Exam Cheat Sheet · Quick Reference

South Carolina Grading

South Carolina  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
40
Passing score
70%
Exam time
120 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

South Carolina State Portion 40 questions

General Knowledge 15 Q · 38%
Reading and interpreting survey stakes (cut, fill, slope stakes)Plan reading: grading plans, contour lines, cross sections, and profile sheetsStation numbering and engineer's measure (decimal feet)Earthwork quantity calculations: average-end-area method, mass diagram, cut/fill volumesEquipment selection and planning for excavation operationsEquipment economics: ownership and operating costs, depreciation methodsMobile equipment power requirements: rolling resistance, grade resistance, rimpull, and drawbar pullTruck and hauling equipment productivity, cycle time, and load capacityChapter 2 - Equipment EconomicsChapter 6 - Mobile Equipment Power RequirementsPlan ReadingChapter 3 - Planning for Earthwork Construction +8 more
Excavating and Grading 20 Q · 50%
Underground utility locate requirements and SC 811 notification proceduresSoil and rock classification for excavation (common, rock, muck, unclassified)Earthwork volume calculations, mass diagrams, and haul distance/overhaulClearing, grubbing, and stripping operations per SCDOT specificationsEmbankment construction, lift thickness, and compaction requirementsSubgrade preparation, proof rolling, and compaction testingGrade setting techniques using stakes, lasers, GPS, and survey instrumentsErosion and sediment control measures during grading operationsSection 815 Erosion ControlChapter 7 - Dozers and GradersChapter 9 - ExcavatorsTrenching and Pipe Laying +14 more
Safety - Code of Federal Regulations 5 Q · 12%
Cave-in prevention and protective systems (sloping, benching, shoring, shielding)Soil classification types (Stable Rock, Type A, Type B, Type C) and field testing methodsCompetent person duties and excavation inspection requirementsExcavation access, egress, and worker protection from falling loads and vehicular trafficHazardous atmosphere testing and emergency rescue in excavationsPersonal protective equipment requirements (head, eye, foot, hearing, respiratory, electrical)Rollover protective structures (ROPS) and overhead protection for earthmoving equipmentConstruction site signs, signals, barricades, and traffic control devicesSubpart P—ExcavationsSubpart E-Personal Protective and Life Saving EquipmentSubpart O—Motor Vehicles, Mechanized Equipment, and Marine OperationsSubpart C-General Safety and Health Provisions

Key Distinctions

Type 1 differing site conditionvsType 2 differing site condition

Type 1 exists when actual conditions differ materially from those indicated in the contract, while Type 2 arises when actual conditions differ from what would reasonably be expected; neither relieves the contractor of the duty to thoroughly examine project conditions.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Earthwork Planning section (p. 121)
Bridge (SCDOT)vsCulvert

A structure erected over a depression or obstruction carrying a passageway for traffic is a bridge rather than a culvert when its length measured along the center of the roadway is more than 20 feet.

SCDOT Standard Specifications for Highway Construction, Subsection 101.3.8, Page 5
Double horizontal line on a cut/information stakevsSingle horizontal line on a cut/information stake

A double horizontal line means 'and then' — everything below it is measured from the RS/RP (reference) point, while a single line means all measurements and elevations are taken from the surveyor's hub beside the information stake.

Excavation and Grading Handbook, Chapter 1 — Cut Stakes section (Page 9)
SAE loader bucket heaped rating (J742b)vsSAE/PCSA shovel and hoe bucket rating

The front-end loader bucket standard rates material above the struck load at a 2:1 angle of repose, whereas shovel and hoe buckets are rated at a 1:1 repose angle.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 9 — Loaders, Fill Factors for Loader Buckets section
Bank cubic yards (bcy)vsLoose cubic yards (lcy)

Excavation quantity is figured in bank yards (in-place volume), but haul-off and truck loads must be figured in loose yards after applying swell — dividing bank volume by truck size under-counts the loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Ownership costvsOperating cost

