Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
55
Passing score
71%
Exam time
120 min
Administered by
PSI Services Contractor
Format
Reference materials allowed
Virginia State Portion
55 questions
Standards of Practice3 Q · 5%
Prohibited acts and grounds for disciplinary actionLicense transfer prohibitionAdding or deleting trade designationsChange of address reporting requirementsConsequences of practicing with an expired licenseReinstatement status and continuous disciplinary authorityMonetary penalties and failure to pay assessed fees
Standards of Conduct2 Q · 4%
Prohibited acts and grounds for disciplinary actionDisciplinary penalties (remedial education, monetary fines, suspension, revocation, refusal to renew)Mandatory reporting of convictions and out-of-state disciplinary actions within 30 daysMisrepresentation and false statements to the boardAiding or abetting unlicensed contractors / allowing license use by unlicensed individualsNon-transferability of license or certificationPracticing outside licensed classification or specialtyBoard authority over reinstated regulants during lapsed license period
Renewal and Reinstatement1 Q · 2%
License expiration periods for HVAC tradesmenContinuing education requirements for HVAC license renewalRenewal fees for tradesman licensesRenewal notice procedures and regulant obligationsReinstatement fees and timelinesMaximum reinstatement period and new application requirementsGrounds for denial of renewal
Definitions1 Q · 2%
Air types: exhaust, makeup, outdoor, transfer, recirculated, supply, return, and ventilation airHVAC system component definitions: ducts, plenums, air-handling units, condensers, evaporators, compressors, and condensing unitsRefrigerant classifications: flammability classes, toxicity classes, and safety group designationsCombustion-related terms: combustion air, combustion products, excess air, theoretical air, draft types, and venting system componentsVirginia-specific license and trade definitions: HVAC tradesman, residential HVAC tradesman, master, journeyman, and HVAC work scopeBuilding and space definitions: conditioned space, dwelling, dwelling unit, occupiable space, living space, and breathing zoneHeat transfer and refrigeration cycle terms: heat pump, heat exchanger, absorption system, direct vs. indirect refrigeration systems, and evaporative coolingApproved, listed, and labeled equipment definitions and code applicability rulesChapter 2 Definitions
Qualification for Licensure1 Q · 2%
Education and experience requirements for residential HVAC tradesman licensureEducation and experience requirements for journeyman HVAC tradesman licensureExperience requirements for master HVAC tradesman licensureApplication procedures and completion requirementsGeneral eligibility requirements (age, address of record, identification)Criminal conviction and prior disciplinary action disclosure requirementsExemptions from examination (apprenticeship completion, prior certifications)Out-of-jurisdiction license reciprocity and substantial equivalencyARTICLE 1: Regulation of Contractors
Warm Air Heating8 Q · 15%
Gas furnace sequence of operation and component functionsGas furnace efficiency ratings and categories (AFUE, mid-efficiency, high-efficiency/condensing)Gas furnace ignition systems (standing pilot, intermittent pilot, DSI, HSI)Gas furnace safety and limit controls (high-limit switch, rollout switch, pressure switch)Oil furnace components and sequence of operationElectric heating systems and elements (furnaces, duct heaters, baseboard units, radiant heat)Heating and cooling load calculations (Manual J, U-values, R-values, design temperatures)Air distribution duct systems, sizing, and components (registers, dampers, duct types)Gas-Fired Heating Systems
Ventilation Systems4 Q · 7%
Mechanical ventilation minimum outdoor airflow rates and calculation methodsNatural ventilation requirements and openable area calculationsHeat recovery ventilators (HRV) and energy recovery ventilators (ERV)Exhaust systems for kitchens, bathrooms, and clothes dryersDuct system construction, materials, sealing, and insulationAir changes per hour calculation and blower door testingIndoor air quality pollutants, filtration, and MERV ratingsVentilation load calculations for heating and cooling equipment sizingChapter 5 Exhaust Systems
Air Conditioning Systems6 Q · 11%
