Tennessee BC Combined Residential/Commercial/Industrial Contractor
Tennessee
· Prov
Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
100
Passing score
73%
Exam time
300 min
Administered by
Prov
Format
Reference materials allowed
Tennessee State Portion
100 questions
Estimating, Plan Reading15 Q · 15%
Reading and interpreting civil drawings (site plans, plan and profile sheets, cross-sections)Contour lines, grading plans, and cut-and-fill mapsExcavation volume calculations (rectangular, triangular, trapezoidal, and cylindrical shapes)Unit conversions and material weight calculations for excavationConstruction specifications format (CSI MasterFormat Division 31 Earthwork)Slope and grade control using stakes, benchmarks, and layout methods
General Code12 Q · 12%
Occupancy classification and use group assignments (Groups A, B, E, F, H, I, M, R, S, U)Building height and area limitations by occupancy and type of constructionTypes of construction (Types I–V) and fire-resistance rating requirements for building elementsFire-resistance-rated assemblies: fire walls, fire barriers, fire partitions, smoke barriers, and smoke partitionsMeans of egress requirements: occupant load, exit capacity, number and separation of exits, egress illuminationAutomatic sprinkler system requirements by occupancy, building height, and fire areaAccessibility requirements: accessible routes, entrances, parking, and means of egressScope, administration, and authority of the building official; permits, inspections, and certificates
Sitework5 Q · 5%
Excavation safety requirements and competent person responsibilities (OSHA 1926 Subpart P)Trench protective systems: sloping, benching, shoring, and shieldingSoil classification for excavation (Type A, B, C, Stable Rock)Grading operations: cuts, fills, compaction, and slope requirements (IBC Appendix J)Earthmoving equipment selection and site excavation methodsDrainage and water control on construction sitesUnderground pipe installation: trench preparation, bedding, and thrust blocksPaving operations: concrete and hot-mix asphalt methods, equipment, and quality control
Footings and Foundations5 Q · 5%
Soil classification and presumptive load-bearing valuesFooting minimum dimensions, depth, and frost protectionConcrete and masonry foundation wall design and reinforcementFoundation dampproofing and waterproofingGeotechnical investigations and soil testing requirementsFootings and foundations on or adjacent to slopesDeep foundation elements and pile design requirements
Concrete and Concrete Reinforcement15 Q · 15%
ConcreteConcrete ReinforcementConcrete mix design and proportioningConcrete batching, mixing, and transportingConcrete placement, consolidation, and finishingCuring methods and requirementsConcrete durability and exposure categoriesFormwork design and removalReinforcing bar fabrication, sizes, grades, and ASTM standardsConcrete cover requirements and bar supports
Masonry10 Q · 10%
Masonry materials: clay brick types, grades, and manufacturing processesConcrete masonry unit (CMU) types, grades, and propertiesMortar types, proportions, and mixing requirementsMasonry wall systems: solid, cavity, composite, hollow, and veneer wallsLaying brick and block techniques: mortar placement, coursing, leads, and mason's lineMasonry reinforcement, anchors, ties, and joint reinforcementMasonry structural design: allowable stress, strength design, and empirical design methodsOSHA safety requirements and jobsite safety for masonry construction
Structural Steel10 Q · 10%
Pre-erection activities and site readiness verificationStructural steel erection sequence (columns, horizontal members, bracing and bridging)Column anchorage requirements and anchor bolt tolerancesBolted and welded field connections (framed-beam, seated-beam, end-plate, single-plate shear)Erection tolerances for columns and structural membersTemporary supports, bracing, and plumbing-up during erectionSteel erection safety requirements under OSHA Subpart R (fall protection, hoisting, open web steel joists, metal decking)Pre-engineered metal building erection and IBC Chapter 22 steel design standards
Carpentry6 Q · 6%
Wood wall framing components (studs, plates, headers, cripple studs, trimmer studs)Wall bracing methods and braced wall panel requirementsHeader sizing and span tables for wall openingsFastening schedules for wood wall and roof framing connectionsDrilling and notching limitations for studs and top platesCold-formed steel wall framing materials, member identification, and installationWood floor framing: joist spans, bridging, blocking, and cantileversWood roof framing: rafter spans, ridge boards, collar ties, and ceiling joists
Interior Finish1 Q · 1%
Gypsum board types and special-use panels (Type X, water-resistant, abuse-resistant, flexible, sheathing)Drywall fasteners: nails, screws (Types W, S, G), and adhesives — selection and spacing requirementsFire-rated wall and ceiling assemblies: single-ply vs. multi-ply construction and fire-stopping methodsInterior wall and ceiling finish flame spread and smoke-developed classifications (Class A, B, C) by occupancySound-isolation construction methods: STC ratings, separated partitions, resilient channels, and sound-isolating materialsDrywall installation procedures: cutting, fitting, fastener patterns, floating interior angle construction, and moisture-resistant applicationsDrywall accessories: corner beads, casings, control joints, and perimeter reliefInterior floor finish and decorative materials requirements under IBC Chapter 8
