Verificado, no estimado. Cada cifra a continuación proviene de la estructura oficial del examen que mantenemos: número de preguntas, puntaje de aprobación y ponderación de temas. Las preguntas de práctica están fundamentadas en la ley fuente con citas de estatutos. Omitimos cualquier cifra que no podamos verificar en lugar de adivinarla.
Total de preguntas
110
Puntaje de aprobación
75%
Tiempo del examen
300 min
Administrado por
Prov
Formato
Se permiten materiales de referencia
Porción Estatal de Alabama
110 preguntas
Organización Empresarial1 Q · 1%
Business legal structures (sole proprietorship, partnership, corporation, LLC) — characteristics, advantages, and disadvantagesLiability exposure by business structure typeTaxation differences among business entity typesFormation documents required for each business structure (DBA filing, partnership agreement, articles of incorporation, operating agreement)Joint ventures — formation, management, and licensing considerationsBusiness naming, fictitious names/DBA registration, and trademark basicsBusiness plan elements and purpose (planning, loan/investor, benchmarking tool)New business startup checklist — organizational steps and professional advisors
Gestión de Riesgos2 Q · 2%
Risk assessment fundamentals and probability of lossTypes of property insurance for contractors (builder's risk, inland marine, equipment floater)Commercial general liability (CGL) insurance coverage and exclusionsSurety bonds: types, qualifying requirements, and bond languageEmployment-related insurance (workers' compensation, unemployment, Social Security)Insurance coverage requirements for subcontractorsMiller Act and Little Miller Acts bonding requirements for federal projectsCoverage gaps, overlaps, and business owner's policies (BOPs)
Gestión de Proyectos2 Q · 2%
Scheduling methods: calendar, bar chart, and critical path method (CPM)Scheduling process elements: sequence of tasks, activity duration, contingency time, and float timeScheduling and cash flow managementProject manager and supervisory team roles (superintendent, foreman, materials expediter)Budget tracking and cost overrun controlsMaterials management: just-in-time delivery, purchase orders, and receivingCustomer communication, change order handling, and negotiation basicsSubcontractor selection, site rules, and employee vs. independent contractor classification
Estimación de Costos4 Q · 4%
Bid documents and bid package componentsEthics in bidding (bid shopping, bid peddling, bid rigging)Estimate planning and site visit considerationsEstimating framework and quantity take-off methodDetermining direct costs (labor, materials, equipment)Labor burden and overhead calculationsMarkup, profit margin, and cost-based pricingJob cost recording system and estimating technology tools
Seguridad y Medio Ambiente2 Q · 2%
OSHA standards and recordkeeping requirements (Forms 300, 300A, 301)OSHA penalty types and violation classificationsEmergency action plan requirementsSafety Data Sheets (SDS) and Hazard Communication StandardUnderground utility and overhead power line safetyEnvironmental laws and EPA regulatory frameworkAsbestos and lead-based paint regulations and renovation requirementsHazardous and non-hazardous solid waste identification and disposal
Leyes Laborales3 Q · 3%
Alabama Workers' Compensation coverage requirements and employer exemptionsSecuring workers' compensation payment: insurance vs. self-insurance optionsEmployer reporting obligations for injuries and compensation settlementsDrug-free workplace program requirements and workers' compensation premium discountsFair Labor Standards Act: minimum wage, overtime, and recordkeeping requirementsHiring minors: working hour restrictions and prohibited hazardous tasks in constructionEmployment eligibility verification: Form I-9 requirements and documentationAnti-discrimination laws: ADA, Title VII, ADEA, and Equal Pay Act applicability
Nómina e Impuestos de Empleo4 Q · 4%
Federal Employer Identification Number (EIN) requirements and applicationSocial Security and Medicare taxes (FICA) — calculation and employer/employee withholdingFederal income tax withholding — W-4 and W-2 formsFederal Unemployment Tax (FUTA) — rates, thresholds, deposit schedules, and Form 940Alabama Unemployment Compensation (UC) employer liability and registration — Form SR-2Alabama UC taxable wage base, contribution rates, and experience ratingAlabama quarterly contribution and wage report filing — Form UC-CR4, deadlines, penalties, and interestAlabama new-hire reporting requirements and procedures
Gestión Financiera4 Q · 4%
