Exam Cheat Sheet · Quick Reference

Louisiana Heat, Air Conditioning, Ventilation, Duct Work and Refrigeration

Louisiana  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
50
Passing score
70%
Exam time
130 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Louisiana State Portion 50 questions

Electrical Knowledge, Motors, and Controls 7 Q · 14%
Ohm's Law and Watt's Law calculations (voltage, current, resistance, power)Series and parallel circuit analysisSingle-phase AC motor types and starting methods (split-phase, CSIR, CSCR, PSC, shaded-pole)Three-phase motor operation, wiring connections, and full-load current valuesMotor capacitors (start and run): function, testing, and replacementElectrical control system components (thermostats, pressure controls, relays, contactors)Electrical test instruments (multimeter, voltmeter, ohmmeter, clamp-on ammeter, megohmmeter)Motor protection devices and overcurrent protection (fuses, circuit breakers, overload units, NEC ratings)
Piping - Refrigeration, Hydronic, Steam, Process 7 Q · 14%
Refrigerant piping materials, sizing, and installation requirements (ACR tubing types, supports, routing restrictions)Tubing cutting, bending, flaring, and joining techniques (soldering, brazing, flared, swaged connections)Hydronic piping materials, fittings, and joint types (IMC Chapter 12 standards)Hydronic system components and piping configurations (series loop, one-pipe, two-pipe, radiant, zoned systems)Boiler and pressure vessel connections, safety/relief valves, and clearance requirementsRefrigerant classification, quantity limits, and system classification (high-probability vs. low-probability systems)Refrigerant line design for commercial systems (suction line, liquid line, discharge line sizing, pressure drop, oil return)Fuel oil piping materials, joints, and installation requirements (IMC Chapter 13)
Heating and Cooling Principles, Theory, and Equipment 8 Q · 16%
Compression refrigeration cycle fundamentals (evaporation, condensation, compression, metering)Heat transfer principles (conduction, convection, radiation, sensible and latent heat)Types and operation of compressors (reciprocating, rotary, scroll, screw, centrifugal)Metering devices (capillary tubes, TXV, AXV, EEV, fixed vs. modulating)Heat exchangers (evaporators, condensers, types and defrost methods)Gas-fired heating systems (combustion principles, burners, ignition systems, AFUE ratings)Oil-fired heating systems (fuel oil properties, oil burners, combustion efficiency testing)Electric heating systems (resistance heating elements, electric furnaces, baseboard heaters)
Refrigerants and Refrigeration 8 Q · 16%
Refrigerant classification and types (CFC, HCFC, HFC, HFO, HC, blends)Environmental impact of refrigerants (ODP, GWP, Montreal Protocol, Clean Air Act Section 608)EPA certification requirements and technician certification types (Type I, II, III, Universal)Refrigerant identification (numbering system, cylinder color codes, pressure-temperature charts)Refrigerant recovery, recycling, and reclaiming procedures (passive and active recovery methods)Checking refrigerant charge by superheat and subcoolingSystem evacuation procedures (deep vacuum and triple evacuation)Refrigerant charging methods and retrofitting
Fuel and LP Gas 5 Q · 10%
Gas piping materials, fittings, and allowable piping systems (steel, copper, CSST, polyethylene)Gas pipe sizing methods and capacity tables for natural gas and LP gasLP gas properties, storage, and two-stage pressure regulationCombustion air requirements for gas-fired appliances (indoor, outdoor, and combination methods)Gas furnace ignition systems (standing pilot, intermittent pilot, direct-spark, hot-surface)Venting systems for gas appliances (Type B, chimneys, vent connectors, termination requirements)Gas piping pressure testing, leak detection, and system identificationCombustion efficiency and flue gas analysis (CO2, O2, CO content, stack temperature)
Combustion Air, Chimneys, Flues and Vents 5 Q · 10%
Venting system types and appliance category matching (Category I–IV, Type B, BW, L vents)Chimney and vent termination height and clearance requirementsVent connector materials, sizing, slope, and installation requirementsSizing of venting systems using code tables for single and multiple appliancesDraft hoods, draft controls, and mechanical draft systemsCombustion air requirements for gas-fired, oil-fired, and solid-fuel appliancesSafety inspection procedures for existing venting systems and combustion air adequacyDirect-vent and integral-vent appliance installation and terminal clearances
Ducts, Ventilation and Exhaust 5 Q · 10%
Rectangular duct construction: wall gauge, reinforcement schedules, and pressure classificationRound, oval, and flexible duct construction standards and joint typesDuct sealing requirements, leakage classes, and airtightness testingDuct hangers, supports, and suspension systemsMechanical ventilation rates and outdoor air requirements by occupancyExhaust system requirements: discharge location, independent systems, and hazardous exhaustFire and smoke dampers, volume dampers, and duct accessoriesDuct thermal load calculations and insulation requirements
Load Calculations 5 Q · 10%
Indoor and outdoor design conditions (HTD, CTD, design temperatures, grains difference)Fenestration heating and cooling load calculations (HTM values, U-values, overhang adjustments, shading)Opaque panel heating and cooling loads (walls, ceilings, floors, doors, CLTD, U-values)Infiltration load estimation (ACH method, component leakage, envelope tightness classification)Duct system loads (heat loss factors, sensible/latent gain factors, leakage and insulation effects)Ventilation load calculations (sensible and latent loads, heat recovery equipment)Internal loads (occupants, appliances, blower heat)Block load vs. room load concepts (equipment sizing load, sensible and latent load summation)

