Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
80
Passing score
70%
Exam time
240 min
Administered by
PSI Services Contractor
Format
Reference materials allowed
Mississippi State Portion
80 questions
Insulation3 Q · 4%
Duct insulation R-value requirements for unconditioned spaces (attics, crawl spaces, basements)Duct insulation materials — wrap, liner, duct board, and spray foam typesFlame spread and smoke-developed index requirements for duct coverings and linings (IMC Section 604)Vapor retarder requirements for externally insulated cooling ductsDuct insulation identification and labeling requirementsImpact of duct insulation R-value on heating and cooling load calculations (Manual J duct load factors)Internal duct liner installation — interruption at fire dampers and metal nosings at exposed edgesWeatherproof barriers for exterior duct insulation
Hangars and Supports3 Q · 4%
Hanger spacing requirements for rectangular, round, and flat oval ductsUpper attachment methods to building structures (concrete inserts, powder-actuated fasteners, beam clamps, welded studs)Hanger and strap material selection and minimum sizes per duct perimeterTrapeze hanger design and load calculationsRiser duct support methods and maximum support intervalsLower attachment devices connecting hangers to duct sectionsSupport requirements near elbows and branch intersectionsIMC 2021 duct support compliance and piping support spacing requirements
Sound, Vibration & Seismic Control1 Q · 1%
Vibration isolation requirements for HVAC equipment and supplemental restraint (IMC 301.13)Duct sheet vibration and threshold velocity criteria for rectangular ductsNoise generation and transmission in duct systems (acoustic lining, duct liner installation)Seismic resistance requirements for mechanical system supports and anchorage (IMC 301.18)Oil canning and cross-breaking of sheet metal panels to reduce rumble and vibrationFlexible connections at fans to isolate vibration from ductworkDuct air velocity limits to prevent excessive noise in supply and return ductsWind resistance requirements for exposed mechanical equipment and appliances (IMC 301.15)
Heating and Cooling Principles6 Q · 8%
Heat transfer methods: conduction, convection, and radiationSensible heat and latent heat in HVAC applicationsRefrigeration cycle fundamentals: compression, condensing, metering, and evaporationHeating and cooling load calculation principles (Manual J)Indoor and outdoor design temperatures for load calculationsThermal resistance and transmittance values (R-value, U-value, K-value, C-value)Heat pump heating and cooling modes and efficiency ratings (COP, SEER, HSPF)Forced-air and hydronic heating system fundamentals
Refrigerants4 Q · 5%
Refrigerant classification and types (CFC, HCFC, HFC, HFO, HC, inorganic)Environmental impact: ozone depletion potential (ODP) and global warming potential (GWP)EPA Section 608 regulations and technician certification requirementsRefrigerant identification: ASHRAE numbering system and cylinder color codesRefrigerant safety classifications: toxicity and flammability (ASHRAE Standard 34)Pressure-temperature relationships and P/T chart usageRefrigerant phaseout schedules and approved replacement refrigerantsRefrigeration lubricant types and compatibility with refrigerants
Load Calculations6 Q · 8%
Indoor and outdoor design conditions (HTD, CTD, design temperatures)Thermal resistance and transmission values (R-value, U-value, K-value, C-value)Heat transfer multipliers (HTM) for fenestration and opaque panelsFenestration loads (windows, glass doors, skylights — heating and cooling)Opaque panel loads (walls, ceilings, floors, doors — heating and cooling)Infiltration load estimation methods (ACH table, component leakage area, blower door)Duct load procedures (conduction, leakage, load factors for unconditioned spaces)Internal loads (occupants, appliances) and ventilation loads
Testing, Adjusting and Balancing1 Q · 1%
Airflow measurement instruments and techniques (anemometers, pitot tubes, manometers, flow hoods)Duct system balancing methods (damper adjustment, airflow rate calculation per room)Blower door testing and building envelope airtightness (ACH50, cfm50)Duct leakage testing using duct blaster (cfm25, maximum allowable leakage)Psychrometric properties and use of psychrometric charts in system assessmentAir velocity calculations (velocity pressure formula, traverse point measurement patterns)Duct system noise diagnosis and correctionIMC requirements for balancing air distribution and ventilation systems (Section 608)
Controls4 Q · 5%
Thermostat types and sensing elements (bimetal, thermistor, mercury switch, millivolt)Heat and cooling anticipatorsLow-voltage, line-voltage, and millivolt thermostat operationProgrammable and digital thermostat installation and programmingOil burner primary controls and flame detection (cad cell, stack-mounted)Oil burner limit controls (low water cutoff, steam pressure, aquastat)Control circuit wiring for heating systems (steam, hot water, warm air)Motor control devices (pressure controls, relays, contactors, and motor protection)
