Exam Cheat Sheet · Quick Reference

Oklahoma Natural Gas Contractor

Oklahoma  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
40
Passing score
70%
Exam time
120 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Oklahoma State Portion 40 questions

General Fuel Gas Piping -- Knowledge, Definitions, and Regulations 10 Q · 25%
Key definitions in the Oklahoma Fuel Gas Code (IFGC 2018)Scope and applicability of the fuel gas code including systems and appliances outside scopePermit requirements, application procedures, and annual permitsCode official authority, duties, and enforcement powersInspection and testing requirements for fuel gas installationsApplicability rules for existing installations, additions, alterations, and repairsViolations, stop work orders, and unsafe installation provisionsAppeals process and board of appeals proceduresTesting and InspectionPipe Material Properties and Requirements
Pipe Sizing 12 Q · 30%
Maximum gas demand calculation and total connected loadPipe sizing methods: longest length, branch length, and hybrid pressureUsing sizing tables for Schedule 40 metallic pipe at various pressures and pressure dropsUsing sizing tables for CSST by EHD flow designationUsing sizing tables for semirigid copper tubingAllowable pressure drop and minimum appliance supply pressureMaximum operating pressure inside buildings and exceptionsAltitude adjustment for installations above 2,000 feet
Pipe Installation 15 Q · 38%
Pipe sizing methods and sizing tables for metallic pipe, copper tubing, CSST, and polyethylene pipeAllowable piping materials and material standards for gas piping systemsPipe joints, fittings, and connection methods including threading, brazing, welding, and press-connectProhibited piping locations and installation restrictions including underground, concealed, and through-building limitationsPressure testing, inspection, and purging requirements for gas piping systemsPiping support intervals and support methodsCorrosion protection and burial depth requirements for underground pipingShutoff valves, pressure regulators, and overpressure protection device requirementsIndoor and Outdoor Installation RequirementsGas Pressure RegulatorsStructural SafetyHangers and Supports +7 more
Safety 3 Q · 8%
Employer accident prevention responsibilities and job site inspection requirementsEmployee safety training and hazard recognition obligationsPersonal protective equipment (PPE) requirements and employer dutiesEmergency action plans and evacuation proceduresFirst aid, medical services, and emergency response requirementsFire protection and prevention program responsibilitiesHousekeeping requirements for construction sitesPrime contractor and subcontractor safety responsibility and joint liabilitySanitationContractor ResponsibilitiesExcavation SafetyVentilation and Confined Space +8 more

Key Distinctions

Longest Length Method (IFGC 402.4.1 / Appendix A A103.1)vsBranch Length Method (IFGC 402.4.2)

Under the longest length method every section and branch is sized from the table row for the system's single longest run (e.g., a 12-ft branch is still sized on the 70-ft row), while under the branch length method each branch is sized using its own measured length from the meter (main length to the tee plus the branch length).

IFGC Section 402.4.1, Longest Length Method; Table 402.4(2), Schedule 40 Metallic Pipe (natural gas, 0.5 in. w.c. drop)
Low-pressure gas sizing equation (Equation 4-1)vsHigh-pressure gas sizing equation (Equation 4-2)

Equation 4-1 applies to gas pressures less than 1½ psi (10.3 kPa); Equation 4-2 applies at 1½ psi and above.

IFGC 2024 Section 402.4
Natural gas piping scope (IFGC 101.2.3)vsLP-gas piping scope (IFGC 101.2.3)

The code covers natural gas piping systems operating at 125 psig or less, but LP-gas piping systems only at 20 psig (140 kPa gauge) or less, except as provided in Section 402.7.

IFGC 2024 Section 101.2.3 (2018 ed.: Section 101.2.2)
Appliance in a private garage (IFGC 305.5)vsAppliance in a public/repair garage or motor fuel-dispensing facility (IFGC 305.4)

Private garages require a minimum clearance of 6 feet above the floor (unless protected from vehicle impact and installed per 305.3), while public garages, repair garages, motor fuel-dispensing facilities and other areas frequented by motor vehicles require not less than 8 feet above the floor.

IFGC 2024 Section 305.5
Appliance clearance above floor (IFGC 305.5)vsIgnition source elevation (IFGC 305.3)

The appliance itself must be 6 feet above a private garage floor, whereas the source of ignition must be elevated not less than 18 inches above the floor in hazardous locations and public, private, repair, parking garages and motor fuel-dispensing facilities.

IFGC 2024 Section 305.3
Outdoor combustion air through horizontal ducts (IFGC 304.6.1)vsOutdoor combustion air through vertical ducts or direct communication

Horizontal ducts require each opening to have not less than 1 square inch of free area per 2,000 Btu/h of total input, double the 1 square inch per 4,000 Btu/h required for vertical ducts or direct communication.