Bookkeeping practices and the accounting cycleFinancial statements (balance sheet, income statement, statement of cash flows)Financial ratio analysis (liquidity, quick, activity, debt, profitability, return on assets)Cash and accrual methods of accountingContract accounting methods (completed contract, percentage of completion, cost comparison)Cash flow management, accounts receivable collection, and progress paymentsEquipment depreciation methods (straight-line and accelerated/MACRS)Payroll accounting (gross pay, deductions, net pay, payroll journal)
Contratos3 Q · 3%
Required elements of a binding contract (offer, acceptance, consideration, competent parties, legal purpose)Types of construction contracts (lump-sum, unit-price, cost-plus, turnkey, fast-track)Contracting methods (single prime, multiple prime, design/build, construction management, partnering)Contract provisions (payment terms, progress payments, retainage, final payment, obligations of parties)Breach of contract (material vs. immaterial breach, liquidated damages, statute of limitations)Change orders and contract modificationsAlternative dispute resolution (negotiation, mediation, collaborative law, arbitration)Subcontractor agreements and employee vs. independent contractor classification
Leyes de Gravámenes1 Q · 1%
Who qualifies for a mechanic's or materialman's lien (eligible claimants and covered work)Filing requirements for verified lien statement (contents, form, and probate court recordation)Deadlines for filing lien statements by claimant type (original contractor, day laborer, other persons)Priority of mechanic and materialman liens relative to prior mortgages and subsequent encumbrancesNotice requirements for subcontractors and materialmen before filing a lien statementTime limitations for enforcement actions and consequences of failure to actTransfer of lien from real property to alternate security (bond or money deposit)Lien satisfaction, acknowledgment of release, and penalties for failure to release
Leyes de Licencias4 Q · 4%
Alabama Board of Electrical Contractors composition, appointment, and termsQualifications and experience requirements for electrical contractor licensureQualifications and experience requirements for journeyman electrician licensureLicense application, examination administration, and passing standardsLicense fees, renewal, late renewal, and reinstatement proceduresInactive status certification requirements and reinstatement to active licenseLicense exemptions from state electrical licensing requirementsContinuing education requirements, approved providers, and contact hour computation
Conocimientos Generales de Electricidad10 Q · 9%
Ohm's Law and basic DC circuit calculations (voltage, current, resistance, power)Series, parallel, and combination circuit types and current/voltage distributionAC fundamentals: sine waves, frequency, electrical degrees, and phase relationshipsElectrical units and definitions (ampere, volt, ohm, watt, impedance, capacitance, inductance)NEC definitions and terminology for wiring systems (branch circuit, feeder, service, bonding, grounding)General installation requirements of NEC Article 110 (approval, listing, examination, terminations, deteriorating agents)Voltage drop and single-phase / three-phase power calculations
Puesta a Tierra y Unión9 Q · 8%
Grounding electrode system types and selection (NEC 250.52)Grounding electrode conductor sizing using Table 250.66Equipment grounding conductor types, sizing, and identification (NEC 250.118–250.122)Main bonding jumper and system bonding jumper requirementsBonding of services, piping systems, and structural metal (NEC 250.92–250.104)Grounding of separately derived systems and generatorsEffective ground-fault current path requirements for grounded and ungrounded systemsGrounding electrode installation methods and connection requirements (NEC 250.53–250.70)
Conductores y Cables10 Q · 9%
Conductor insulation types, temperature ratings, and type designations (e.g., THHN, XHHW, RHW, TW)Ampacity tables and correction/adjustment factors for conductors rated 0–2000 voltsConductor material, size, and stranding requirements (copper, aluminum, copper-clad aluminum; AWG and kcmil)Grounded conductor identification methods and color codingUses permitted and uses not permitted for specific cable types (NM, NMC, MC, AC, MI, SE, USE, UF, TC, ITC, FC, FCC, IGS, Type P)Securing, supporting, and bending radius requirements for cable assembliesFlexible cords and fixture wires — types, ampacities, permitted uses, and marking requirementsConductor marking requirements and conductor properties (Chapter 9 Table 8)
Canalizaciones y Cajas8 Q · 7%
