction Tests section
Liquid limit test (Casagrande device)vsPlastic limit test (thread test)

The liquid limit is the water content at which the standard groove closes 1/2 in. (12.7 mm) along the bottom at exactly 25 blows of the cup, whereas the plastic limit is the lowest water content at which the soil can be rolled into a 1/8 in. (3.2 mm) diameter thread without crumbling.

Soils and Foundations, Pages 17-18 (Section 2-3, Soil Consistency—Atterberg Limits)
Single-acting steam or air pile hammervsDouble-acting pile hammer

A single-acting steam or air hammer strikes 40 to 60 blows per minute, while a double-acting hammer delivers 95 to 300 blows per minute (700 to 1,200 refers to optimal vibratory hammer frequency ranges).

Construction Planning, Equipment, and Methods (9th ed.), Chapter 17 — Single-Acting Hammers section
Cohesive soil swell (bank to loose)vsSolid rock swell

Cohesive soils swell about 40% between bank and loose states, while solid rock swells as much as 65% between bank and loose states and 20 to 40% from bank to placement in an embankment; the 10–30% figure is the separate shrinkage of cohesive soils from bank to compacted state.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 - Soil and Rock, Volumetric Measure
Field-cured cylindersvsStandard-cured companion cylinders

Per ACI 318-19, curing and protection are considered adequate if field-cured cylinders tested at the age designated for f'c average at least 85% of companion standard-cured cylinder strength, or if field-cured strength at test age exceeds f'c by more than 3.5 MPa (500 psi); the 75% figure instead applies to the lowest individual drilled core.

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
EskervsMoraine

An esker is a ridge or mound of boulders, gravel, and sand deposited as the bed load of meltwater streams on, within, or beneath a glacier, while a moraine is a direct glacial deposit — a heterogeneous mixture of all particle sizes from boulders to clay accumulated by the ice as it traveled.

Soils and Foundations, Chapter 1 — Soil Deposits section (Glacial Deposits)
Soldier piles set in predrilled holesvsDriven soldier piles

Soldier piles (H-piles) are typically set in predrilled holes around the periphery of an excavation and grouted in place with weak concrete, because predrilling rather than driving provides close control of alignment and location.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Soldier Piles and Lagging section
Hard-troweled (steel-troweled) finishvsFloat or broom finish

Concrete with more than 3 percent entrained air should not be given a hard-troweled finish (risk of trapping bleed water/air and causing delaminations), which is why slabs with the 6 percent or more air typical of exterior freeze-thaw exposure receive float or broom finishes.

Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Undisturbed native soilvsSoil in an old, previously dug trench line

In certain soils, digging resistance is usually greater in undisturbed earth than in an existing trench line, so an old ditch line digs easier and can often be spotted visually as darker spots of topsoil mixed in with lighter-colored subsoil.

Pipe and Excavation Contracting, Page 148
Struck bucket capacityvsHeaped bucket capacity

Depending on soil type, heaped capacity is usually about 130 percent of struck capacity (e.g., a 2-ft-wide hoe bucket with 5 to 6 LCF struck has about 6.5 to 8 LCF heaped).

Pipe and Excavation Contracting, Pages 142-143
Oxygen enriched atmospherevsOxygen deficient atmosphere

An oxygen enriched atmosphere contains more than 23.5 percent oxygen by volume and an oxygen deficient atmosphere contains less than 19.5 percent; either is a hazardous atmosphere under the confined spaces standard.

29 CFR 1926, §1926.1202
Cap beam forms (14-day minimum in place)vsPier shaft forms (strippable after 1 day)

The much longer required curing/stripping period for cap beams ties up each form set so one set cannot keep pace with the schedule, which is the primary factor driving the need for two complete cap beam form sets.