IFGC 2024 Section 304.6.1
Standard Method indoor combustion air volume (IFGC 304.5.1)vsOpenings combining spaces on the same story (IFGC 304.5.3.1)

The Standard Method sets a minimum room volume of 50 cubic feet per 1,000 Btu/h of appliance input, while combining-space openings are sized at 1 square inch of free area per 1,000 Btu/h of total input but never less than 100 square inches each.

IFGC 2024 Section 304.5.1
Category III vented appliance (IFGC 202)vsCategory IV vented appliance (IFGC 202)

Both operate at positive vent static pressure, but Category III has a vent gas temperature that avoids excessive condensate production while Category IV produces excessive condensate; Categories I and II operate at nonpositive vent static pressure.

IFGC 2024 Section 202
IFGC Table 402.4(1)vsIFGC Table 402.4(2)

Both are Schedule 40 metallic pipe tables for natural gas at less than 2 psi inlet, but Table 402.4(1) is based on a 0.3 in. w.c. pressure drop and Table 402.4(2) on a 0.5 in. w.c. pressure drop, giving different capacities for the same size and length.

IFGC 2024 Table 402.4(1)
2A-rated fire extinguisher (OSHA 1926.150(c)(1)(i))vs10B-rated fire extinguisher (OSHA 1926.150(c)(1)(vi))

A 2A extinguisher is required for each 3,000 square feet of protected building area with travel distance not exceeding 100 feet, whereas a 10B extinguisher must be within 50 feet of wherever more than 5 gallons of flammable/combustible liquid or 5 pounds of flammable gas is in use.

OSHA 1926 CFR 29, §1926.150(c)(1)(i), Page 177
Prime contractor responsibility (OSHA 1926.16)vsSubcontractor responsibility

Subcontractors share joint responsibility for their own portion of the work, but in no case may the prime contractor be relieved of overall responsibility for compliance for all work performed under the contract.

OSHA 1926 CFR 29, §1926.16, Page 29
Written emergency action planvsOrally communicated emergency action plan (OSHA 1926.35(e)(3))

A written plan is normally required, but employers with 10 or fewer employees may communicate the plan orally and need not maintain a written plan.

OSHA 1926 CFR 29, §1926.35(e)(3), Page 33

Key Terms

Competent person (OSHA 1926.32(f)) OSHA 1926 CFR 29, §1926.32(f), Page 31
One who is capable of identifying existing and predictable hazards in the surroundings or working conditions that are unsanitary, hazardous or dangerous to employees and who has authorization to take prompt corrective measures to eliminate them.
Emergency action plan (OSHA 1926.35(b)) OSHA 1926 CFR 29, §1926.35(b), Page 33
A plan whose required minimum elements are emergency escape procedures, procedures for employees remaining for critical operations, procedures to account for all employees after evacuation, rescue and medical duties, preferred means of reporting emergencies, and names/titles of contact persons — an inventory of tools and equipment is not required.
Permissible noise exposure, 8 hours (OSHA 1926.52, Table D-2) OSHA 1926 CFR 29, §1926.52, Table D-2, Page 36
The maximum permissible sound level for an 8-hour work day is 90 dBA slow response.
First aid kit inspection (OSHA 1926.50(d)(2)) OSHA 1926 CFR 29, §1926.50(d)(2), Page 33
Kit contents must be checked by the employer before being sent out on each job and at least weekly on each job so expended items are replaced.
Scope of IFGC Chapter 4 (IFGC 401.1) IFGC 2024 Section 401.1
Piping system requirements apply from the point of delivery to the connections with the appliances and include design, materials, components, fabrication, assembly, installation, testing, inspection, operation and maintenance.
Abandoned permit application (IFGC 105.3.1) IFGC 2024 Section 105.3.1
An application for a permit is deemed abandoned 180 days after the date of filing unless it has been pursued in good faith or a permit has been issued.
Elevator shaft prohibition (IFGC 301.15) IFGC 2024 Section 301.15
Appliances, equipment and systems regulated by the code shall not be located in an elevator shaft, with no exception for ventilation.
Working space (IFGC 306.1) IFGC 2024 Section 306.1
A level working space not less than 30 inches deep and 30 inches wide must be provided in front of the control side to service an appliance.
Standard Method (indoor combustion air) (IFGC 304.5.1) IFGC 2024 Section 304.5.1
The method in which the minimum required indoor air volume is 50 cubic feet per 1,000 Btu/h of appliance input rating.
Minimum dimension of combustion air openings (IFGC 304.6, also 304.5.3.1 and 304.7.3) IFGC 2024 Section 304.5.3.1
Air openings used for combustion air shall have a minimum dimension of not less than 3 inches (76 mm).
Volumetric flow rate for sizing (IFGC 402.2) IFGC 2024 Section 402.2
The gas flow used for sizing is the sum of the maximum input of the appliances served (total connected hourly load), assuming all appliances could operate at full capacity simultaneously.
Altitude adjustment (IFGC 402.2) IFGC 2024 Section 402.2
The volumetric flow rate of gas to be provided must be adjusted for altitude where the installation is above 2,000 feet (610 m) in elevation.
Approved pipe sizing methods (IFGC 402.3) IFGC 2024 Section 402.3
Gas piping shall be sized by (1) pipe sizing tables or sizing equations, (2) the sizing tables in a listed piping system manufacturer's installation instructions, or (3) other approved engineering methods; field-experience estimating is not approved.
ΔH and pressure-drop units (IFGC 402.4) IFGC 2024 Section 402.4
In the low-pressure sizing equation ΔH is the pressure drop expressed in inches water column, where 27.7 inches water column equals 1 psi.
C and Y factors for natural gas (IFGC Table 402.4) IFGC 2024 Table 402.4
For natural gas at standard conditions the sizing-equation C value is 0.6094 and the Y value is 0.9992.
Meter interconnection prohibition (IFGC 401.6) IFGC 2024 Section 401.6
Where two or more meters are installed on the same premises but supply separate consumers, the piping systems shall not be interconnected on the outlet side of the meters, regardless of tenant agreements.
Condensate drain sizing and slope (IFGC 307.2, 307.3) IFGC 2024 Sections 307.2, 307.3
Condensate waste and drain line shall be not less than 3/4-inch internal diameter, shall not decrease in size from the drain pan connection to the point of disposal, and shall slope not less than one-eighth unit vertical in 12 units horizontal (1-percent) toward discharge.
Minimum supply pressure requirement (IFGC 402.1) IFGC 2024 Section 402.1
Piping systems shall be sized and installed to meet the maximum demand and to supply gas to each appliance inlet at not less than the minimum supply pressure required by that appliance.