Conduit fill calculations and conductor count limits (NEC Chapter 9 Tables)Raceway and conduit selection by wiring method type (RMC, IMC, EMT, FMC, LFMC, PVC, ENT, RTRC, LFNC)Securing and supporting requirements for conduits, tubing, and racewaysBox fill calculations and volume allowances (Article 314)Pull box and junction box sizing for conductors 4 AWG and largerUnderground installation requirements and minimum cover depths for racewaysWireway and auxiliary gutter conductor fill, splices, and ampacity rulesCable tray installation, fill requirements, and permitted wiring methods
Ocupaciones Especiales y Equipos4 Q · 4%
Hazardous location classification (Classes I, II, and III; Divisions 1 and 2)Wiring methods and sealing requirements for hazardous locationsHealth care facility essential electrical systems (Type 1 and Type 2 EES)Patient care space grounding, bonding, and receptacle requirementsSwimming pools, spas, and fountains — GFCI protection, bonding, and underwater luminairesSolar PV systems — circuit sizing, overcurrent protection, rapid shutdown, and arc-fault protectionElectric vehicle power transfer system (EVSE) installation and overcurrent protectionFire pump power sources, disconnecting means, and continuity of power requirements
Potencia Eléctrica3 Q · 3%
Transformer installation requirements and NEC Article 450 complianceTransformer overcurrent protection (primary and secondary, 1000 V and below)Transformer types, cooling methods, and insulation classesEmergency system power sources and automatic transfer equipment (NEC Article 700)Generator installation, marking, overcurrent protection, and disconnecting means (NEC Article 445)Legally required standby systems and critical operations power systems (NEC Articles 701 and 708)Energy storage systems and stationary standby batteries (NEC Articles 706 and 480)Interconnected electric power production sources and parallel operation requirements (NEC Article 705)
Motores6 Q · 5%
Motor branch-circuit conductor sizing and ampacity requirementsMotor overload protection selection and settingsBranch-circuit short-circuit and ground-fault protective device ratingsMotor controller types, ratings, and enclosure classificationsDisconnecting means requirements for motors and controllersAC motor types and operating characteristics (squirrel-cage, wound-rotor, synchronous)DC motor types, speed control methods, and starting requirementsHermetic refrigerant motor-compressor circuit requirements
Baja Tensión2 Q · 2%
Class 1, Class 2, and Class 3 circuit classifications and power source limitationsSeparation requirements between low-voltage and power/light circuitsCable types and substitution hierarchy for power-limited circuits (CL2, CL3, CMP, CMR, PLTC, etc.)Installation of communications cables by building location (plenum, riser, general-purpose, dwelling)Grounding and bonding of communications systems, cable shields, and primary protectorsAntenna system installation, clearances, and grounding requirementsNetwork-powered and premises-powered broadband communications systems (Articles 830 and 840)Class 4 fault-managed power systems and energy management system controls
Iluminación3 Q · 3%
Luminaire installation requirements by location (wet, damp, corrosive, closets, bathtub/shower zones)Luminaire support methods and outlet box requirementsLuminaire grounding and wiring requirementsRecessed luminaire requirements (thermal protection, clearances, insulation contact, IC vs non-IC)Lighting track installation and restrictionsBallasts and auxiliary equipment for fluorescent and HID luminaires (thermal protection, disconnecting means)Low-voltage lighting systems (voltage limitations, secondary circuit isolation, branch circuit requirements)Lamp and light source types (incandescent, fluorescent, HID, LED) and their operating characteristics
Letreros Iluminados2 Q · 2%
Branch circuit requirements for signs (rating, dedicated circuit, and wiring methods)Disconnecting means location and lockout requirementsGrounding and bonding of sign equipment and metal partsListing, labeling, and marking requirements for signs and retrofit kitsTransformers and electronic power supplies (ratings, secondary voltage, ground-fault protection)Neon secondary-circuit wiring (≤1000V and >1000V methods, conductor types, spacing)Location restrictions (height above vehicles, combustible materials, wet location drain requirements)Portable and mobile sign requirements (cord types, GFCI, support)
Sistemas de Detección de Incendios y Alarmas2 Q · 2%