Key Distinctions

Pictorial wiring diagramvsLadder wiring diagram

A pictorial diagram shows all connections plus the approximate physical location of devices in the unit (and often wire colors), while a ladder diagram shows the order of component operation as horizontal rungs (individual circuits with loads and controls) between two vertical power lines, with devices near the top energized first.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 18 - Electrical Troubleshooting Fundamentals, Page 369 (Section 18.2.2) (20th ed.: Chapter 16, Section 16.1.1)
K-value (thermal conductivity)vsC-value (thermal conductance)

K-value is heat passing through one square foot of material one inch thick per hour per 1°F difference (Btu·in/hr·ft²·°F), while C-value is based on the material's actual measured thickness rather than a standardized 1-inch thickness.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 32 - Heating and Cooling Loads, Page 717 (20th ed.: Page 986)
Building-related illness (BRI)vsSick building syndrome (SBS)

BRI is a specifically diagnosable illness caused by exposure to airborne agents whose symptoms do NOT disappear when the occupant leaves, while SBS has no specific cause or identifiable illness and its symptoms disappear when occupants leave the building.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 29 - Air Quality, Page 647 (20th ed.: Page 730)
ACR tubing sizingvsCopper water tubing sizing

ACR tubing is designated by its actual outside diameter, while copper water tubing nominal size equals the outside diameter minus 1/8″.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 5 - Working with Tubing and Piping, Page 71 (Section 5.1.1) (20th ed.: Chapter 8, Section 8.1.1)
Galvanized steel pipevsBlack steel pipe

Galvanized pipe is treated with zinc anticorrosion material and used primarily in water systems to prevent rust, while black pipe is usually less expensive and used for gas lines and applications that do not carry water.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 5 - Working with Tubing and Piping, Page 74 (Section 5.3) (20th ed.: Chapter 8, Section 8.2.3)
Three-phase motors/powervsSingle-phase motors/power

Three-phase supply is already phase-split (phases peak at different times, so power is constant and never all zero), so no start windings or capacitors are needed, whereas single-phase motors require start components for phase splitting.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 16 - Electric Motors, Page 308 (Section 16.2.2) (20th ed.: Chapter 15, Section 15.2.2)
Subcooling method of charge checkingvsSuperheat method of charge checking

The subcooling method is used on systems with thermostatic expansion valves (low subcooling suggests undercharge, high suggests overcharge), while the superheat method is used on fixed-orifice systems such as capillary tubes.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 12 - Working with Refrigerants, Page 221 (20th ed.: Page 236)
Solid-state relay (SSR)vsElectromagnetic relay

An SSR switches electronically using transistors, SCRs, or triacs with no physical movement of mechanical parts (typically to start single-phase motors), whereas electromagnetic relays switch with mechanical contacts.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 345 ("Solid-State Relays") (20th ed.: Chapter 16, Section 16.3.5 — Solid-State Relays)
Range adjustment on a low-pressure motor controlvsDifferential adjustment on a low-pressure motor control

Turning the range screw clockwise raises both cut-in and cut-out pressures equally (differential unchanged), while the differential adjustment turned clockwise raises only the cut-out pressure and does not affect cut-in.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 333 (Section 17.4.4) (20th ed.: Chapter 16, Section 16.3.4 — Low-Pressure Motor Controls)
Hot-surface igniter (glow coil)vsFlame rod / thermocouple

In a hot-surface ignition system the glow coil only ignites and cannot sense flame; a separate flame rod proves flame by rectification (a dirty/oxidized rod causes shutdown a few seconds after the gas valve opens), and thermocouples are used in standing-pilot systems, not HSI.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 33 - Gas-Fired Heating Systems, Page 765 (20th ed.: Pages 1126-1128 (Sections 41.5.4 and 41.6.1))
Duct leakage tested before air handler installedvsDuct leakage tested with air handler installed