Tires are deducted from the delivered price and carried as an operating cost (about 35% of a haul truck's operating cost) because they wear out faster than the machine, and normal maintenance repairs are operating costs, while major repairs and overhauls that extend service life are ownership costs added to the adjusted basis and depreciated.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Elements of Ownership Cost, Purchase Expense section (p. 72) and Cost for Bidding, Ownership Cost section (p. 88)
Diesel engine fuel ratevsGasoline engine fuel rate

For estimating, a diesel engine consumes about 0.04 gal per flywheel-horsepower-hour while a gasoline engine consumes about 0.06 gal per flywheel-horsepower-hour.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Elements of Operating Cost, Fuel section (p. 82) and Example 2.12 (p. 96)
Two-cycle naturally aspirated diesel altitude deratingvsFour-cycle engine altitude derating

A two-cycle diesel holds full power to 1,000 ft and then loses about 0.9% per additional 1,000 ft (its low-pressure intake blower), while the four-cycle rule is about 3% per 1,000 ft.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 6 — Altitude's Effect on Usable Power section (pp. 265–266)
Mechanical machine repair cost splitvsHydraulic machine repair cost split

PCSA data assume mechanical machines split repair cost half materials/parts and half labor, while hydraulic machines are two-thirds materials/parts and one-third labor.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Cost for Bidding, Repairs section (p. 97)
MACRS 3-year propertyvsMACRS 5-year property

Cars and light-duty trucks under 13,000 lb unloaded are 3-year property, while most other pieces of construction equipment are 5-year property.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Tax Code Depreciation Schedules section (p. 78)
Barrier curb (14-in., on or below subgrade)vsExtruded glue-down curb

For barrier curb, good practice is to cut the subgrade 2 feet behind the back of curb so the crew can set forms or run the curb machine, whereas the 6-inch figure applies to how far behind an extruded (glue-down) curb aggregate must be placed.

Excavation and Grading Handbook, Pages 185 and 193 (Chapter 10 — Curbs and Paving section)
Hub-to-back-of-curb offset for formingvsHub-to-back-of-curb offset for a concrete (slip-form) machine

The normal minimum offset is 2 feet for forming, but surveyors must set a 3-foot offset to back of curb when a concrete machine is used on Type 2 or Type 1-A curb so the men and machine have room to work.

Excavation and Grading Handbook, Pages 287 and 289 (Chapter 17 — Curb Stakes / Cutting Curb Grade)
Cut shown on the information stakevsFill shown on the information stake

When the surveyors show a cut, the road/parking section thickness is added to the cut to get the cut to subgrade — but the grade setter adds slightly less than the full section (e.g., 0.60 added to a 1.20 cut for an 8-in./0.66-ft parking section = 1.80) to leave the grade about 0.06 ft high for compacting; when they show a fill, the fill is ADDED to the rod reading before the full road section is subtracted (4.20 + 0.50 − 0.85 = 3.85 subgrade).

Excavation and Grading Handbook, Page 97 (Chapter 5 — Using a Laser Level on a Road Project section)
Positive Response Code 110 (Extraordinary Circumstances)vsThree-hour 'No Show' remedy

Code 110 is an open code for extraordinary circumstances (hurricanes, floods, ice, acts of God) requiring the excavator to wait until after the date and time the operator posted, while the three-hour No Show remedy applies to an operator that fails to respond where there are indications of an unmarked facility.

SC 811 Excavator Manual (2024), Page 23 (Positive Response Open Codes) and Page 57 (Section 58-36-60(E)(5))