Power-limited fire alarm (PLFA) circuit wiring methods and cable types (FPL, FPLR, FPLP)Non-power-limited fire alarm (NPLFA) circuit power source and overcurrent protection requirementsBranch circuit requirements and disconnecting means identification for fire alarm systemsSeparation of PLFA conductors from power, Class 1, and NPLFA circuit conductorsFire alarm cable applications in plenums, risers, and general building locationsCircuit integrity (CI) cable and fire-resistive cable system installation requirementsAbandoned fire alarm cable removal and circuit identification requirementsNPLFA and PLFA conductor materials, sizes, and insulation requirements
Información de Seguridad5 Q · 5%
Electrical Safety Program (ESP) components and requirementsLockout/tagout (LOTO) procedures and electrically safe work conditions (ESWC)Arc flash risk assessment and PPE selection methodsShock risk assessment and approach boundaries (limited and restricted)Personal protective equipment (PPE) selection, use, and inspectionQualified vs. unqualified person requirements and safety trainingArc flash hazard warning labels and equipment markings (NEC 110.16)Working space and guarding requirements for electrical equipment (NEC 110.26, 110.27)
Protección contra Sobrecorriente6 Q · 5%
Types and classifications of fuses (plug, cartridge, Class H/J/K/L/R/T)Circuit breaker types and operating principles (thermal, magnetic, thermal-magnetic, electronic)Standard ampere ratings for fuses and circuit breakers (NEC Table 240.6(A))Overcurrent device location requirements and tap conductor rules (NEC 240.21)Ground-fault protection of equipment (GFPE) for services and feeders (230.95, 240.13)Arc energy reduction (NEC 240.87) and current-limiting overcurrent devicesInterrupting ratings and short-circuit current calculationsOvercurrent device installation requirements (accessibility, enclosures, prohibited locations)
Servicio, Alimentadores y Circuitos Ramales10 Q · 9%
Branch-circuit ratings, conductor sizing, and overcurrent protection requirementsGFCI and AFCI protection requirements by location and occupancy typeDwelling unit receptacle outlet placement and required branch circuitsService entrance conductor sizing, wiring methods, and clearancesService disconnecting means requirements, ratings, and locationFeeder conductor sizing, overcurrent protection, and identificationPanelboard, switchboard, and switchgear installation and overcurrent protectionSurge-protective device (SPD) types, installation, and connection requirements
Distinciones Clave
AnexosvsModificaciones
Las adendas son cambios introducidos en el contrato antes de su adjudicación, mientras que las modificaciones son cambios introducidos después de la firma y la entrada en vigor del contrato.
En el arbitraje, un árbitro independiente actúa como juez y dicta un laudo arbitral que es jurídicamente vinculante para todas las partes, mientras que en la mediación el mediador neutral se limita a facilitar el diálogo y son las propias partes las que establecen los términos de cualquier acuerdo.
El derecho colaborativo recurre a los propios representantes de las partes (normalmente abogados) para negociar un resultado beneficioso para ambas sin que intervenga ningún mediador ni árbitro neutral.
Seguro a todo riesgo para obrasvsSeguro de riesgos de constructores contra riesgos específicos
La cobertura «a todo riesgo» cubre las pérdidas directas derivadas de cualquier riesgo que no esté específicamente excluido de la póliza (prácticamente todos los riesgos), mientras que la cobertura por «riesgos específicos» tiene un alcance más limitado y enumera los riesgos cubiertos, como el incendio y los rayos.
Gastos generales del proyectovsGastos generales de la empresa
Los gastos generales del proyecto incluyen partidas específicas de la obra, como fianzas, almacenamiento temporal, oficinas provisionales, personal de seguridad, servicios públicos, contenedores de escombros y aseos portátiles, mientras que los gastos generales de la empresa incluyen el alquiler de las oficinas, los honorarios de contabilidad y los honorarios de los servicios jurídicos.
Método de cálculo del precio unitariovsMétodo de cálculo de cantidades
El método del precio unitario agrupa la mano de obra, los materiales, el equipo y los subcontratistas en un único precio para toda una tarea, mientras que el método de cálculo de cantidades estima cada componente por separado.
NASCLA Contractors Guide, Bidding and Estimating chapter — Other Methods of Estimating section
Manipulación de licitacionesvsComparación de ofertas / venta ambulante de ofertas
La manipulación de licitaciones es una colusión en la que los contratistas coordinan sus ofertas para predeterminar el resultado de la adjudicación; la búsqueda de ofertas más baratas consiste en solicitar ofertas más bajas a los subcontratistas una vez presentadas las ofertas originales, y la negociación de precios es cuando un subcontratista se pone en contacto con el contratista principal tras la adjudicación para rebajar el precio.