Per the IECC, maximum leakage is 3 cfm per 100 ft² of conditioned space when tested before the air handler is installed, versus 4 cfm per 100 ft² when tested with the air handler installed.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 31 - Ventilation System Service, Page 703 (Section 31.1.5) (20th ed.: Page 793)
Liquid line recovery connectionvsDischarge service valve recovery connection

Connecting at the liquid line recovers refrigerant already in subcooled liquid form (faster recovery), while the discharge service valve delivers superheated high-pressure vapor, making recovery slower and less efficient.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 50 - Servicing Commercial Systems, Page 1233 (20th ed.: Page 1500)
Appliance clearance in a private garagevsAppliance clearance in a public garage

IFGC Section 305.5 requires a minimum 6 ft clearance above the floor in private garages versus 8 ft in public garages, with an exception where the appliance is protected from motor vehicle impact and installed per Section 305.3.

IFGC 2021 Section 305.5
Radial duct systemvsPerimeter loop duct system

A radial system runs individual branch ducts directly from the central plenum to each outlet with no trunk duct, while a perimeter loop system is used with downflow furnaces in slab homes without basements, with branches feeding a perimeter duct embedded in the slab.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 30 - Air Distribution, Page 672 (20th ed.: Page 755)

Key Terms

PTC relay (positive temperature coefficient) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 346 (Section 17.5) (20th ed.: Chapter 16, Section 16.3.5 — Positive Temperature Coefficient Relays)
A start device on a PSC motor that has low resistance (3 Ω to 12 Ω) when cool so start current takes that path of least resistance instead of the parallel run capacitor, then rises to 10 kΩ–20 kΩ when hot, forcing current through the run capacitor.
Potential relay Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 339 ("Potential Relays") (20th ed.: Chapter 16, Section 16.3.5 — Potential Relays)
A motor start relay that energizes on the counter electromotive force (cemf) induced in the start winding, opening its normally closed contacts at about three-fourths of rated speed to drop out the start capacitor.
Current relay terminals L, M, S Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 339 (Section 17.4.5) (20th ed.: Chapter 16, Section 16.3.5 — Current Relays)
On a current relay, L is line voltage, M is the main (run) winding, and S is the start winding, with a normally open contact between L and S and the relay coil between L and M.
Differential (of a temperature/pressure control) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 325 (Section 17.2.2) (20th ed.: Chapter 16, Section 16.2.2)
The difference between the cut-out and cut-in values, representing the swing during which the system cycles (e.g., heating cut-out 74°F minus cut-in 68°F = 6°F).
High-pressure motor control Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 334 ("High-Pressure Motor Controls") (20th ed.: Chapter 16, Section 16.3.4 — High-Pressure Motor Controls)
A safety control usually set to cut out at 20% above normal head pressure to protect the compressor from high pressure and temperature and the motor from overheating and overloading.
Multipurpose fuse Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 347 (Section 17.5.1) (20th ed.: Chapter 16, Section 16.4.1)
A fuse combining fast-acting and time-delay characteristics: it will not blow on small short-duration overloads such as motor starting, but blows immediately on overloads over 500% of its maximum current rating.
Current-limiting fuse Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 347 (Section 17.5.1) (20th ed.: Chapter 16, Section 16.4.1)
A fuse using temperature-sensitive resistors that open when current exceeds the limit and the fuse heats, then close again when cooled, preventing motor current from exceeding rated locked rotor amperage.
Internal bimetal overload protector Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 348 (Section 17.5.3) (20th ed.: Chapter 16, Section 16.4.3)
A device on or in the compressor motor windings whose bimetal disc bends to open the circuit on overcurrent or overheating and recloses when cooled, causing the compressor to cycle off and restart.
Velocity pressure Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 28 - Air Movement and Measurement, Page 630 (20th ed.: Page 710)
The difference between total air pressure and static air pressure, measured by a pitot tube (total pressure equals static pressure plus velocity pressure).
Draft (oil furnace test) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 34 - Oil-Fired Heating Systems, Page 796 (20th ed.: Page 1155)
The movement of flue gas, measured with a draft gauge in inches of water column, indicating how quickly flue gases pass through the heat exchanger.
Overfiring Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 34 - Oil-Fired Heating Systems, Page 795 (Section 34.3.2) (20th ed.: Page 1154)
A condition in which a heating system creates too much heat, often from installing a burner nozzle of higher capacity than original, sending excess heat up the flue and raising stack temperature.
Category IV furnace Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 33 - Gas-Fired Heating Systems, Page 776 (20th ed.: Page 1134)
A positive-pressure venting, condensing furnace whose flue gas temperature is below 140°F (60°C), i.e., below its dew point, using a secondary heat exchanger and PVC vent piping.
Sequencer (electric furnace) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 35 - Electric Heating Systems, Page 834 (20th ed.: Pages 1196 and 1205)
A device that opens and closes contacts on a time delay (about 30 seconds apart) to energize heating elements one at a time, minimizing initial current draw.
Work hardened (copper tubing) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 5 - Working with Tubing and Piping, Page 72 (Section 5.1.2) (20th ed.: Chapter 8, Section 8.1.1)
Soft ACR tubing hardened by oxidation or repeated bending and hammering, which may crack at stress points when flared; annealing is the process used to re-soften it.
Refrigerant quality Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 51 - Understanding Heat Loads and System Thermodynamics, Page 1273 (20th ed.: Page 1372)
On a pressure-enthalpy diagram, the fraction of refrigerant mass in the vapor state — e.g., 10% quality is 10% vapor and 90% liquid.
Low-heat (residential) appliance IFGC 2021 Section 202, Appliance Type definitions
Per IFGC/IMC Section 202 definitions, any appliance whose products of combustion at the point of entrance to the flue under normal operating conditions are at or below 1,000°F (538°C).
Refrigerant distributor Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 45 - Commercial Metering Devices and Valves, Page 1088 (Section 45.1.4) (20th ed.: Pages 490-491)
A device at the metering device outlet that splits refrigerant into several shorter parallel evaporator circuits, reducing pressure drop and giving more consistent coil temperature.
Receiver pressure regulator (ORD valve) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 45 - Commercial Metering Devices and Valves, Page 1118 (20th ed.: Page 586)
A winter head-pressure control that bypasses hot discharge gas around the condenser into the liquid receiver, typically opening at a 20 to 30 psi difference between discharge line and receiver.
Wall area ratio (WAR) Manual J, Section 4, Page 4-6
Per Manual J Section 4, the gross exposed wall area of a room divided by the gross exposed wall area for the entire block load; it is multiplied by the block infiltration load (and CFM) to get room infiltration values.
cfm50 / ACH50 Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 31 - Ventilation System Service, Page 702 (20th ed.: Page 791)
cfm50 is the airflow through a blower door fan with indoor pressure held at −50 Pa with respect to outdoors, and it is used to calculate ACH50, the air changes per hour at that pressure difference.

