Exam Cheat Sheet · Quick Reference

South Carolina Concrete

South Carolina  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
50
Passing score
70%
Exam time
180 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

South Carolina State Portion 50 questions

Safety 6 Q · 12%
Personal protective equipment (PPE) requirements for concrete workFall protection systems for formwork and reinforcing steelFormwork and shoring safety requirementsLockout/tagout procedures for concrete equipmentExcavation safety and cave-in protectionHazardous materials exposure limits (silica dust, cement burns, airborne contaminants)Underground utility identification and protection before excavationFirst aid, medical services, and emergency response on jobsites
Concrete - Earthwork 7 Q · 14%
Soil types and bearing capacityGeotechnical investigations and soil testingSoil compaction methods and moisture requirementsExcavation near existing foundations and underpinningGroundwater control and dewatering methodsBackfill placement and compaction requirementsSC 811 notification requirements and excavator responsibilitiesTolerance zone requirements and safe digging practices
Concrete 15 Q · 30%
Concrete mixture design and proportioning (water-cementitious ratio, admixtures, air entrainment, slump, strength testing)Reading and applying the concrete specification (prescriptive vs performance requirements, tolerances, acceptance testing)Foundations: subgrade preparation, footings, and foundation wallsReinforcement in structures: placement, cover, support, and tolerancesJoints and embedments in structural concreteJoints and reinforcement for slabs-on-groundPreparing for concreting: weather protection, pre-placement checks, and site readinessConcrete placement, consolidation, and finishing methods (pumping, buckets, buggies, conveyors)Curing, protection, and common field problems - cause and prevention (cracking, scaling, curling)SC Building Code Chapter 19 concrete requirements, special inspections, and testing
Concrete - Reinforcement 10 Q · 20%
Types of reinforcement (deformed bars, welded wire reinforcement, fiber-reinforced concrete, prestressing tendons)Reinforcing bar grades, sizes, and identification markingsConcrete cover requirements for reinforcing steelSplices (lap, mechanical, and welded) — types, lengths, and placementPlacing tolerances for reinforcing bars (ACI 117 requirements)Bar supports — types, selection, and placementFabrication of reinforcing bars (bending, hooks, bend shapes, and minimum bend diameters)Special inspection requirements for concrete reinforcement (SC Building Code Chapter 17)
Concrete - Formwork 12 Q · 24%
Formwork loads: vertical dead and live loads, lateral concrete pressure, and load combinationsConcrete lateral pressure on vertical forms: factors affecting pressure, rate of placement, temperature, admixtures, and ACI 347R pressure equationsFormwork materials: lumber species and grades, plywood, steel, aluminum, and proprietary panel systemsDesign of slab, wall, beam, and column forms: member sizing, span tables, deflection limits, and allowable stress designShoring, reshoring, and backshoring: design, load distribution in multi-story structures, and removal criteriaFormwork erection, inspection, stripping, and form reuse practicesOSHA 29 CFR 1926 Subpart Q safety requirements for concrete formwork and shoringFormed concrete surface quality: tolerances, surface finish classifications, and defect prevention

Key Distinctions

Quality controlvsQuality assurance

Quality control is the action/documentation taken to control the product so applicable standards and contract documents are followed, while quality assurance is the action/documentation verifying that those controls are in place and working in accordance with applicable standards.

The Contractor's Guide to Quality Concrete Construction, Page 132
Column (ACI 347R lateral pressure)vsWall (ACI 347R lateral pressure)

For applying ACI 347R lateral pressure formulas, a column is a vertical element with no plan dimension larger than 6.5 ft (2 m), whereas a wall has at least one plan dimension exceeding 6.5 ft (2 m); the classification determines which pressure equation applies.