El arrendamiento financiero no requiere pago inicial, permite distribuir los pagos en cuotas más bajas a lo largo de un periodo más prolongado, permite deducir los pagos como gastos de explotación y devuelve el equipo obsoleto al propietario, mientras que la compra suele resultar más económica a largo plazo y ofrece la titularidad y el valor residual (por lo general, los contratos de arrendamiento no se pueden rescindir).
Valores nominales estándar en amperios solo para fusiblesvsValores nominales estándar tanto para fusibles como para interruptores automáticos de tiempo inverso
Las intensidades nominales de 1, 3, 6 y 601 amperios son valores nominales estándar adicionales exclusivos de los fusibles, mientras que los valores que figuran en la tabla 240.6(A), desde 15 hasta 6000 amperios (por ejemplo, 110 A) se aplican tanto a los fusibles como a los interruptores automáticos de tiempo inverso.
NEC 2023 Sección 240.6(A) y Tabla 240.6(A)
Norma NFPA 70E sobre el etiquetado de equiposvsNorma de la OSHA sobre el etiquetado de equipos de trabajo (29 CFR 1910.147)
La norma NFPA 70E prohíbe el etiquetado sin candado, salvo que el dispositivo de aislamiento no permita su colocación, mientras que la OSHA permite el etiquetado cuando la empresa demuestre un nivel equivalente de seguridad.
American Electricians' Handbook, 17th ed., Division 13 (Electrical Safety), Sec. 49 — Application of Lockout or Tagout
Unidades de sobrecarga para motores monofásicos en circuitos de dos hilos sin toma de tierravsUnidades de sobrecarga para motores trifásicos
Un motor monofásico de corriente alterna o continua conectado a una red de alimentación de dos hilos sin toma de tierra solo necesita una unidad de sobrecarga de funcionamiento en cualquiera de los conductores, mientras que un motor trifásico requiere tres unidades de sobrecarga, una en cada fase.
NEC 2023 Tabla 430.37
Relleno de los conductos de la caja de ascensor (620.33)vsRelleno de los conductos de cables de ascensor (620.32)
En los conductos, la suma de las secciones transversales de los conductores individuales no deberá superar el 40 % de la sección transversal interior del conducto, salvo en los casos permitidos en el apartado 620.32 para los canaletines, en los que el límite es del 50 %.
NEC 2023 Sección 620.33
Términos Clave
Norma de dimensionamiento de alimentadores de carga continua (215.2(A)(1)) NEC 2023 Sección 215.2(A)(1)
Cuando una línea de alimentación suministre cargas continuas o una combinación de cargas continuas y no continuas, la capacidad de corriente mínima del conductor deberá ser igual a la carga no continua más el 125 por ciento de la carga continua.
Capacidad de corriente mínima del conductor de entrada de servicio (230.42(A)(1)) NEC Sección 230.42(A)(1)
Los conductores de la entrada de servicio que alimentan cargas continuas deben tener una capacidad de corriente no inferior a la suma de las cargas no continuas y el 125 % de las cargas continuas.
Potencia nominal de desconexión del servicio eléctrico en viviendas unifamiliares (230.79(C)) NEC Sección 230.79(C)
El dispositivo de desconexión de la red eléctrica de una vivienda unifamiliar debe tener una capacidad nominal de al menos 100 amperios, de 3 hilos.
Cálculo opcional de la vivienda (220.82(A)) NEC 2023 Sección 220.82(A)
El cálculo de carga opcional se aplica a una vivienda cuya carga total conectada esté alimentada por un único conjunto de conductores de servicio o de distribución de tres hilos de 120/240 voltios o 208Y/120 voltios, con una ampacidad igual o superior a 100.
Longitud libre del conductor (300.14) NEC 2023 Sección 300.14
En cada toma de corriente, punto de empalme e interruptor debe dejarse un mínimo de 150 mm (6 pulgadas) de conductor libre, medido desde el punto en que sale del canaleta o de la funda del cable, para realizar empalmes o conectar luminarias u otros dispositivos.
Espacio libre de los orificios perforados en elementos de madera (300.4(A)(1)) NEC 2023 Sección 300.4(A)(1)
Los agujeros deben perforarse de manera que el borde del agujero quede a una distancia mínima de 32 mm (1 1/4 pulgadas) del borde del elemento de madera; cuando no sea posible mantener dicha distancia, deberá colocarse una placa de acero para proteger el cable o la canalización de los clavos o tornillos.