SP-4 Chapter 3, Section 3.7

Key Terms

Station Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 - Planning for Earthwork Construction, GRAPHICAL PRESENTATION OF EARTHWORK
A horizontal distance of 100 ft; the distance between two adjacent stations is 100 ft.
Station yard Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 - Planning for Earthwork Construction, MASS DIAGRAM
A measure of earthwork hauling work defined as the movement of 1 cubic yard through a distance of one station (100 ft), used in mass diagram analysis.
Balance line Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 - Planning for Earthwork Construction, Balance Lines
A horizontal line on a mass diagram that intersects the diagram in two places, with its length equal to the maximum economical haul distance for a particular machine type.
Load factor Pipe and Excavation Contracting, Page 66
A conversion factor that converts loose cubic yards to bank cubic yards, calculated by dividing bank volume by (bank volume plus swell percentage).
Plastic limit Construction Planning, Equipment, and Methods (9th ed.), Chapter 4, Page 173
The water content at which a soil passes from the plastic to the semisolid state — the lowest water content at which the soil can be rolled into a 1/8 in. (3.2 mm) diameter thread without crumbling.
Liquid limit Soils and Foundations, Pages 17-18 (Section 2-3, Soil Consistency—Atterberg Limits)
The water content at which the standard groove in the Casagrande device closes a distance of 1/2 in. (12.7 mm) along the bottom of the groove at exactly 25 blows (drops) of the cup.
Plasticity index (PI) Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Soil Limits section
The numerical difference between a soil's liquid limit and its plastic limit (PI = LL − PL).
Silt (dust) Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Types of Geotechnical Materials section
Material finer than sand, with particles smaller than 0.075 mm but larger than 0.005 mm; particles smaller than 0.005 mm are classified as clay.
Soldier piles (soldier beams) Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Soldier Piles and Lagging section
H-piles set in predrilled holes around the periphery of an excavation and then grouted in place with weak concrete, predrilled rather than driven for close control of alignment and location.
Set (trenching) Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
The length of trench a backhoe can excavate from one position; the digging cycle within a set proceeds as load bucket, lift load, swing & prepare to dump, dump bucket load, and return to dig.
Field consolidation line (normally consolidated clay) Soils and Foundations, Page 196 (Section 7-6, Field Consolidation Line, Figure 7-13)
The corrected line used for settlement calculation, drawn straight from point a (present effective overburden pressure p0 and initial void ratio e0) to point f on the laboratory e-log p curve at e = 0.4e0.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A test in which unconsolidated low-slump concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, stripped, and inspected for voids and edge slump; a common target for slipform paving is edge slump of 6 mm (0.25 in.) or less.
Cast-in-place cylinder (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
A cylinder cast in a mold left in the member and cured with the surrounding concrete, then removed and tested; intended for use in concrete 125 mm to 300 mm (5 in. to 12 in.) in depth, particularly for cold-weather concreting, post-tensioning work, and slabs.
Carbonation of unhardened concrete (dusting) Design and Control of Concrete Mixtures (17th ed.), Chapter 11 — Carbonation section, Page 227
Carbonation occurring in freshly placed, unhardened concrete that produces a soft, chalky surface called dusting, usually during cold-weather concreting when unvented heaters or gasoline-powered equipment in an enclosure raise carbon dioxide in the air.
Lime stabilization (construction sequence) Soils and Foundations, Section 4-9 (Pages 113-114)
Mixing lime with the natural soil, curing for a few days, then remixing followed by compaction; pressure injection (grouting) is a separate chemical stabilization technique used where soil cannot be disturbed.
Mobilization cost Pipe and Excavation Contracting, Page 60
A project cost that is sometimes itemized separately on a bid; if it is not, it must be included in the equipment cost calculations.
Canceled entry permit retention 29 CFR 1926, Subpart AA, §1926.1205(f)
Per 29 CFR 1926.1205(f), the entry employer must retain each canceled permit-required confined space entry permit for at least 1 year to facilitate review of the permit space program, with problems encountered noted on the pertinent permit.
Architectural formwork deflection limit ACI SP-4 Formwork for Concrete (8th ed.), Appendix E (ACI 347R-14), Page E-23
Per ACI 347R-14 Section 7.4.3, limiting deflections of sheathing, studs, and wales to l/400 (l = clear span between supports) is satisfactory for most architectural formwork, where deflections usually govern design rather than bending stress or shear.