Vapor-compression refrigeration cycle fundamentals (high side vs. low side, compressor, condenser, metering device, evaporator)Types of residential split systems (central ducted, mini-split, multi-split, VRF/ductless)Self-contained and packaged AC systems (room air conditioners, PTACs, portable units, packaged rooftop units)Compressor types and protection devices (reciprocating, rotary, scroll, thermal overloads, pressure switches)Metering devices (capillary tube, fixed orifice, TXV, EEV) and their applicationsAir-source heat pump operation and components (reversing valve, accumulator, biflow metering devices, heating/cooling modes)Thermostat and comfort cooling controls (low-voltage thermostats, programmable/wireless thermostats, zoned systems, safety controls)Heating and cooling load calculations (Manual J, heat gain/loss, U-values, R-values, design temperatures)Residential Split Air-Conditioning Systems
Duct Systems4 Q · 7%
Duct system types and configurations (radial, extended plenum, reducing trunk, perimeter loop)Duct materials and construction (sheet metal, fiberglass ductboard, flexible ducts)Duct sizing using ACCA Manual D (friction rate, total effective length, available static pressure)Registers, diffusers, grilles, and dampers (types, installation, and adjustment)Fire and smoke dampers (ratings, locations, actuation requirements per IMC)Duct sealing, insulation, and leakage testing (mastic, metal tape, duct blaster testing)Duct load calculations (conduction losses, leakage effects, insulation R-values per Manual J)Duct system balancing, airflow measurement, and maintenance (flow hoods, balancing procedures, duct cleaning)Air Distribution
Chimneys, Flues, and Vents4 Q · 7%
Chimney and vent types (masonry, factory-built, Type L, pellet vent)Vent application and appliance compatibility requirementsConnector sizing, construction materials, and installation requirementsVent termination heights and clearance requirementsDirect-vent, integral-vent, and mechanical draft systemsGas furnace venting categories (Category I through IV) and vent pipe materialsOil furnace venting, draft testing, and draft regulator operationChimney connector pass-through systems and clearances to combustiblesGas-Fired Heating Systems
Hot Water Heaters3 Q · 5%
Water heater listing, labeling, and standards compliance (UL 174, UL 1453, UL 732, UL 2523)Combination potable water heating and space heating systems, including sizing and temperature limitation (ASSE 1017, 140°F maximum)Safety and pressure relief valve installation and discharge requirementsExpansion tank types, sizing, and installation requirements for hot water systemsBoiler and water heater clearances, mounting, and access requirementsHydronic piping materials, fittings, and joint methods for hot water systemsShutoff valve placement requirements in hydronic piping systemsHydrostatic testing of hydronic piping systems
Hot Water Piping4 Q · 7%
Hydronic pipe material standards and approved piping types (copper, PEX, CPVC, steel, etc.)Joint types and connection methods by pipe material (brazing, soldering, solvent cement, heat fusion, mechanical)Pipe insulation requirements for hydronic systemsShutoff valve placement requirements in hydronic piping systemsHydrostatic testing requirements for hydronic piping systemsHot water piping heat loss calculation (pipe loss factors, temperature difference, pipe length, location)Embedded piping requirements for radiant panel systemsPiping installation requirements (pipe penetrations, clearance to combustibles, expansion/contraction, pipe support, water hammer)Hydronic Heating Fundamentals
Combustion Air2 Q · 4%
Primary air, secondary air, and excess air requirements for complete combustionCombustion air supply methods: ambient air vs. outdoor direct-venting systemsMakeup air units and prevention of negative pressure in structuresDampered combustion air openings and interlock requirementsCombustion air requirements by appliance type: gas-fired, oil-fired, and solid-fuel appliancesFlammability limits and fuel-air mixture ratios for natural gas and LP gasEffects of inadequate combustion air on flame characteristics and carbon monoxide productionGas-Fired Heating Systems
Controls/Low Voltage3 Q · 5%
Thermostat types, sensing elements, and switching devicesLow-voltage control circuits and 24V systemsRelays: current, potential, solid-state, and PTC typesPressure motor controls: high-pressure, low-pressure, and safety controlsMotor protection devices: fuses, circuit breakers, and bimetal overloadsDirect digital control (DDC) systems: sensors, controllers, and actuatorsControl system fundamentals: range and differential adjustmentZoned system controls and damper operationElectrical Control Systems
Fuel Oil Piping and Storage1 Q · 2%
Fuel oil grades and characteristics (heating value, viscosity, flash point, pour point, ash content)Fuel oil storage tank installation requirements (aboveground, underground, and indoor tanks)Piping materials, fittings, and joint types for fuel oil systemsFill piping, vent piping, and oil gauging requirementsFuel oil supply and return line sizing, configuration, and shutoff valve placementOne-pipe vs. two-pipe fuel delivery systems and oil deaeratorsCombustion efficiency testing (CO2 test, stack temperature test, draft test, smoke test)Oil furnace service, maintenance, and troubleshooting (nozzle replacement, bleeding fuel lines, flame failure causes)Oil-Fired Heating Systems