Placa protectora de acero para muescas (300.4(A)(2)) NEC 2023 Sección 300.4(A)(2)
Los cables o canaletas tendidos en muescas en elementos de madera deben protegerse contra la penetración de clavos o tornillos mediante una placa de acero de al menos 1.6 mm (1/16 pulg.) de espesor, con la longitud y anchura adecuadas, que cubra la zona del cableado.
Longitud de la caja de tracción recta (314.28(A)(1)) NEC 2023 Sección 314.28(A)(1)
En el caso de conductores de 4 AWG o de mayor sección en tramos rectos, la longitud de la caja o del cuerpo del conducto debe ser, como mínimo, ocho veces el tamaño comercial del conducto de mayor sección.
Distancia entre los tiradores angulares o en U (314.28(A)(2)) NEC 2023 Sección 314.28(A)(2)
En los puntos en los que se realicen empalmes, desvíos en ángulo o desvíos en U, la distancia desde cada entrada de la canalización hasta la pared opuesta debe ser, como mínimo, seis veces el tamaño comercial de la canalización más grande de la fila.
Margen de llenado de la caja del dispositivo (yugo) (314.16(B)(4)) NEC 2023 Sección 314.16(B)(4)
Cada yugo o brida que contenga uno o más dispositivos o equipos requiere una holgura de doble volumen, según la Tabla 314.16(B)(1), en función del conductor de mayor sección conectado a dicho yugo o brida.
Identificación de los tornillos de los puentes de conexión principal/del sistema (250.28(B)) NEC Sección 250.28(B)
Cuando el puente de conexión principal o del sistema sea únicamente un tornillo, este deberá estar identificado con un acabado verde que sea visible una vez instalado el tornillo.
Distancia entre los electrodos de puesta a tierra complementarios (250.53(A)(3)) NEC 2023 Sección 250.53(A)(3)
Cuando se instalen varios electrodos de varilla, tubo o placa para cumplir el requisito de electrodos suplementarios, la distancia entre ellos no deberá ser inferior a 1.8 m (6 pies).
Derivación (circuito de derivación) American Electricians' Handbook, 17th ed., Division 3, Sec. 16 (A tap or tap circuit)
Conjunto de conductores que alimentan a un único dispositivo consumidor de energía, conectado directamente a un circuito derivado sin la interposición de un dispositivo de desconexión o de protección contra sobrecorriente.
Lista de generadores fijos (445.6) NEC 2023 Sección 445.6
Los generadores fijos deben figurar en una lista, salvo los generadores únicos o fabricados a medida, que pueden llevar una etiqueta colocada in situ.
Carga de la iluminación en riel (220.46(B)) NEC 2023 Sección 220.46(B)
En los casos distintos a las viviendas o a las habitaciones y suites de hoteles y moteles, se deben incluir 150 voltamperios adicionales por cada 600 mm (2 pies) de riel de iluminación o fracción del mismo, con la excepción de que se permite realizar el cálculo basándose en la potencia nominal de un dispositivo limitador de corriente.
Certificación de la condición de inactivo (Norma 303-X-2-.04 del Consejo) Alabama Supplement to the Contractors Guide (2014), Board Administrative Code 303-X-2-.04, Inactive Status Certification
El titular de una licencia podrá optar por pasar a la situación de inactivo mediante notificación por escrito o a través del formulario en línea de la Junta, que deberá recibirse al menos 30 días antes de que caduque la licencia; solo podrán acogerse a esta opción las licencias activas (que no hayan caducado).
Prioridad del derecho de retención del constructor frente a una hipoteca anterior (Código de Alabama, art. 35-11-211) Alabama Supplement to the Contractors Guide (2014), Excerpts from Alabama Lien Law — § 35-11-211 (Priority of lien)
Un derecho de retención de mecánico perfeccionado tiene preferencia sobre los derechos de retención e hipotecas constituidos después del inicio de las obras; sin embargo, frente a una hipoteca inscrita con anterioridad, solo tiene preferencia en lo que respecta a un edificio o una mejora que sea separable y desmontable sin menoscabar el valor o la garantía de la hipoteca anterior, y debe ejecutarse antes de que se proceda a la ejecución hipotecaria de dicha hipoteca.
Letras de aislamiento THHN Conductor insulation type letters (THHN)
En THHN, T = aislamiento termoplástico, HH = alta resistencia al calor (90 °C en seco) y N = una cubierta exterior de nailon que aporta resistencia a la abrasión y a la gasolina y el aceite.