Roofing, Siding, and Insulation6 Q · 6%
Roof covering types and minimum slope requirements (asphalt shingles, clay/concrete tile, metal panels, wood shingles/shakes, built-up, modified bitumen, single-ply)Underlayment selection, application, and attachment requirements by roof covering type and wind speedRoof flashing requirements (valleys, drip edges, base/cap flashing, crickets and saddles, parapet walls)Fire classification of roof assemblies (Class A, B, C ratings and applicable construction types)Insulation types, R-values, and installation methods (flexible, loose-fill, rigid/semirigid, reflective, spray foam)Vapor retarders and moisture control (perm ratings, vapor barrier classes, placement relative to building thermal envelope by climate zone)Exterior wall weather protection and water-resistive barriers (building wrap/house wrap installation, flashing at openings, drainage requirements)Reroofing requirements (roof recover vs. roof replacement, conditions prohibiting recover, reinstallation of materials)
Plumbing Concepts3 Q · 3%
Minimum plumbing fixture counts by occupancy type (IBC Table 2902.1)Sanitary drainage system design: pipe sizing, slope, and fixture unit valuesBackflow prevention devices and cross-connection controlVenting methods and vent pipe sizing requirementsWater supply system design: pressure, flow rates, and pipe sizingFixture trap requirements: seal depth, size, and prohibited trap typesWater heater installation: relief valves, pan requirements, and prohibited locationsStorm drainage and subsoil drain systems
HVAC Concepts3 Q · 3%
Combustion air requirements and sizing methods for fuel-gas appliancesFuel gas piping materials, sizing, and installationVenting systems and chimney types for gas appliances (Type B, BW, L, single-wall, factory-built)Duct system construction, materials, insulation, and sealingHeating and cooling equipment installation, sizing, and clearances to combustiblesCondensate disposal and auxiliary drain pan requirementsBoiler and water heater installation, safety controls, and pressure reliefExhaust systems for dryers, cooking equipment, and mechanical ventilation
Electrical Concepts3 Q · 3%
GFCI and AFCI protection requirements by locationService entrance sizing, conductors, and disconnecting meansGrounding and bonding systems (electrodes, conductors, jumpers)Branch circuit ratings, loading, and overcurrent protectionReceptacle outlet placement and spacing requirementsWiring methods, raceways, and conduit fillPanelboard installation, ratings, and working space clearancesEmergency and standby power systems (IBC requirements)
OSHA Safety6 Q · 6%
Fall protection requirements and systems (guardrail, safety net, personal fall arrest)Scaffold safety requirements and load capacityExcavation and trenching safety (cave-in protection, sloping, shoring)Personal protective equipment (PPE) selection and employer responsibilitiesElectrical safety in construction (grounding, GFCI, lockout/tagout, working clearances)Hazardous and toxic substances (asbestos, silica, permissible exposure limits)Fire protection and prevention on construction sitesStairway and ladder safety requirements
Key Distinctions
Contact lap splicevsSpaced-lap splice
A contact splice places the bars in actual contact and is preferred because it provides more strength, while a spaced-lap splice sets the bars apart without contact at a center-to-center spacing that must not exceed 6 inches.
Study Guide for Commercial Building Contractor, Module 27304 Reinforcing Concrete, Section 4.1.2
Registered design professional (IBC 2207.2)vsOpen-web steel joist manufacturer (IBC 2207.3)
The registered design professional indicates on the construction documents the joist/joist girder designations, design requirements, layout, end supports, anchorage, bridging design differing from SJI specifications, bridging termination connections, and bearing connection design for uplift and lateral loads, while the manufacturer designs the joists themselves to support those stated loads and submits sealed calculations plus connection design for connections differing from SJI specifications, field splices, and joist headers.
IBC 2021 Section 2207.2
"K" series open web steel joist attachmentvs"LH"/"DLH" series joists and joist girders
Per 29 CFR 1926.757(b)(1), each end of a "K" series joist requires a minimum of two 1/8-inch fillet welds 1 inch long (or two 1/2-inch bolts or the equivalent), whereas the larger 1/4-inch by 2-inch welds apply to "LH" and "DLH" series joists and joist girders.
29 CFR 1926, Subpart R, §1926.757(b)(1)
Field-cured test cylindersvsLaboratory-cured test cylinders
Field-cured specimens stay on site under the same conditions as the placement and may be used to determine when it is safe to remove forms, while acceptance strength is determined from laboratory-cured cylinders tested under ASTM C39.