Contractor's Guide to Quality Concrete Construction (4th ed.), ACI 347R, Table 5.2 (Book Page 71)
Effective section modulus (KS) for plywoodvsMoment of inertia (I) for plywood

Per SP-4 Section 4.3.5, tabulated effective section modulus KS must be used for all bending stress calculations, while moment of inertia I is used only for deflection calculations (effective I ÷ distance to extreme fiber does not equal effective KS for plywood).

ACI SP-4 Formwork for Concrete (8th ed.), Section 4.3.5
Pier shaft form stripping timevsSupported cap beam form stripping time

In the SP-4 Chapter 3 bridge planning example, pier shaft forms are assumed strippable 1 day after placing while supported cap beam forms must stay in place 14 days, and that longer required curing/stripping period is the primary factor driving the need for two complete cap beam form sets.

SP-4 Chapter 3, Section 3.7
Form tie safety factorvsForm anchor safety factor

The usual safety factor for form tie working loads is 2:1 (working load limited to half of ultimate tensile strength), while form anchors securing forms to previously placed concrete require a minimum safety factor of 3 including live load and impact because the concrete may still be 'green.'

Contractor's Guide to Quality Concrete Construction (4th ed.), Page 66
Bank cubic yardsvsLoose cubic yards

Bank yards are the in-place excavated volume (length × width × depth ÷ 27), while loose yards are the swelled hauled volume (bank × (1 + swell %)); haul-off truck loads must be figured from loose yards, since using bank volume undercounts loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
IRC R317.1 Item 1 – wood over crawl space groundvsIRC R317.1 Item 2 – wood on exterior foundation walls

Wood joists or the bottom of a wood structural floor in a crawl space/unexcavated area within the foundation periphery need naturally durable or preservative-treated wood when closer than 18 in. to exposed ground, while wood framing members including columns resting directly on concrete or masonry exterior foundation walls need it when less than 8 in. from exposed ground.

IRC Section R317.1, Item 1; IRC 2018 Section R317.1
Exposure class F3 (freeze-thaw plus deicing chemicals)vsExposure class S2 (sulfate 1500–10,000 ppm) and W1 (low permeability)

Per Table 2.5, F3 permits a maximum w/cm of 0.40 with 5000 psi minimum, S2 permits 0.45 with 4500 psi minimum, and W1 (concrete in contact with water requiring low permeability) permits 0.50 with 4000 psi minimum.

Contractor's Guide to Quality Concrete Construction (4th ed.), Page 24 (Table 2.5)
Cylinder storage 60 to 80°FvsCylinder storage 68 to 78°F

Jobsite storage of strength test cylinders must be at 60 to 80°F (16 to 27°C) for specified strengths less than 6000 psi, while the tighter 68 to 78°F range applies only to specified strengths of 6000 psi or greater.

Contractor's Guide to Quality Concrete Construction (4th ed.), Page 149
Strength acceptance Criteria AvsStrength acceptance Criteria B

Criteria A requires the average of any three successive tests to equal or exceed the specified fc′, while Criteria B requires that no single test fall below fc′ by more than 500 psi (3.5 MPa) for fc′ of 5000 psi or less (or more than 10 percent of fc′ when fc′ exceeds 5000 psi).

Contractor's Guide to Quality Concrete Construction (4th ed.), Pages 149-150
Vented crawl space without ground vapor retardervsVented crawl space with approved Class I vapor retarder

Per IRC R408.2 the minimum net ventilation opening area is 1 sq ft per 150 sq ft of under-floor area, but may be reduced to 1/1,500 of the under-floor area where an approved Class I vapor retarder covers the ground surface.

IRC Section R408.2; IRC 2018 Section R408.2
Retarding admixture effect on formworkvsFly ash / slag cement replacement effect on formwork

Retarders delay setting, raise lateral form pressure (chemistry coefficient CC of 1.2 versus 1.0) and require lengthened stripping times, while replacing part of the portland cement with fly ash or slag cement can require about twice the cure time before forms are stripped due to slower early strength gain.