Fórmulas que Debes Saber
Capacidad de corriente mínima del conductor / valor nominal del dispositivo de protección contra sobrecorriente (OCPD) para cargas continuas (ramal, ramal de distribución, servicio)Capacidad de corriente mínima = carga no continua + (1.25 × carga continua); p. ej., 80 A + (1.25 × 60 A) = 155 A, y 40 A + (1.25 × 60 A) = 115 A. Para un dispositivo de protección contra sobrecorriente (OCPD) de derivación con solo carga continua: 1.25 × 16 A = 20 A (el dispositivo y el conjunto no están homologados para una potencia nominal del 100 %).
Resistencia en serie y en paralelo y corriente total (ley de Ohm)Ramas paralelas iguales: R = R_rama ÷ n; dos ramas desiguales: R = (R1 × R2) / (R1 + R2); suma de resistencias en serie: R_total = R_serie + R_paralelo; entonces I = E ÷ R_total (p. ej., 24 V ÷ 8 Ω = 3 A; 24 V ÷ 4 Ω = 6 A; 44 V ÷ 22 Ω = 2 A; 28 V ÷ 14 Ω = 2 A). Corriente de rama = tensión de rama ÷ resistencia de rama.
Caída de tensión trifásica (método circular-mil)VD = (1,732 × K × I × L) ÷ CM; p. ej., (1,732 × 12.9 × 24 A × 90 pies) ÷ 10 380 cmil = 4.65 V. En el caso de la corriente monofásica, se utiliza el factor 2 en lugar de 1,732.
Impedancia efectiva con un factor de potencia distinto al indicado en la tabla (capítulo 9, tabla 9, nota 2)Efectivo Z = R cos(θ) + X sin(θ); para el factor de potencia de otro circuito, Ze = R × PF + XL sin[arccos(PF)].
Intensidad máxima admisible del conductor de alimentación del motor (430.24)El 125 % del FLC del motor más grande más la suma de los FLC de los demás motores; por ejemplo, (1.25 × 15.2 A) + 15.2 A + 15.2 A = 49.4 A.
Intensidad máxima nominal del dispositivo de protección contra sobrecorriente del alimentador del motor (430.62 (A))Max = el valor nominal más alto de los dispositivos de protección contra cortocircuitos y fallos a tierra de los circuitos derivados + la suma de los FLC de los demás motores; por ejemplo, 90 A + 14 A + 10 A = 114 A; dado que se trata de un máximo «no superior a» y 114 A no es un tamaño estándar, utilícese el siguiente tamaño estándar INFERIOR, es decir, 110 A.
Dispositivo de protección contra cortocircuitos y fallos a tierra en el circuito derivado de un compresor hermético de aire acondicionado (440.22(A), excepción n.º 2)Normalmente, el 175 % de la corriente de carga nominal; cuando sea insuficiente para el arranque, se podrá aumentar, sin superar el 225 % de la corriente de carga nominal o de la corriente de selección del circuito derivado, la que sea mayor; p. ej., 28 A × 2.25 = 63 A, por lo que se seleccionará el siguiente tamaño estándar INFERIOR, 60 A (no se permite redondear al alza).
Capacidad de carga de los conductores del generador (445.13)Capacidad de carga del conductor ≥ 115 % de la corriente nominal indicada en la placa de características del generador; por ejemplo, 80 A × 1.15 = 92 A.
Conductores entre el controlador y el motor en conexión en estrella-en triángulo (430.22(C))Capacidad de corriente ≥ 72 % de la corriente a plena carga del motor (calculada a partir de 58 % × 1.25 = 72 %).
Carga general residencial antes de aplicar los factores de demanda (artículo 220)Iluminación general = superficie (pies cuadrados) × 3 VA/pie cuadrado; añadir 1.500 VA por cada circuito de pequeños electrodomésticos y 1.500 VA por cada circuito de lavandería; multiplique el total por unidad por el número de unidades (por ejemplo, 1 200 pies cuadrados × 3 + 2 × 1 500 + 1 500 = 8 100 VA por unidad; × 4 unidades = 32 400 VA). Las ocupaciones comerciales usan en su lugar la carga unitaria de la Table 220.42(A) (venta al por menor 1.9 VA/pie cuadrado).