Study Guide for Commercial Building Contractor, Module 23212 Properties of Concrete, Section 3.4.0
Direct construction costsvsDirect (job) overhead costs
Direct construction costs are the labor, material, and equipment tied to a specific trade or phase (pipe materials, backhoe rental, pipe bedding aggregate), while direct (job) overhead covers administrative costs resulting from taking a particular job but not tied to a trade or phase, such as traffic control (barricades, flaggers, lane delineators) and pipe or soil density testing.
B-B Plyform®, sanded on both sides and mill oiled rather than overlaid, gives 5 to 10 reuses, while an HDO-overlaid surface normally produces 20 to 50 reuses or more with reasonable care.
Study Guide for Commercial Building Contractor, Module 27309 Horizontal Formwork, Section 4.1.0
Beam sides built of lumbervsBeam sides built of plywood
In site-built beam and slab forms, lumber sides require 2x4 vertical cleats at 2' to 2'-6" on center, while plywood sides eliminate the cleats and use 2x4 vertical stiffeners.
Study Guide for Commercial Building Contractor, Module 27309 Horizontal Formwork, Section 3.3.1
Active lateral soil pressurevsAt-rest lateral soil pressure
Per the IBC 1610.1 exception, foundation walls extending not more than 8 feet below grade and laterally supported at the top by flexible diaphragms are permitted to be designed for active pressure, whereas at-rest pressure is required where horizontal movement is restricted at the top.
IBC 2021 Section 1610.1
3/8" gypsum panelsvs1/2" and 5/8" gypsum panels
Under Gypsum Panel Limitations, 3/8" panels are designed for framing centers up to 16", while 1/2" and 5/8" panels are designed for framing centers up to 24".
Fiberglass shingles use a fiberglass base mat saturated and covered with flexible asphalt and surfaced with mineral granules, while organic shingles use a cellulose-fiber base mat.
NRCA Roofing Manual: Architectural Metal Flashing Condensation and Air Leakage Control, and Reroofing, Appendix 6—Climatic Design Information (glossary, "asphalt shingle")
Egress window on an upper floorvsEgress window on the grade floor
An upper-floor egress window must have an unblocked open area of not less than 5.7 sq. ft., while grade-floor windows require not less than 5.0 sq. ft.
Carpentry and Building Construction, Windows & Skylights chapter, Design Requirements section
Window area for ventilation (4%)vsWindow glass area for natural light (8%)
Openable window area for ventilation must be not less than 4 percent of floor area unless mechanical air conditioning and ventilation are provided, while the 8 percent figure is the total window glass area required for natural light.
Carpentry and Building Construction, Windows & Skylights chapter, Design Requirements section
Thickened slab under an interior bearing wallvsStandard footing
The thickened slab area acts like a footing but is formed by a trench dug into the subgrade rather than by formwork, and should be strengthened with rebar.
Carpentry and Building Construction, Section 11.1, Page 295
Directional drillingvsDirectional boring with a pneumatic mole
Directional drilling is practical for tunneling up to 2,200 feet for pipe 16 to 36 inches in diameter, while directional boring with a pneumatic mole typically accommodates pipe up to only 6 inches in diameter over 50 to 150 feet.
Pipe and Excavation Contracting, Pages 176-177
Punchouts/holes in the web of steel framingvsHoles in the flange of a stud, joist, or track
Holes in the web are permitted for utility routing, but a hole must never be punched in the flange because it reduces the structural strength of the member.
Carpentry and Building Construction, Section 29.3, Builder's Tip - Punchouts
Key Terms
Fire wall (IBC 202) IBC 2021 Section 202 (Definitions - Fire Wall)
A fire-resistance-rated wall having protected openings that restricts the spread of fire and extends continuously from the foundation to or through the roof, with sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall.
Building area (IBC 202) IBC 2021 Section 202 (Definitions - Area, Building)
The area within surrounding exterior walls, or exterior walls and fire walls, exclusive of vent shafts and courts, with unwalled areas included if they fall within the horizontal projection of the roof or floor above.
Occupant load (IBC 202) IBC 2021 202
The number of persons for which the means of egress of a building or portion thereof is designed, a design value rather than the actual number of people present.
Story above grade plane (IBC 202) IBC 2021 Section 202 (Definitions - Story Above Grade Plane)
Any story with its finished floor surface entirely above grade plane, or in which the finished surface of the floor next above is more than 6 feet above grade plane or more than 12 feet above the finished ground level at any point.
A masonry wall of two or more wythes, at least two of which are separated by a continuous air space, with the separated wythes connected by wall ties.
Seating-loss (PTI Field Procedures Manual, Ch. 1) PTI Field Procedures Manual, Chapter 1 Definitions - Seating-Loss
The relative movement of the wedges into the anchor cavity during transfer of the prestressing force to the anchorage, resulting in some loss of prestressing force.