Formulas to Know

Seepage beneath a sheet pile wall from a flow net (per foot of wall width)q = k·h·N_f / N_d, where N_f = number of flow channels and N_d = number of equipotential drops. Worked example: (2.0 × 10⁻⁴ ft/s)(10 ft)(4)/(8) = 1.0 × 10⁻³ ft³/s per foot of wall.
Plasticity index of a borrow sourcePI = LL − PL. Worked example against a maximum PI of 25: LL 42 − PL 19 = 23 (satisfies); 61 − 30 = 31, 38 − 12 = 26, 55 − 28 = 27 (all exceed 25).
Water to add per station of compacted embankment liftCompute on dry weight of soil and compacted volume for one station (100 ft): Volume = 100 ft × width × lift thickness; Dry weight = Volume × dry unit weight; Water (lb) = (optimum w − borrow w) × dry weight; Gallons = lb ÷ 8.33. Worked example: 100 × 36 × 0.667 = 2,400 cf; 2,400 × 115 pcf = 276,000 lb; (0.13 − 0.06) × 276,000 = 19,320 lb; ÷ 8.33 ≈ 2,319 gal. (Using the full 13% instead of the 7% difference wrongly gives 4,307 gal.)
Realistic excavation production rate from optimum rateRealistic rate = optimum rate × operator ability factor × job efficiency factor × site condition factor. Worked example: 78 LCY/hr × 0.75 × 0.83 × 0.6 = 29.1 ≈ 29 LCY per hour (0.6 covers difficult site conditions such as crosslines). Use 0.75 for an operator of average/unknown ability.
Motor-grader production and time for a finish grading jobProduction = (blade width × average speed in mph × 5,280 × job efficiency × operator ability) ÷ number of passes; then hours = area ÷ production. Worked example: (12 × 4 × 5,280 × 0.83 × 0.75) ÷ 5 = 31,553 SF/hr = 3,506 SY/hr; 30,000 SY ÷ 3,506 = ≈ 8.6 hours.
Import quantity when cut and fill are in different soil statesConvert both cut and fill to the same soil state before comparing, using the conversion factors for the specific material: Cut (LCY) = BCY × LCY/BCY factor; Fill (LCY) = CCY × LCY/CCY factor; Import = Fill − Cut. Worked example for dry common earth placed at 100% Standard Proctor density (factors 1.32 LCY/BCY and 1.54 LCY/CCY): 4,000 BCY × 1.32 = 5,280 LCY; 4,000 CCY × 1.54 = 6,160 LCY; 6,160 − 5,280 = 880 LCY import.
Trench linear feet excavated per hour (backhoe, by sets)BCF per lin ft = width × depth; LCF per lin ft = BCF × (1 + swell); LCF per set = LCF/ft × set length; cycles per set = LCF per set ÷ bucket load; time per set = (cycles × cycle time) + move time; sets/hr = 3,600 s ÷ time per set; lin ft/hr = sets/hr × set length. Worked example (2 ft × 4 ft trench, loam at 30% swell, 8 LCF bucket, 12-s cycle, 8-ft set, 15-s move): 8 BCF → 10.4 LCF/ft → 83.2 LCF/set → 10.4 cycles → 139.8 s = 2.33 min → 25.75 sets/hr → 206 lin ft/hr.
Loose haul volume and truck loads from bank volumeLoose CY = bank CY × (1 + swell); loads = loose CY ÷ truck capacity, rounded up. Worked example at 30% swell: 25.19 BCY × 1.30 = 32.74 LCY; 32.74 ÷ 12 = 2.73 → 3 loads. (Dividing the bank volume by truck size under-counts loads.) Trench length is figured on the outside perimeter: 2 × (40 + 28) = 136 lin ft.
Concrete volume for footings, piers and slabs; ordering ruleContinuous footing length = outside perimeter = 2 × (L + W); volume = length × width × depth ÷ 27 (e.g., 124 × 1.333 × 0.833 = 137.78 cf ÷ 27 = 5.10 cu yd). Pier footing = side × side × depth × number ÷ 27 (e.g., 3 piers at 2.5 × 2.5 × 1 = 18.75 cf ÷ 27 = 0.69 cu yd). 4-in. slab: one cubic yard covers 81 sq ft, so cu yd = area ÷ 81, rounded up to whole yards (960 ÷ 81 = 11.85 → 12 cu yd). Order continuous footings rounded UP to the next quarter yard (5.10 → 5.25 cu yd); order combined net volumes rounded up to the next whole yard (5.10 + 0.69 + 11.85 = 17.65 → 18 cu yd).
Foundation wall form contact area, wall concrete, and block countsForm contact area (both faces) = 2 × perimeter × height (2 × 136 × 8 = 2,176 sq ft). 8-in. wall concrete from the printed table = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft (1,088 ÷ 100 = 10.88 × 2.47 = 26.87 cu yd; check 1,088 × 0.667 ÷ 27 = 26.86). 8-in. block: three courses stack 2 ft, so courses = height × 3/2 (4 ft → 6 courses); three blocks lay 4 ft, so blocks per course = length × 3/4 (32 ft → 24 blocks).