Contractor's Guide to Quality Concrete Construction (4th ed.), Page 82
Prescriptive footing for one/two floors of light-frame constructionvsPrescriptive footing for three floors of light-frame construction

Per Table 4.1 (adapted from 2015 IBC Table 1809.7), one floor requires 12 in. width × 6 in. thickness and two floors 15 in. width × 6 in. thickness, while three floors require 18 in. width × 8 in. thickness.

Contractor's Guide to Quality Concrete Construction (4th ed.), Page 47 (Table 4.1)

Key Terms

Competent person (29 CFR 1926.32(f)) OSHA 1926 CFR 29, Page 31
One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees and who has authorization to take prompt corrective measures to eliminate them (no specific degree, experience, or certificate required).
Danger sign (29 CFR 1926.200(b)(2)) OSHA 1926 CFR 29, Page 201
A sign having red as the predominating color for the upper panel, a black outline on the borders, and a white lower panel for additional sign wording.
Fire extinguisher requirement (29 CFR 1926.150(c)(1)(i)) OSHA 1926.150(c)(1)(i)
An extinguisher rated not less than 2A must be provided for each 3,000 square feet of protected building area, or major fraction thereof.
Fire alarm system (29 CFR 1926.150(e)) OSHA 1926.150(e)(1) and (e)(2)
An alarm system (e.g., telephone system, siren) that the employer must establish so employees on site and the local fire department can be alerted for an emergency, with alarm code and reporting instructions conspicuously posted at phones and employee entrances.
First aid kit inspection (29 CFR 1926.50) OSHA 1926 CFR 29, Page 33
Kit contents must be checked by the employer before being sent out on each job and at least weekly on each job so expended items are replaced.
Qualified operator (29 CFR 1926.20(b)(4)) OSHA 1926 CFR 29, Page 29
The employer shall permit only those employees qualified by training or experience to operate equipment and machinery.
Tolerance zone (SC Section 58-36-20(21)(a)) SC 811 Excavator Manual (2026), Page 28 (Tolerance Zone & Safe Digging Practices)
The area on either side of the designated center line of an underground facility equal to one-half of the known diameter plus 24 inches.
Expansive soil (SC Building Code 1803.5.3, Item 4) SC Building Code, Section 1803.5.3
Soil with an expansion index greater than 20 determined in accordance with ASTM D4829 (a plasticity index of 15 or greater is a separate criterion under Item 1).
Independent testing laboratory Contractor's Guide to Quality Concrete Construction (4th ed.), Page 133
A testing laboratory contracted to conduct acceptance testing of materials and workmanship that has no financial stake in the contractor's work and no affiliation with any member of the contracted construction team.
Site-specific quality plan Contractor's Guide to Quality Concrete Construction (4th ed.), Page 134
The expression of the project goals and the steps required to reach them, implemented through procedures that detail operations, define acceptance criteria, establish responsibilities, and list required documentation.
Camber Contractor's Guide to Quality Concrete Construction (4th ed.), Page 77
A slight upward curvature intentionally built into a structural element or form to compensate for deflection under loads, shrinkage, and creep; a common rule of thumb is 1/4 in. per 10 ft of span.
Maturity meter testing Contractor's Guide to Quality Concrete Construction (4th ed.), Page 81
An in-place strength method that measures concrete temperature over a period of time to calculate strength, requiring a prior correlation between the measured property and the strength of the actual mixture (pullout and penetration tests are other alternatives to cylinders).
Unit weight (density) test Contractor's Guide to Quality Concrete Construction (4th ed.), Page 149
A convenient fresh-concrete field test that, together with batch weights and measured air content, gives a good indication of water content because water is the lightest component and quickly affects unit weight; it can be run with any air content method.
Air entrainment Contractor's Guide to Quality Concrete Construction (4th ed.), Page 181
Entrained air required in all concrete that will be exposed to freezing weather in service because it is less susceptible to freezing damage; for flatwork exposed to freeze-thaw and deicing chemicals, approximately 5 to 8 percent air (slightly more when coarse aggregate is smaller than 3/4 in.) is the single most important factor preventing scaling.
Minimum concrete cover (ACI 318 per Table 6.3) Contractor's Guide to Quality Concrete Construction (4th ed.), Page 100 (Table 6.3)
For cast-in-place concrete cast against and permanently exposed to earth, such as footings, the minimum cover is 3 in. (75 mm).
Lap splice minimum length Contractor's Guide to Quality Concrete Construction (4th ed.), Page 105
A lap splice may be designated in inches or bar diameters but should never be less than 12 in. (300 mm) to ensure adequate load transfer between lapped bars.
Architectural formwork deflection limit (ACI 347R-14 Section 7.4.3) ACI SP-4 Formwork for Concrete (8th ed.), Appendix E (ACI 347R-14), Page E-23
Limiting deflection of sheathing, studs, and wales to l/400 (l = clear span between supports) is satisfactory for most architectural formwork, where deflection rather than bending or shear usually governs design.
Bar support height tolerance Placing Reinforcing Bars (10th ed.), Chapter 10 — Bar Supports
Bar support height is measured from the bottom of the leg, sand plate, or runner wire to the underside of the reinforcing bar, and a variation of ±1/8 in. from the specified nominal height is a normal construction tolerance.
Complete load path (IRC R301.1) IRC Section R301.1
Construction must result in a system providing a complete load path for the transfer of loads from their point of origin through the load-resisting elements to the foundation.
Frost-protected shallow foundation (IRC R403.3) IRC Section R403.3; IRC 2018 Section R403.3
Where a building's monthly mean temperature is maintained at not less than 64°F (18°C), footings need not extend below the frost line if protected by insulation per Figure R403.3(1) and Table R403.3(1); this method shall not be used for unheated spaces.