Formulas to Know

Ohm's law (resistance or current)R = E ÷ I (240 V ÷ 10 A = 24 Ω); I = E ÷ R (24 V ÷ 8 Ω = 3 A, same current through every load in a series circuit)
Watt's law (single-phase power)P = I × E — e.g., 20 A × 120 V = 2,400 W; 15 A × 240 V = 3,600 W; 8 A × 240 V = 1,920 W
Air velocity from velocity pressure (pitot tube)V = 4005 × √Pv — with Pv = 0.25 in. water, V = 4005 × 0.5 ≈ 2,003 ft/min
Air changes per hour (and ACH50)ACH = (cfm × 60 min) ÷ room volume in ft³; ACH50 = (cfm50 × 60) ÷ conditioned volume — (1,500 × 60) ÷ 12,000 = 7.5
Subcooling at condenser outletSubcooling = condensing (boiling) temperature at operating pressure − measured liquid temperature — 212°F − 190°F = 22°F
Coefficient of performance from a P-h diagramCOP = refrigeration effect ÷ heat of compression = (179 − 116) ÷ (198 − 179) = 63 ÷ 19 = 3.32:1
Minimum circuit ampacity (MCA)MCA = 1.25 × largest motor FLA/RLA + sum of other loads = 1.25 × 24.0 A + 2.1 A = 32.1 A (nameplate rounds to 32 A)
Duct design friction rate and total friction lossFriction rate = (ASP ÷ TEL) × 100 = (0.20 ÷ 250) × 100 = 0.08 in. WC per 100 ft; friction loss = (total equivalent length ÷ 100) × friction rate, where equivalent length = straight duct + elbow allowances (28 + 22 + 15 + 2×25 = 115 ft → 1.15 × 0.10 = 0.115 in. WC)
Synchronous speed and slip of an AC motorNS = (120 × frequency) ÷ number of poles = (120 × 60) ÷ 4 = 1,800 RPM; with 4%–5% slip the full-load speed is about 1,750 RPM
Electric heat capacity conversion (Btu/hr to kW)kW = Btu/hr ÷ 3,413 — 50,000 ÷ 3,413 = 14.65 kW minimum