A/C and Heat Pump Equipment6 Q · 8%
Compressor types and configurations (reciprocating, rotary, scroll, hermetic, semi-hermetic)Metering devices for A/C and heat pump systems (capillary tube, TXV, fixed-orifice/piston, EEV)Heat pump reversing valve operation and refrigerant flow directionHeat pump types (air-source, ground-source, water-source) and system componentsRefrigerant flow components (filter-driers, sight glasses, check valves, solenoid valves, accumulators)Ductless and packaged A/C equipment (room air conditioners, PTACs, ductless split systems, multizone VRF)Residential central split-system A/C components, installation, and serviceIMC refrigeration system classification, refrigerant quantity limits, and machinery room requirements
Furnaces and Heaters5 Q · 6%
Gas furnace ignition systems (standing pilot, intermittent pilot, direct-spark, hot-surface)Oil-fired furnace components and operation (fuel units, burner nozzles, electrodes, primary control units)Electric resistance heating systems (electric furnaces, duct heaters, baseboard units, radiant heat)Combustion efficiency testing (CO2, stack temperature, draft, and smoke tests)Furnace types and configurations (upflow, downflow, horizontal, two-stage, modulating)Gas furnace safety controls (high-limit switch, rollout switch, pressure switch, flame rectification)Fuel oil delivery systems and storage tanks (one-pipe, two-pipe, fuel line components, IMC/NFPA 31 requirements)IMC requirements for specific heating appliances (forced-air furnaces, unit heaters, wall furnaces, floor furnaces, infrared heaters)
Chimneys, Flues and Vents3 Q · 4%
Appliance venting categories (Category I, II, III, IV) and vent type selectionVent and chimney sizing methods using code tables (single and multiple appliances)Vent connector requirements — materials, size, slope, clearances, and length limitsChimney termination height and location requirementsMasonry chimney construction, lining materials, and cleanout requirementsFactory-built chimney listing, installation, and support requirementsDraft hoods, draft controls, and mechanical draft system requirementsCombustion process fundamentals and flue gas products (CO2, CO, excess air)
Combustion Air3 Q · 4%
Primary air, secondary air, and excess air requirements for complete combustionIndoor combustion air volume requirements (standard method and known air-infiltration-rate method)Outdoor combustion air supply methods (two-permanent-openings and one-permanent-opening methods)Combustion air opening sizing, placement, and minimum dimensionsCombustion air duct construction, materials, and installation requirementsMechanical combustion air supply systems and appliance interlock requirementsLouvers, grilles, and screens: free area calculations and motorized damper interlockingCombination indoor and outdoor combustion air provisions
Ducts14 Q · 18%
Rectangular duct construction: gage selection, reinforcement schedules, and pressure classificationRound and oval duct construction: wall thickness, longitudinal and spiral seam requirements, and transverse jointsDuct sealing requirements, leakage classes, and sealant/tape application methodsDuct hangers and supports: spacing, hanger types, trapeze selection, and attachment methodsDuct system types and supply/return air distribution layoutsFlexible duct installation standards, flexible connectors, and length limitationsDuct insulation requirements and duct load calculations (conduction and leakage losses)Duct accessories: volume dampers, turning vanes, access doors, registers, grilles, and diffusers
Ventilation and Exhausts3 Q · 4%
Exhaust discharge location and minimum separation distancesClothes dryer exhaust system requirements and duct length limitsCommercial kitchen exhaust hoods (Type I and Type II) and airflow ratesMinimum mechanical ventilation rates by occupancy typeNatural ventilation requirements and openable area calculationsIndoor air quality: pollutants, filtration methods, and MERV ratingsEnergy recovery ventilators (ERVs) and heat recovery ventilators (HRVs)Airflow measurement, system balancing, and duct testing
Safety2 Q · 2%
Personal protective equipment (PPE) selection and useFall protection systems (guardrail, safety net, personal fall arrest)Ladder and stairway safety requirementsFire protection and prevention on construction sitesHazardous and toxic substances exposure limitsConfined space entry procedures and permit requirementsLockout/tagout (LOTO) procedures for electrical and other energy sourcesScaffold safety requirements and load capacity
Fuel Gas5 Q · 6%
Gas piping materials and fittings (metallic pipe, copper tubing, CSST, polyethylene)Gas pipe sizing methods (longest length, branch length, hybrid pressure) and sizing tablesAllowable pressure drop and maximum operating pressure for piping systemsCSST bonding and electrical grounding requirementsCombustion air requirements (indoor, outdoor, and combination methods)Fuel gas appliance installation requirements (clearances, prohibited locations, access)Combustion principles (stoichiometric combustion, flammability limits, primary and secondary air)Safety inspection procedures for existing gas appliance installations
