Exam Cheat Sheet · Quick Reference

Oklahoma HVACR Contractor Unlimited

Oklahoma  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
90
Passing score
70%
Exam time
240 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Oklahoma State Portion 90 questions

Electrical Knowledge and Controls 15 Q · 17%
Ohm's Law, Watt's Law, and basic circuit calculations (series, parallel, series-parallel)Pictorial and ladder wiring diagrams for HVACR systemsControl system fundamentals: range and differential adjustment, cut-in and cut-out settingsTemperature motor controls: sensing bulbs, bimetal devices, and electronic thermistor sensorsPressure motor controls: high-pressure, low-pressure, oil pressure, and low-pressure safety controlsMotor starting relays: current relays, potential relays, solid-state relays, and PTC relaysContactors and motor starters for single-phase and three-phase motorsMotor protection devices: fuses (fast-acting, time-delay, multipurpose, current-limiting), circuit breakers, and bimetal protection
Natural Gas 12 Q · 13%
Gas piping materials, fittings, and allowable pipe types (steel, copper, CSST, polyethylene)Gas piping sizing methods: longest length, branch length, and hybrid pressure methodsAllowable pressure drop and maximum operating pressure in gas piping systemsCombustion air requirements: indoor, outdoor, and combination methods with sizing calculationsVenting system types and appliance categories (Category I–IV, Type B, Type BW, Type L vents)Chimney and vent connector installation, sizing, clearances, and termination requirementsGas appliance combustion: fuel properties, air-fuel ratios, flame characteristics, and incomplete combustionGas furnace ignition systems, safety controls, and combustion efficiency testing
Air Distribution Systems 25 Q · 28%
Duct system types and configurations (radial, extended plenum, reducing trunk, perimeter loop, SDHV)Duct construction materials, gauges, and joining methodsDuct sizing procedures and ACCA Manual D requirements (IMC 603.2)Registers, diffusers, grilles, and damper types and applicationsDuct insulation requirements, vapor retarders, and flame/smoke ratings (IMC Chapter 6)Ventilation rates, air changes per hour calculations, and outdoor air requirements (IMC Chapter 4)Exhaust system requirements by occupancy and application (IMC Chapter 5)Airflow measurement, system balancing, and duct leakage testing
Refrigeration and Air Conditioning Systems 20 Q · 22%
Compression refrigeration cycle operation and componentsMetering devices: types, selection, and operationCompressor types, drive configurations, and safety componentsHeat exchangers: evaporator and condenser types and defrost methodsRefrigerant classification, environmental regulations, and handling proceduresRefrigerant system service: charging, recovery, evacuation, and leak detectionHeat pump operation, components, and reversing valve functionCommercial refrigeration system configurations and troubleshooting
Heating Systems 15 Q · 17%
Gas-fired heating system components and operation (burners, gas valves, ignition systems, heat exchangers)Oil-fired heating system components and combustion efficiency testing (CO2, stack temperature, draft, smoke tests)Hydronic heating system components, designs, and controls (boilers, pumps, expansion tanks, piping configurations)Electric resistance heating systems (furnaces, duct heaters, baseboard units, heating elements)Heating and cooling load calculations (heat transfer, R/U/C/K values, Manual J method, design temperatures)Thermostat types, controls, and zoned system operationChimneys, vents, and combustion appliance venting requirements (IFGC/IMC code compliance)Solar heating systems and supplementary heat sources
Safety 3 Q · 3%
OSHA regulations and employer reporting requirementsLockout/tagout (LOTO) procedures for electrical safetyFire hazard identification and fire extinguisher use (P.A.S.S.)Refrigerant cylinder handling, storage, and pressure safetySafety Data Sheets (SDS) and Globally Harmonized System (GHS) labelingPersonal protective equipment (PPE) selection and useSafe work practices for ladders, scaffolding, and fall protectionConfined space entry hazards and precautions