Key Terms

Bridge (SCDOT Subsection 101.3.8) SCDOT Standard Specifications for Highway Construction, Subsection 101.3.8, Page 5
A structure, including supports, erected over a depression or obstruction such as water, highway, or railway, having a track or passageway for carrying traffic and a length measured along the center of roadway of more than 20 feet.
Bridge length with multiple pipes SCDOT Standard Specifications for Highway Construction, Subsection 101.3.8, Pages 5-6
Bridge length is measured between undercopings of abutments or spring lines of arches, or extreme ends of openings for multiple boxes, and may include multiple pipes only where the clear distance between openings is less than half of the smaller contiguous opening.
Bank plug Excavation and Grading Handbook, Appendix B — Glossary (Page 491)
A tapered 2x4 driven into the ground with about 24 inches remaining above ground, used to carry a string line, with nails set in it at a given distance above the road surface.
Choker Excavation and Grading Handbook, Appendix B — Glossary (Page 492)
A road shoulder left higher than the subgrade level that also contains base rock to limit waste.
Typical drawing Excavation and Grading Handbook, Appendix B — Glossary (Page 496)
A cross-section view of a street or highway, often showing only half of the road when both sides are the same, with station numbers indicating the length of road section shown.
Swedes Excavation and Grading Handbook, Appendix B — Glossary (Page 496)
A method of setting grade at a center point by sighting across the tops of three lath, two placed at a known correct elevation and the third adjusted until it is at the correct elevation.
Plastic limit Construction Planning, Equipment, and Methods (9th ed.), Chapter 4, Page 173
The water content at which a soil passes from the plastic to the semisolid state — the lowest water content at which the soil can be rolled into a 1/8 in. (3.2 mm) diameter thread without crumbling; the plasticity index is the liquid limit minus the plastic limit.
Crosshaul Construction Planning, Equipment, and Methods (9th ed.), Page 144
The difference between the total cut column and the sum of the positive algebraic-sum values — material used between the same two successive stations and therefore considered to move at right angles to the centerline; many contractors treat it as dozer work and it never appears in the mass ordinate.
Purchase expense Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Elements of Ownership Cost, Purchase Expense section (p. 72) and Cost for Bidding, Ownership Cost section (p. 88)
The total delivered (drive-away) cost including all options, shipping, and taxes, LESS the cost of the tires, used as the basis for the depreciation portion of ownership cost.
Major repairs and overhauls Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Major Repairs and Overhauls section (p. 80) and Cost for Bidding, Major Repairs and Overhauls (p. 93)
Repairs that extend a machine's service life, treated as an ownership cost and added to book value (adjusted basis) to be depreciated, prorating the expense across all jobs the machine works.
Monthly rental hours Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Rent and Lease Considerations, Rental section (p. 104)
Standard industry practice prices rentals daily at 8 hr, weekly at 40 hr, and monthly at 176 hr (8 hr/day × 22 working days per month).
Replacement analysis (cumulative hours basis) Construction Planning, Equipment, and Methods (9th ed.), Chapter 2 — Replacement Decisions section (pp. 101–102)
Replacement economics are based on cumulative hours, so keeping a machine past its optimum economic life applies the per-hour cost difference to every cumulative operating hour, not just the hours of the last year.
Rolling resistance Construction Planning, Equipment, and Methods (9th ed.), Chapter 6 — Total Resistance section (pp. 249–251)
Haul-road resistance expressed in lb per ton that increases about 30 lb/ton for each inch of tire penetration and converts to equivalent grade at 20 lb/ton per 1% of grade.
Coefficient of traction Construction Planning, Equipment, and Methods (9th ed.), Chapter 6 — Coefficient of Traction section (pp. 260–262)
The factor applied to the weight on the driving wheels to find the maximum force a machine can apply before the tires slip (0.30 in wet sand in the cited example); if that product is less than the engine-developed rimpull, slippage limits usable power.
Drawbar pull (published) Construction Planning, Equipment, and Methods (9th ed.), Chapter 6 — Drawbar Pull section (p. 259)
Crawler drawbar pull published from the Nebraska tests, which assume a haul-road rolling resistance of 110 lb/ton.
Positive Response Code 110 — Extraordinary Circumstances SC 811 Excavator Manual (2024), Page 23 (Positive Response Open Codes) and Page 57 (Section 58-36-60(E)(5))
An open code indicating circumstances such as hurricanes, floods, ice, or acts of God that make compliance impractical; per Section 58-36-60(E)(5) the excavator must not excavate or demolish until after the time and date the operator provided.
Functional vs. operational equipment classification Construction Planning, Equipment, and Methods (9th ed.), Chapter 1 — Planning Equipment Utilization (p. 53)
Equipment is identified either functionally or operationally — a bulldozer pushing a stockpile at an aggregate plant is operationally a plant support machine but functionally an excavator.