LP Gas4 Q · 5%
LP gas piping materials and allowable pipe typesLP gas piping sizing methods and capacity tablesLP gas pressure requirements and regulators (single-stage and two-stage)LP gas piping installation requirements (burial depth, support intervals, protection)LP gas piping pressure testing and leak detection proceduresLP gas combustion properties and burner operationCSST bonding and grounding requirements for LP gas systemsLP gas motor vehicle fuel-dispensing facility requirements
Fuel Oil2 Q · 2%
Fuel oil grades, properties, and classifications (viscosity, flash point, pour point, heat content)Fuel oil storage tank types, sizing, and installation requirements (gravity feed and two-pipe systems)Fuel oil piping materials, joints, and connections per IMC Chapter 13Fuel oil pump types, operation, and testing procedures (pressure, cutoff, and vacuum tests)Oil burner nozzle selection, spray patterns, angles, and flow ratesFuel oil tank fill, vent, gauge, and safety valve requirementsOil leak detection, odor complaints, and buried tank pressure testingFuel delivery system troubleshooting (no oil, pump replacement, filter service)
Piping5 Q · 6%
Gas piping materials and allowable standards (steel, copper, CSST, polyethylene)Gas pipe sizing methods and sizing tables (longest length, branch length, hybrid pressure methods)Gas piping pressure testing, leak detection, and purging proceduresGas piping installation requirements (support, protection, burial depth, prohibited locations, bonding of CSST)Shutoff valves and pressure regulators for gas piping systemsHydronic piping materials, fittings, and joint types (copper, PEX, CPVC, steel)Fuel oil piping materials, installation, and system components (supply, return, vent, fill lines)Refrigerant tubing types, cutting, bending, and connection methods (flaring, brazing, soldering, swaging)
Key Distinctions
Pictorial Wiring DiagramvsLadder Diagram
A pictorial diagram shows the approximate physical location of devices and may show wire colors, while a ladder diagram shows the order of component operation using horizontal rungs between two vertical power lines.
Chapter 16, Section 16.1.1
PTC Relay (cool state)vsPTC Relay (heated state)
When cool, the PTC thermistor has low resistance (3–12 Ω) and carries startup current; once heated to its set point, resistance rises dramatically (10–20 kΩ), forcing current through the run capacitor instead.
Chapter 16, Section 16.3.5 — Positive Temperature Coefficient Relays
Solid-State Relay (SSR)vsElectromagnetic Relay
An SSR switches circuits using electronic components (transistors, SCRs, triacs) with no mechanical movement, whereas an electromagnetic relay uses physical mechanical parts to open or close contacts.
Chapter 16, Section 16.3.5 — Solid-State Relays
Building-Related Illness (BRI)vsSick Building Syndrome (SBS)
BRI is a specifically diagnosable illness caused by airborne agents whose symptoms do not disappear when the occupant leaves the building, while SBS has no identifiable illness or specific cause and its symptoms resolve once occupants leave.
Modern Refrigeration and Air Conditioning, Page 730
K-value measures heat flow through a standardized one-inch thickness of material per square foot per hour per 1°F difference, while C-value measures thermal conductance based on the material's actual measured thickness.
Modern Refrigeration and Air Conditioning, Page 986
ACR Tubing SizingvsCopper Water Tubing Sizing
ACR tubing is sized by its actual outside diameter, whereas copper water tubing nominal size equals the actual outside diameter minus 1/8 inch.
Modern Refrigeration And Air Conditioning, Chapter 8, Section 8.1.1
Galvanized PipevsBlack Pipe
Galvanized pipe is coated with zinc for corrosion resistance and is used primarily in water systems, while black pipe has no zinc coating and is used for gas lines and non-water applications.
Modern Refrigeration And Air Conditioning, Chapter 8, Section 8.2.3
Time-terminated defrost runs for a fixed preset duration regardless of actual coil condition, while temperature-terminated defrost ends the cycle when a sensor on the coil reaches a set temperature confirming frost has melted.
Modern Refrigeration and Air Conditioning, Chapter 21, Section 21.1.9
Hot-Surface Igniter (Glow Coil)vsFlame Rod
The glow coil is used only for ignition and cannot sense a flame, while the flame rod uses flame rectification to send a microamp signal back to the ignition control module to confirm burner flame presence.
Modern Refrigeration and Air Conditioning, Pages 1126-1128 (Sections 41.5.4 and 41.6.1)
CSST with Arc-Resistant JacketvsCSST without Arc-Resistant Jacket
Arc-resistant-jacketed CSST is considered bonded when connected to a properly grounded appliance and requires no separate bonding jumper, while standard CSST requires a bonding jumper of not less than 6 AWG copper wire connected to the grounding electrode system.