Formulas to Know

Concrete volume in cubic yards (footings, piers, slabs)Volume (cu yd) = length (ft) × width (ft) × depth (ft) ÷ 27; e.g., pier 2.5 × 2.5 × 1 = 6.25 cu ft, ×3 piers = 18.75 ÷ 27 = 0.69 cu yd
Continuous footing lengthFooting length = outside perimeter = 2 × (length + width); e.g., 2 × (40 + 28) = 136 lin ft
4-inch slab concrete order (Table 11-1)At 4 in. thickness one cubic yard covers 81 sq ft: cu yd = slab area ÷ 81, rounded UP to whole yards (check: area × 0.333 ft ÷ 27)
8-inch foundation wall concrete from printed tableWall area (sq ft) = perimeter × height; cu yd = (area ÷ 100) × 2.47 cu yd per 100 sq ft (check: area × 0.667 ft ÷ 27)
Wall form contact areaContact area = both faces = 2 × perimeter (ft) × wall height (ft)
Ordering rules for concreteContinuous footing: round net volume UP to the next quarter yard (e.g., 5.10 → 5.25 cu yd); combined total orders: sum net volumes, then round UP to the next whole yard (e.g., 17.65 → 18 cu yd)
Swell / haul-off quantitiesLoose cu yd = bank cu yd × (1 + swell %); truck loads = loose cu yd ÷ load capacity, rounded UP; extra loose yards from a 10% higher swell = bank cu yd × 0.10
Jobsite water addition effectAdding 1 gal of water per cu yd (5 L/m³) increases slump ≈1 in. (25 mm) and reduces compressive strength ≈150 psi (1.0 MPa), plus increased shrinkage
Interior shore load for continuous spans (SP-4 Section 8.1)Center shore load for a two-span uniform load = 1.25wℓ; for non-manufactured shores either consider continuity or increase the simple tributary-area load by 25%
Concrete block layout (8-inch block)Three courses stack 2 ft: courses = height (ft) × 3/2; three blocks lay 4 ft: blocks per course = wall length (ft) × 3/4