Insulation2 Q · 4%
Thermal resistance (R-value) and its relationship to insulation effectivenessThermal transmittance (U-value) calculation for composite building assembliesInsulation types and installed R-values for walls, ceilings, and floorsR-value compression adjustment for batt and blanket insulationDuct insulation requirements including surface temperature limits and vapor retardersFlame spread and smoke-developed index requirements for duct coverings and liningsR-value identification and labeling requirements for external duct insulationWhole-panel U-value calculation methods for framed, masonry, and slab assembliesHeating and Cooling Loads
Refrigerants2 Q · 4%
Refrigerant classification by chemical type (CFC, HCFC, HFC, HFO, HC)Environmental regulations and refrigerant phaseout (Montreal Protocol, Kigali Amendment, AIM Act, Clean Air Act Section 608)Refrigerant safety classifications (ASHRAE Standard 34 toxicity and flammability ratings)Refrigerant identification by numbering system and cylinder color codingAzeotropic and zeotropic refrigerant blends (fractionation, temperature glide, bubble/dew point)Refrigerant properties and pressure-temperature relationships (P/T charts, pressure-enthalpy diagrams, subcooling, superheat)Refrigeration lubricant types and compatibility with refrigerants (MO, POE, AB, PAG)IMC refrigerant quantity limits, occupancy classifications, and machinery room requirementsEquipment and Instruments for Refrigerant Handling and Service
Refrigerant Piping2 Q · 4%
Refrigerant piping materials and standards (copper ACR tubing types, steel pipe, aluminum tubing)Tubing cutting, bending, and preparation techniquesBrazed and flared joint connections for refrigerant linesRefrigerant line installation requirements (supports, slope, insulation, penetrations, clearances)Leak detection methods (bubble solution, electronic detector, fluorescent dye, ultrasonic)Pressure testing refrigerant piping with inert gas (nitrogen)Refrigerant piping code requirements per IMC Chapter 11 (prohibited locations, height requirements, access port protection)Filter-driers, sight glasses, and vibration absorbers in refrigerant line installationResidential Split Air-Conditioning Systems
Chilled and Condenser Water Piping1 Q · 2%
Chilled water system piping materials and applicable standardsCondenser water piping materials and applicable standardsPiping joint types and connection methods for hydronic systemsShutoff valve placement requirements in chilled and condenser water systemsPipe insulation requirements for chilled water pipingHydrostatic pressure testing of hydronic piping systemsWater-cooled condenser types and condenser water circuit designCooling tower water circuit configurations and operational considerationsHydronic Heating Fundamentals
Firestopping/Penetration Inspection1 Q · 2%
Fire and smoke damper installation requirements at duct penetrations of fire-resistance-rated assembliesFire damper and smoke damper ratings (UL 555, UL 555S) and actuation temperaturesDamper access, inspection clearances, and identification labeling requirementsProtection of duct penetrations through fire walls, fire barriers, fire partitions, and smoke barriersCeiling radiation damper requirements at floor/ceiling and roof/ceiling assembly penetrationsFireblocking requirements for stud cavity and joist space plenumsDuct covering prohibition from penetrating fire-resistance-rated or fireblocked assemblies (IMC 604.6)Penetration protection requirements for non-fire-resistance-rated floor assembliesChapter 6 Duct Systems
K-value is the heat passing through one square foot of material ONE INCH thick in one hour per 1°F temperature difference (Btu·in/hr·ft²·°F), while C-value is based on the material's actual measured thickness rather than a standardized 1-inch thickness.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 32 - Heating and Cooling Loads, Page 717 (20th ed.: Page 986)
The subcooling method is generally used to check charge on systems with thermostatic expansion valves (TXVs), while the superheat method is used on systems with fixed orifice metering devices such as capillary tubes.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 12 - Working with Refrigerants, Page 221 (20th ed.: Page 236)
Indoor reset controlvsOutdoor reset control
An indoor reset control matches boiler water temperature to the load by monitoring cycle time (raising temperature on long cycles, lowering it on short cycling), while an outdoor reset control responds to the difference between indoor and outdoor temperatures.