Key Distinctions

Pictorial wiring diagramvsLadder wiring diagram

A pictorial diagram shows all connections plus the approximate physical location of devices in the unit (and often wire colors), while a ladder diagram shows the order of component operation as horizontal rungs (individual circuits with loads and controls) between two vertical power lines, with devices near the top energized first.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 18 - Electrical Troubleshooting Fundamentals, Page 369 (Section 18.2.2) (20th ed.: Chapter 16, Section 16.1.1)
K-value (thermal conductivity)vsC-value (thermal conductance)

K-value is heat passing through one square foot of material one inch thick in one hour per 1°F difference (Btu·in/hr·ft²·°F), while C-value is based on the material's actual measured thickness rather than a standardized 1-inch thickness.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 32 - Heating and Cooling Loads, Page 717 (20th ed.: Page 986)
Building-related illness (BRI)vsSick building syndrome (SBS)

BRI is a specifically diagnosable illness from airborne agents whose symptoms do NOT disappear when the occupant leaves, whereas SBS has no specific cause or identifiable illness and its symptoms disappear when occupants leave the building.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 29 - Air Quality, Page 647 (20th ed.: Page 730)
Subcooling charging methodvsSuperheat charging method

The subcooling method is used to check charge on systems with thermostatic expansion valves (low subcooling suggests undercharge, high suggests overcharge), while the superheat method is used on fixed-orifice systems such as capillary tubes.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 12 - Working with Refrigerants, Page 221 (20th ed.: Page 236)
In-line ammetervsClamp-on ammeter

An in-line ammeter must be wired in series with the load (in dc, black lead to negative and red lead to positive before energizing), while a clamp-on ammeter clamps around only a single conductor — clamping both hot and neutral makes the opposing magnetic fields cancel and the meter reads zero.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 18 - Electrical Troubleshooting Fundamentals, Page 362 ("In-Line Ammeters") (20th ed.: Chapter 17, Section 17.1.3 — In-Line Ammeters)
Range adjustment (low-pressure motor control)vsDifferential adjustment (low-pressure motor control)

Turning the range screw clockwise raises both cut-in and cut-out an equal amount (differential unchanged), while the differential screw turned clockwise raises only the cut-out pressure and does not affect cut-in.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 333 (Section 17.4.4) (20th ed.: Chapter 16, Section 16.3.4 — Low-Pressure Motor Controls)
Hot-surface igniter (glow coil)vsFlame rod / thermocouple

In an HSI system the glow coil only ignites and cannot sense flame; a separate flame rod proves flame by rectification (a dirty/oxidized rod makes the module close the gas valve seconds after ignition), and thermocouples are used in standing-pilot systems, not HSI.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 33 - Gas-Fired Heating Systems, Page 765 (20th ed.: Pages 1126-1128 (Sections 41.5.4 and 41.6.1))
Three-phase motors/powervsSingle-phase motors/power

Three-phase supply is already phase-split and its voltages peak at different times, so torque is produced without start windings or capacitors and power is essentially constant (never an instant when all voltages are zero), unlike single-phase, which needs phase-splitting components.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 16 - Electric Motors, Page 308 (Section 16.2.2) (20th ed.: Chapter 15, Section 15.2.2)
Current-limiting fusevsMultipurpose fuse

A current-limiting fuse uses temperature-sensitive resistors that open on overcurrent and close again when cooled (keeping current below rated locked rotor amperage), while a multipurpose fuse combines fast-acting and time-delay traits — riding through brief small overloads such as motor starting but blowing immediately above about 500% of rated current.

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 347 (Section 17.5.1) (20th ed.: Chapter 16, Section 16.4.1)
Natural gas piping scope (IFGC 2024 §101.2.3)vsLP-gas piping scope (IFGC 2024 §101.2.3)

The code covers natural gas piping systems operating at 125 psig or less, but LP-gas piping systems only at 20 psig (140 kPa gauge) or less, except as provided in Section 402.7.

IFGC 2024 Section 101.2.3 (2018 ed.: Section 101.2.2)
Duct leakage test before air handler installedvsDuct leakage test with air handler installed

Per the IECC, maximum leakage is 3 cfm per 100 ft² of conditioned space when tested before the air handler is installed, versus 4 cfm per 100 ft² when tested with the air handler installed (ducts pressurized to +25 Pa WRT the conditioned space).

Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 31 - Ventilation System Service, Page 703 (Section 31.1.5) (20th ed.: Page 793)
ACCA Manual DvsACCA Manual J / Manual S

Per IMC 2024 §603.2, Manual D (or the manufacturer's instructions or other approved methods) is an accepted duct sizing method within a single dwelling unit, while Manual J is for load calculations and Manual S for equipment selection; other buildings use the ASHRAE Handbook of Fundamentals.

IMC 2024 Section 603.2

Key Terms

Velocity pressure Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 28 - Air Movement and Measurement, Page 630 (20th ed.: Page 710)
The difference between total air pressure and static air pressure (total = static + velocity), measured with a pitot tube whose inner tube senses total pressure and outer side holes sense static pressure.
K-value (thermal conductivity) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 32 - Heating and Cooling Loads, Page 717 (20th ed.: Page 986)
The amount of heat that passes through one square foot of material one inch thick in one hour with a 1°F temperature difference across it (Btu·in/hr·ft²·°F).
Ladder diagram Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 18 - Electrical Troubleshooting Fundamentals, Page 368 (Section 18.2.1) (20th ed.: Chapter 16, Section 16.1.2)
A diagram in which the two vertical lines are the power supply and each horizontal rung is an individual circuit containing a load plus any switches, relays, or controls, arranged so devices nearer the top operate first.
Pictorial wiring diagram Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 18 - Electrical Troubleshooting Fundamentals, Page 369 (Section 18.2.2) (20th ed.: Chapter 16, Section 16.1.1)
A diagram that shows all connections among a circuit's devices plus the approximate physical location of those devices in the unit, and may also give wire colors.
Differential Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 325 (Section 17.2.2) (20th ed.: Chapter 16, Section 16.2.2)
The difference between a control's cut-out and cut-in values (for a heating system, cut-out minus cut-in), representing the swing over which the system cycles.
PTC relay (positive temperature coefficient) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 346 (Section 17.5) (20th ed.: Chapter 16, Section 16.3.5 — Positive Temperature Coefficient Relays)
A start device wired in parallel with the run capacitor that has low resistance (3 Ω to 12 Ω) when cool so current takes that path at start-up, then rises to 10 kΩ–20 kΩ as it heats, forcing current through the run capacitor.
Potential relay Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 339 ("Potential Relays") (20th ed.: Chapter 16, Section 16.3.5 — Potential Relays)
A motor start relay that actuates on the counter electromotive force (cemf) induced in the start winding; at about three-fourths of normal speed the cemf reaches pickup voltage, energizing the coil to open normally closed contacts and drop the start capacitor out.
Current relay Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 339 (Section 17.4.5) (20th ed.: Chapter 16, Section 16.3.5 — Current Relays)
A start relay with terminals L (line voltage), M (main/run winding), and S (start winding), having a normally open contact between L and S and the relay coil between L and M, with the hot wire landing on L.
High-pressure motor control Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 334 ("High-Pressure Motor Controls") (20th ed.: Chapter 16, Section 16.3.4 — High-Pressure Motor Controls)
A safety control usually set to cut out at 20% above normal head pressure to protect the compressor from high pressure and temperature and the motor from overheating and overloading.
Internal bimetal overload device Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 17 - Electrical Control Systems, Page 348 (Section 17.5.3) (20th ed.: Chapter 16, Section 16.4.3)
A protector located inside the compressor on or in the motor windings whose bimetal disc bends open on excessive current or heat and recloses when cooled, producing the characteristic shut-off/restart cycling.
Distributor Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 45 - Commercial Metering Devices and Valves, Page 1088 (Section 45.1.4) (20th ed.: Pages 490-491)
A device at the metering device outlet that splits refrigerant into several shorter parallel evaporator circuits, reducing pressure drop across the evaporator and giving more consistent coil temperature.
Sequencer Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 35 - Electric Heating Systems, Page 834 (20th ed.: Pages 1196 and 1205)
A device that opens and closes contacts on a time delay to energize electric furnace heating elements one after another (about 30 seconds apart) to minimize initial current draw.
Crankcase heater Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 43 - Commercial Compressors, Page 1045 (Section 43.1) (20th ed.: Page 467)
An electric heating element on or in the compressor that keeps it warm during the Off cycle so refrigerant does not condense in the crankcase, preventing liquid slugging and flooded starts.
Standard Method (indoor combustion air volume) IFGC 2024 Section 304.5.1
Per IFGC 2024 §304.5.1, the minimum required volume of indoor air shall be 50 cubic feet per 1,000 Btu/h of appliance input rating.
Duct pressure classification IMC 2024 Section 603.3
Per IMC 2024 §603.3, ducts are classified by maximum operating pressure at positive or negative 0.5, 1.0, 2.0, 3.0, 4.0, 6.0, or 10.0 inches of water column (values such as 0.25, 5.0, and 8.0 are not classifications).
Appliance elevation in garages/hazardous locations IFGC 2024 Section 305.3
Per IFGC 2024 §305.3 ignition sources must be not less than 18 inches above the floor in hazardous locations and public, private, repair, motor fuel-dispensing, and parking garages; per §305.5 appliances in private garages must be installed with a minimum clearance of 6 feet above the floor unless protected from vehicle impact and installed per §305.3.