Formulas to Know

Convert appliance input to gas demand in cfh (natural gas at 1,000 Btu per cubic foot)cfh = total Btu/h ÷ 1,000; e.g., 100,000 + 40,000 + 65,000 + 35,000 = 240,000 Btu/h ÷ 1,000 = 240 cfh
Load carried by a main section or branchSection load = sum of the Btu/h of all outlets downstream of that point ÷ 1,000; past the last tee the section carries only the last appliance (e.g., 40,000 ÷ 1,000 = 40 cfh)
Spare (excess) capacity of an installed pipeSpare cfh = table capacity at that size and length − appliance demand; e.g., 247 − 35 = 212 cfh, 322 − 150 = 172 cfh, 452 − 340 = 112 cfh
Table length row selection — longest length methodSize every section and branch from the row for the system's longest run measured meter-to-farthest-outlet, not the branch's own length (e.g., a 12-ft branch is read on the 70-ft row)
Table length row selection — branch length methodBranch length = main length from meter to its tee + branch length (e.g., 15 + 5 = 20 ft; 30 + 20 + 15 = 65 ft → 70-ft row; 30 + 12 = 42 ft → 50-ft row); read the next table row equal to or greater than that length
Identifying the most remote outletCompare each outlet's length from the meter (e.g., 23 ft, 55 ft, 45 ft); the longest (55 ft) is the most remote and sizes the mains feeding it, read on the next row up (60 ft)
Minimum pipe size selection from Table 402.4At the governing length row, choose the smallest nominal size whose capacity ≥ demand (e.g., 100 ft, 0.5 in. w.c.: 195 and 400 cfh are insufficient for 500 cfh, so 1-1/2 in. at 600 cfh is the minimum)
CSST equivalent length for extra bends/fittings (Table 402.4(15), Note 1)L = 1.3n, where L is additional tubing length in feet and n is the number of fittings or bends beyond the standard four 90-degree bends and two end fittings; e.g., 6 bends − 4 standard = 2, L = 1.3 × 2 = 2.6 ft
Pressure test duration (IFGC 406.4.2)Duration = ½ hour per 500 cubic feet of pipe volume or fraction thereof; 1,200 ÷ 500 = 2.4 → 3 increments × 0.5 hr = 1.5 hours
Combustion air quantitiesStandard Method indoor volume = 50 cu ft per 1,000 Btu/h input; combining-space openings = 1 sq in per 1,000 Btu/h but not less than 100 sq in each; outdoor horizontal ducts = 1 sq in per 2,000 Btu/h; vertical ducts/direct = 1 sq in per 4,000 Btu/h