Modern Refrigeration and Air Conditioning (22nd ed.), Page 913
Wet-base boilervsDry-base boiler
In a wet-base boiler the water surrounds the combustion area for maximum heat transfer surface, while in a dry-base boiler the water is contained above the burner and the area under the combustion chamber is dry.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 38 - Hydronic Heating Fundamentals, Page 892 (20th ed.: Page 1037–1038)
A shell-and-coil condenser's coiled water tubing cannot be accessed for mechanical cleaning and must be cleaned with chemicals, while a shell-and-tube condenser has removable end caps allowing mechanical cleaning of the straight water tubes.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 44 - Commercial Evaporators, Condensers, and Other Heat Exchangers, Page 1069 (Section 44.2.2) (20th ed.: Page 537)
Cast-iron boilervsLow-mass copper-tube boiler
Cast-iron boilers used in residential and light-commercial work usually hold 15–30 gallons of water and take longer to heat but maintain heat for extended periods, while low-mass copper-tube boilers hold only a few gallons.
Modern Refrigeration and Air Conditioning (22nd ed.), Page 892
Duct leakage tested before the air handler is installedvsDuct leakage tested with the air handler installed
Per the IECC, maximum duct leakage is 3 cfm per 100 ft² of conditioned space when tested before the air handler is installed, versus a maximum of 4 cfm per 100 ft² when tested with the air handler installed.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 31 - Ventilation System Service, Page 703 (Section 31.1.5) (20th ed.: Page 793)
Duct air velocities above 700 fpm can cause excessive noise in the ductwork, while air velocities greater than 500 fpm at a supply register may produce drafts — two separate concerns.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 30 - Air Distribution, Page 688 (20th ed.: Page 773)
Double-pole thermostat (240 V baseboard)vsSingle-pole thermostat (240 V baseboard)
A double-pole thermostat opens both legs of the 240 V circuit and is considered safest, while a single-pole thermostat opens only one leg, is generally less safe, and is used less frequently for baseboard heating.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 35 - Electric Heating Systems, Page 846 (20th ed.: Page 1210)
Radial duct systemvsPerimeter loop duct system
A radial system runs individual branch ducts directly from the central plenum to each supply outlet with no trunk line, while a perimeter loop system is used with downflow furnaces in homes without basements, with ductwork laid in the concrete slab and branch ducts feeding a perimeter duct.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 30 - Air Distribution, Page 672 (20th ed.: Page 755)
99% outdoor design temperature (heating)vs97.5% outdoor design temperature (heating)
Using the 97.5% value instead of the 99% value results in an 11% decrease in recommended system size, appropriate only for buildings with large thermal capacity and small total window area; when in doubt choose the outdoor design temperature on the low side.
Modern Refrigeration and Air Conditioning (22nd ed.), Page 722
Yellow-tipped gas burner flamevsOrange outer-edge flame / too much primary air
Yellow tips indicate insufficient primary air and incomplete combustion (unburned carbon particles), whereas orange outer edges are caused by dust particles and are not a sign of lack of primary air, and too much primary air causes a noisy flame that lifts above the burner.
Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 33 - Gas-Fired Heating Systems, Page 758 (Section 33.2.2) (20th ed.: Page 1118)
Per IMC 2021 definitions, any appliance in which the products of combustion at the point of entrance to the flue under normal operating conditions have a temperature of 1,000°F (538°C) or less.
Per IMC 2021 Section 604.3 Exception, spray polyurethane foam applied to the exterior of ducts in attics and crawl spaces shall have a flame spread index not greater than 25 and a smoke-developed index not greater than 450 when tested to ASTM E84 or UL 723 (relaxed from the standard 50 for other coverings and linings).
License non-transferability (18 VAC 50-30-170) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 25
No license or certification issued by the Virginia Board for Contractors may be assigned or otherwise transferred; each individual must qualify for and obtain his own license.
Aiding or abetting an unlicensed contractor (18 VAC 50-30-190(8)) Virginia Board for Contractors Regulations (18 VAC 50-30), Pages 26 to 27
A prohibited act consisting of aiding or abetting an unlicensed contractor, acting as agent/partner/associate for an unlicensed contractor, or allowing one's license or certification to be used by an unlicensed or uncertified individual.
Practicing outside the licensed designation (18 VAC 50-30-190(14)) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 27
A prohibited act of practicing in a classification or specialty service for which the regulant is not licensed or certified; trade designations must first be added to the license under 18 VAC 50-30-150.
Furnishing inaccurate information (18 VAC 50-30-190(2)) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 26
A prohibited act of furnishing substantially inaccurate or incomplete information to the board in obtaining, renewing, reinstating, or maintaining a license or certification.
Misrepresentation or false promise (18 VAC 50-30-190(7)) Virginia Board for Contractors Regulations (18 VAC 50-30), Pages 26 to 27
A prohibited act consisting of any misrepresentation or false promise of a character likely to influence, persuade, or induce — the violation turns on the character of the statement, not on proof of monetary loss or a filed complaint.