Formulas to Know

Ohm's law (resistance and current)R = E ÷ I (e.g., 240 V ÷ 10 A = 24 Ω); I = E ÷ R (e.g., 24 V ÷ 8 Ω = 3 A, the same current through every load in a series circuit)
Watt's law (single-phase power)P = I × E (20 A × 120 V = 2400 W; 15 A × 240 V = 3,600 W; 8 A × 240 V = 1920 W)
Duct air velocity from velocity pressure (pitot tube)V = 4005 × √Pv, with Pv in inches of water (4005 × √0.25 = 2002.5 ≈ 2003 ft/min); for a swinging-vane anemometer (calibrated at 68°F) correct readings by velocity = instrument reading × √((460 + T) ÷ (460 + 68))
Air changes per hour and blower-door ACH50ACH = (cfm × 60 min) ÷ room volume in ft³; ACH50 = (cfm50 × 60) ÷ conditioned volume (1,500 cfm × 60 ÷ 12,000 ft³ = 7.5)
Electric heat capacity conversion1 kW = 3,413 Btu/hr; kW required = Btu/hr ÷ 3,413 (50,000 ÷ 3,413 = 14.65 kW)
Coefficient of performance from a P-h diagramCOP = refrigeration effect ÷ heat of compression = (compressor-in h − evaporator-in h) ÷ (compressor-out h − compressor-in h) = (179 − 116) ÷ (198 − 179) = 63 ÷ 19 = 3.32:1
Conduction heat load (HTM method)Q = U × area × temperature difference; HTM = U × HTD (wall: 0.07 × 50 = 3.50 Btuh/ft², 136 ft² × 3.50 = 476 Btuh; glass: 0.30 × 50 = 15.00, 60 ft² × 15.00 = 900 Btuh; net wall = gross wall − window and door areas = 216 − 80 = 136 ft²; single glass example: 1.13 × 70°F TD × 12 ft² ≈ 949 Btu/hr)
Slab and infiltration heating-load additionsSlab-on-grade: perimeter length (ft) × 18 Btu/hr per linear foot (0°F outdoor design), added to above-ground losses; infiltration (heating, sensible only): Qs = 0.018 × CFH × TD (latent excluded for heating; both sensible and latent are used for cooling)
Duct design friction rate and effective lengthsTEL = greatest supply-run effective length + greatest return-run effective length (180 + 120 = 300 ft); Friction Rate = (ASP ÷ TEL) × 100 = (0.20 ÷ 250) × 100 = 0.08 in. WC per 100 ft; total equivalent length = straight duct + elbow allowances (28 + 22 + 15 = 65 ft straight; + 2 elbows × 25 ft = 115 ft)
Motor synchronous speed and slipNS = (120 × frequency) ÷ number of poles; four-pole at 60 Hz = (120 × 60) ÷ 4 = 1800 RPM, and with 4%–5% slip actual full-load speed ≈ 1750 RPM