A pilot-operated reversing valve uses a solenoid pilot valve and capillary tubes to harness the suction-to-discharge pressure difference to shift the piston, while a direct-acting reversing valve uses direct mechanical action of the solenoid plunger and is used in smaller systems.
Modern Refrigeration and Air Conditioning, Pages 1094-1095
Gas Piping Pressure Test (< 10 ft³ or single-family dwelling)vsGas Piping Minimum Test Pressure
A system with volume less than 10 cubic feet or in a single-family dwelling requires a minimum test duration of 10 minutes, and in all cases test pressure must not be less than 3 psig regardless of design pressure.
Per 2018 IFGC Section 402.4.1, pipe size for each section is determined using the longest length of piping from the point of delivery to the most remote outlet combined with the load of that section.
Minimum Gas Piping Test Pressure 2018 IFGC, Section 406.4.1
Per 2018 IFGC Section 406.4.1, test pressure must be not less than 1½ times the proposed maximum working pressure, but never less than 3 psig regardless of design pressure.
CSST Bonding Jumper Maximum Length 2018 IFGC, Section 310.2.3
Per 2018 IFGC Section 310.2.3, the bonding jumper between a CSST gas piping system and the grounding electrode system shall not exceed 75 feet.
Underground Gas Piping Minimum Burial Depth 2018 IFGC, Section 404.12
Per 2018 IFGC Section 404.12, underground gas piping systems must be installed a minimum of 12 inches below grade.
Maximum Indoor Gas Piping Operating Pressure 2018 IFGC, Section 402.7
Per 2018 IFGC Section 402.7, gas piping located inside buildings using standard threaded joints shall not exceed a maximum operating pressure of 5 psig.
Unvented Room Heater Maximum Input Rating 2018 IFGC, Section 621.3
Per 2018 IFGC Section 621.3, unvented room heaters shall not have an input rating in excess of 40,000 Btu/h.
Per 2018 IFGC Section 621.6, the oxygen-depletion safety shutoff system on an unvented room heater must shut off gas supply when oxygen concentration drops to the manufacturer's specified level, but not lower than 18 percent.
Single-Wall Vent Connector Clearance to Combustibles 2018 IFGC, Table 503.10.5
Per 2018 IFGC Table 503.10.5, a single-wall metal vent connector must maintain a minimum clearance of 6 inches from combustible material for listed appliances with draft hoods.
Per 2018 IFGC Section 409.1.2, appliance shutoff valves are prohibited in concealed locations and furnace plenums.
Velocity Pressure Modern Refrigeration and Air Conditioning, Page 710
The difference between total air pressure and static air pressure, measured by a pitot tube; total pressure equals static pressure plus velocity pressure.
The difference between a system's cut-out and cut-in values (e.g., temperatures or pressures), representing the swing during which the system cycles on or off.
Competent Person (OSHA) OSHA 1926 CFR 29, Page 31
Per OSHA 29 CFR 1926.32(f), a person capable of identifying existing and predictable hazards who has authorization to take prompt corrective measures to eliminate them; no specific degree or certificate is required.
Per 2018 IFGC Appendix D Section D.2(4), a CGD reading of 20% LEL or greater requires immediate evacuation and calling 911.
Distributor (Refrigeration) Modern Refrigeration and Air Conditioning, Pages 490-491
A device connected to the outlet of a metering device that splits refrigerant flow into multiple parallel circuits within an evaporator, reducing pressure drop and providing more consistent coil temperatures.
Gas Piping as Grounding Electrode — Prohibition 2018 IFGC, Section 309.1
Per 2018 IFGC Section 309.1, gas piping is prohibited from being used as a grounding electrode.
Formulas to Know
Heating Temperature Difference (HTD)HTD = Indoor design temperature - Outdoor design (winter) temperature
Cooling Temperature Difference (CTD)CTD = Outdoor design (summer) temperature - Indoor design temperature
U-value from R-valueU = 1 / R_total
R-value from K-value (for actual thickness)R = thickness (inches) / K
Heat Transfer Multiplier (HTM)HTM = U × Temperature Difference (HTD or CTD)
Sensible Heat Load for Any Panel (wall, ceiling, floor, window)Q (Btu/h) = Area (ft²) × HTM [where HTM = U × ΔT]
Infiltration Load — ACH MethodQ_infiltration (Btu/h) = (Volume ft³ × ACH × 0.018) × ΔT [sensible; 0.018 = air heat capacity factor]
Total Air PressureP_total = P_static + P_velocity
Internal Sensible Load (Occupants)Q_occupants (Btu/h) = Number of occupants × Sensible heat gain per person (Btu/h)
Duct Conduction LoadQ_duct (Btu/h) = U_duct × A_duct × (Unconditioned space temp - Supply air temp)