Prior local discipline (18 VAC 50-30-190(12)) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 27
Having been disciplined by any county, city, town, or state or federal governing body for actions relating to the practice of a trade is a prohibited act, and that action shall be reviewed by the board before the board takes any disciplinary action of its own.
Board sanctions (18 VAC 50-30-185) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 26
When a regulant has violated or cooperated in violating Chapter 1 or Chapter 11 of Title 54.1 or the board's regulations, the board may impose remedial education, a monetary penalty in accordance with § 54.1-202 A of the Code of Virginia, or revoke, suspend, or refuse to renew a license.
Tradesman license reinstatement fee (18 VAC 50-30-130(A),(B)) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 23
If all renewal requirements are not completed within 30 days of the license expiration date, a $210.00 reinstatement fee (which includes the renewal fee) is required; all fees are non-refundable and are not prorated.
Tradesman continuing education (18 VAC 50-30-120(C)) Virginia Board for Contractors Regulations (18 VAC 50-30), Page 21
Individuals holding tradesman licenses with the plumbing, electrical, and heating ventilation and cooling designations must satisfactorily complete three hours of continuing education for each designation, relating to applicable building code changes, from a board-approved provider, as a condition of renewal or reinstatement.
Velocity pressure Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 28 - Air Movement and Measurement, Page 630 (20th ed.: Page 710)
The difference between total air pressure and static air pressure, as measured by a pitot tube (total pressure = static pressure + velocity pressure).
cfm50 Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 31 - Ventilation System Service, Page 702 (20th ed.: Page 791)
The measured airflow through a blower door fan when indoor pressure is held at −50 Pa with respect to outdoors, used to calculate ACH50.
cfm25 (duct leakage test) Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 31 - Ventilation System Service, Page 703 (20th ed.: Page 792)
The airflow needed to maintain ductwork at +25 Pa with respect to the conditioned space after all registers and grilles have been sealed.
Category IV furnace Modern Refrigeration and Air Conditioning (22nd ed.), Chapter 33 - Gas-Fired Heating Systems, Page 776 (20th ed.: Page 1134)
A positive-pressure venting, condensing gas furnace whose flue gas temperature is less than 140°F (60°C) — below its dew point — so some flue gas condenses; these high-efficiency units use secondary heat exchangers and PVC vent piping.
Air break (draft diverter) Modern Refrigeration and Air Conditioning (22nd ed.), Page 749
An inverted opening in the flue of a gas-fired appliance that keeps a constant pressure in the combustion chamber and prevents backpressure from ambient air from reaching the furnace flame; in gas-fired boilers an air break or draft diverter is installed in the stack for the same purpose.
Formulas to Know
Air velocity from pitot tube velocity pressureV = 4005 × √Pv (Pv in inches of water). Example: Pv = 0.25 → V = 4005 × 0.5 = 2002.5 ≈ 2003 ft/min.
Swinging-vane anemometer temperature correction (instrument calibrated at 68°F)Airflow velocity = instrument reading × √((460 + T) / (460 + 68°F)), where T is the actual duct temperature.
Btu/hr converted to kilowatts for sizing electric heatkW = Btu/hr ÷ 3,413. Example: 50,000 ÷ 3,413 = 14.65 kW minimum capacity.
Manual J heating load of a component (HTM method)HTM = U × HTD; Load = area × HTM. Examples: wall U 0.07 × HTD 50 = 3.50 Btuh/sq ft; 60 sq ft glass × (0.30 × 50 = 15.00) = 900 Btuh; 140 sq ft ceiling × (0.03 × 50 = 1.50) = 210 Btuh; 60 sq ft glass × (0.35 × 75 = 26.25) = 1,575 Btuh; 256 sq ft ceiling × (0.05 × 75 = 3.75) = 960 Btuh; 240 sq ft net wall × HTM 6.00 = 1,440 Btuh.
Net exposed wall area and room total heating loadNet wall = (wall length × height) − openings; example 30 ft × 9 ft = 270 sq ft − 40 sq ft glass = 230 sq ft. Room total = wall + glass + ceiling + infiltration; examples 1,008 + 504 + 432 + 1,014 = 2,958 Btuh, and 828 + 720 + 360 + 792 = 2,700 Btuh.
Scaling total heating load for a colder outdoor design temperatureEvery component is proportional to HTD, so total scales by (new HTD ÷ old HTD). Examples: 4,820 × (80 ÷ 70 = 1.1429) = 5,509 Btuh; 2,700 × (70 ÷ 60 = 1.1667) = 3,150 Btuh.