Formulas to Know

Bank cubic yards of excavation (trench on outside perimeter, or basement footprint)Trench: length = outside perimeter = 2 × (L + W); bcy = length × trench width × depth ÷ 27. Basement: footprint = (building L + 2 × working space) × (building W + 2 × working space); bcy = footprint × depth ÷ 27. (Example: 2 × (40 + 28) = 136 ft × 2.5 ft × 2 ft = 680 cf ÷ 27 = 25.19 bcy; (44+2×2) × (28+2×2) = 1,536 sf × 9 ft = 13,824 cf ÷ 27 = 512.00 bcy)
Loose yards hauled and number of truck loadsLoose cy = bank cy × (1 + swell %); loads = loose cy ÷ truck capacity, always rounded UP (never divide bank volume by truck size). (Examples: 25.19 × 1.30 = 32.74 lcy, 32.74 ÷ 12 = 2.73 → 3 loads; 512.00 × 1.20 = 614.40 lcy, 614.40 ÷ 10 = 61.44 → 62 loads)
Additional loose yards when swell increases by 10 percentage pointsExtra lcy = bank cy × 0.10 (Example: 25.19 × 0.10 = 2.52 cy; 512.00 × 0.10 = 51.20 cy)
Average lot elevation and fill required to a uniform finished gradeAverage elevation = sum of the four corner spot elevations ÷ 4; average fill depth = finished elevation − average existing elevation; volume (cy) = lot area × average fill depth ÷ 27. Maximum corner difference = highest corner − lowest corner. (Example: (4.00+3.00+2.00+3.00) ÷ 4 = +3.00'; 4.00 − 3.00 = 1.00'; 100' × 60' = 6,000 sf × 1.00' = 6,000 cf ÷ 27 = 222.2 cy; 4.00 − 2.00 = 2.00')
Water to be added per station of compacted liftVolume (one station) = 100 ft × width × compacted lift thickness in ft; dry weight = volume × specified dry unit weight; water (lb) = (optimum water content − borrow water content) × dry weight; gallons = water lb ÷ 8.33. (Example: 100 × 36 × 0.667 = 2,400 cf; 2,400 × 115 = 276,000 lb; (0.13 − 0.06) × 276,000 = 19,320 lb ÷ 8.33 = ≈2,319 gal — using the full 13% instead of the 7% difference is the error)
Effective grade for a haulEquivalent grade of rolling resistance = rolling resistance (lb/ton) ÷ 20 lb/ton per 1% grade; effective grade = grade resistance (%) + equivalent grade (%). (Example: 120 ÷ 20 = 6%; 4% + 6% = 10%)
Maximum rimpull of a pneumatic-tired tractorRimpull (lb) = (375 × hp × drive-train efficiency) ÷ speed (mph); use 0.85 efficiency when the manufacturer publishes none (SAE recommendation). (Example: (375 × 350 × 0.85) ÷ 5.0 = 22,313 lb)
Crawler drawbar pull corrected for job rolling resistanceAvailable pull = published drawbar pull − [tractor weight (tons) × (actual rolling resistance − 110 lb/ton)]. (Example: 20 × (150 − 110) = 800 lb; 18,000 − 800 = 17,200 lb)
Maximum usable tractive force before tire slipMax tractive force = coefficient of traction × weight on the driving wheels (not × rimpull); usable power is the lesser of this value and the engine-developed rimpull. (Example: 0.30 × 22,000 = 6,600 lb, which is less than the 12,000-lb rimpull)
Hourly engine fuel consumptionFuel (gal/hr) = flywheel hp × fuel rate (0.04 gal/fwhp-hr diesel; 0.06 gal/fwhp-hr gasoline) × time factor (working min ÷ 60) × throttle load factor. (Examples: 200 fwhp diesel, load factor 0.40(1.00)+0.60(0.50)=0.70, time 50/60=0.833 → 200 × 0.04 × 0.583 = 4.67 gal/hr; 75 fwhp gasoline, 60/60 = 1.00, 0.60 throttle → 75 × 0.06 × 1.00 × 0.60 = 2.70 gal/hr)