Keyway Carpentry and Building Construction, Section 10.1, Page 258
A groove formed in the top of a footing—usually 3½" wide and 1½" deep because a 2×4 forms it—that locks the foundation wall to the footing and prevents moisture seeping between wall and footing.
Cold joint Carpentry and Building Construction, Section 10.2, Page 266
The joint formed where fresh concrete is poured on top of or next to concrete that has already begun to cure; it is weaker and more likely to leak, so concrete should be poured continuously.
Consolidation Carpentry and Building Construction, Section 8.2, Page 227
The process that removes air pockets and forces concrete into all parts of the forms, done with a concrete vibrator, tamping, spearing with a spade, or tapping forms with a hammer.
Porosity Carpentry and Building Construction, Chapter 9 — The Excavation
The measurement of the ability of water to flow through soil; poor drainage may require excavating and replacing material with better soil.
Differential leveling Carpentry and Building Construction, Chapter 9 — Measuring a Difference in Elevation
Determining differences in elevation between points remote from each other, requiring one or more additional intermediate instrument setups.
Theodolite Carpentry and Building Construction, Chapter 9 — Types of Instruments
A transit that reads horizontal and vertical angles electronically, needs no vernier scale, and displays measurements on an LCD screen; used where extremely accurate measurements are required.
Reference line Carpentry and Building Construction, Chapter 9 — Basic Techniques / Measuring From a Reference Line
An existing line such as a street or marked property line that a building is planned parallel to, allowing the site to be staked out by measuring from it without a surveying instrument.
Shear wall Carpentry and Building Construction, Page 378
A wall designed to resist lateral (sideways) forces, often created by a specific sheathing nail spacing, and fastened to the framing above and to the sill plate and foundation below.
Escalation allowance Pipe and Excavation Contracting, Page 27
An allowance for the increase in costs of labor, materials, and equipment between the time the bid is submitted and the time the work is done and paid for; especially important during high inflation.
Plyform® Modern Masonry (9th ed.), Chapter 19, Page 402
An exterior-type plywood specially manufactured for concrete forming from special wood species and veneer grades, available in Class I and Class II grades.
Gain (hinge mortise) Residential Doors chapter, Hinges section
A mortise/notch cut with a depth equal to the thickness of a single hinge leaf, one in the door edge and one in the jamb, so the leaves meet and the door sits flush when closed.
Racking Carpentry and Building Construction, Section 29.3, Page 852
A structural problem in which a wall shifts and studs are forced out of plumb; properly installed full-height, tightly fastened sheathing braces the wall against racking and twisting.
Formulas to Know
Cubic feet to cubic yards (excavation and concrete quantities)cubic yards = total cubic feet ÷ 27 (27 cubic feet = 1 cubic yard)
Excavation volume with working clearance (worked example)Excavation dims = (building length + clearance each side) × (building width + clearance each side) × depth ÷ 27. Example: 40' × 26' house with 2' clearance each side, 7' deep → 44 × 30 × 7 = 9,240 cf ÷ 27 ≈ 342 cy
Crawl-space ventilation net areaMinimum net vent area = 1 sq ft per 150 sq ft of crawl-space area. Example: 1,200 ÷ 150 = 8 sq ft
Metal gutter slope / total dropSlope at least 1 inch per 16 feet toward the downspout (1/16 in. per ft); total drop = run (ft) × 1/16 in. Example: 32 ft × 1/16 = 2 in.
Masonry allowable stress design lap splice length (IBC 2107.2.1)ld = 0.002 db × fs, but not less than 12 inches (305 mm); lapped splice also not less than 40 bar diameters
Roof area from footprint using slope factor and squaresslope factor = √(12² + rise²) ÷ 12 (6:12 = 1.118); roof area = plan footprint × slope factor; squares = roof area ÷ 100. Examples: 2,160 sf × 1.118 = 2,415 sf = 24.2 squares; 2,000 sf × 1.118 = 2,236 sf
Slab/footing concrete volume (order in whole cubic yards, round up)volume (cf) = area (sf) × thickness in inches ÷ 12; cy = cf ÷ 27, rounded up to order. Examples: 200' × 2' × 1' = 400 cf ÷ 27 = 14.8 → order 15 cy; driveway 540 sf × 5/12 = 225 cf = 8.33 cy; sidewalk 120 sf × 4/12 = 40 cf = 1.48 cy; both together 265 cf = 9.81 → order 10 cy
Formwork contact area and marked-up labor pricecontact area = length × form height × number of faces; base labor = area × unit rate; add 25% burden (×1.25); then add 15% O&P (×1.15). Example: 200' × 1.0' × 2 = 400 sf; 400 × $1.25 = $500 → $625 → $718.75