Hoja de Referencia del Examen · Referencia Rápida

Oklahoma Refrigeration Journeyman

Oklahoma  ·  PSI Services Contractor

Verificado, no estimado. Cada cifra a continuación proviene de la estructura oficial del examen que mantenemos: número de preguntas, puntaje de aprobación y ponderación de temas. Las preguntas de práctica están fundamentadas en la ley fuente con citas de estatutos. Omitimos cualquier cifra que no podamos verificar en lugar de adivinarla.
Total de preguntas
60
Puntaje de aprobación
70%
Tiempo del examen
150 min
Administrado por
PSI Services Contractor
Formato
Se permiten materiales de referencia

Porción Estatal de Oklahoma 60 preguntas

Conocimientos Eléctricos y Controles 15 Q · 25%
Circuit diagrams: pictorial and ladder diagramsOhm's law, Watt's law, and power factor calculationsSingle-phase and three-phase AC motor types and starting methodsMotor starting relays: current, potential, solid-state, and PTC typesTemperature and pressure motor controls: cut-in, cut-out, range, and differential adjustmentsMotor protection devices: fuses, circuit breakers, and bimetal/thermistor overload protectionElectrical test instruments: voltmeters, ammeters, ohmmeters, multimeters, and megohmmetersTroubleshooting hermetic compressor motors and control componentsControl transformers and 24-volt control circuits
Refrigerantes 17 Q · 28%
Refrigerant classification and numbering systems (CFC, HCFC, HFC, HFO, HC, inorganic series)Environmental impact of refrigerants (ODP, GWP, Montreal Protocol, Clean Air Act Section 608)Refrigerant cylinder types, color codes, and DOT regulationsPressure-temperature relationships and P/T chart interpretationRefrigerant recovery, recycling, and reclaiming procedures and equipmentEPA technician certification requirements and categories (Type I, II, III, IV)Refrigerant leak detection methods and leak repair requirementsRefrigeration lubricant types and compatibility with refrigerants
Tuberías 3 Q · 5%
ACR copper tubing types, sizes, and specificationsTubing cutting, reaming, and bending techniquesFlared connections: single and double flare proceduresSoldering and brazing procedures, filler metals, and fluxSwaged connections and specialized tube couplingsRefrigerant piping materials standards and approved materials (IMC 1107)Refrigerant piping installation requirements: location, identification, and protection (IMC 1109)Refrigerant piping system pressure testing and leak testing (IMC 1110)
Equipos y Componentes de Refrigeración 15 Q · 25%
Compressor types and drive configurations (reciprocating, rotary, scroll, screw, centrifugal; open-drive vs. hermetic)Metering device types and operation (capillary tube, metering orifice, TXV, AXV, EEV, float valves)Evaporator and condenser types and construction (fin-and-tube, plate, microchannel, shell-and-tube, evaporative)Refrigerant flow control components (solenoid valves, check valves, service valves, hot-gas defrost and bypass valves)Pressure-regulating valves (CPR, EPR, relief valves, head pressure control valves)Refrigerant storage and filtration components (liquid receivers, filter-driers, sight glasses, moisture indicators)Compressor safety and protection devices (thermal overloads, discharge pressure switches, accumulators, oil separators)Evaporator defrost methods and controls (hot-gas, electric heat, off-cycle, pump-down, defrost timers)
Operación de Sistemas de Refrigeración 5 Q · 8%
Compression refrigeration cycle components and their functionsHigh-side and low-side pressure relationshipsHeat transfer principles in refrigeration (conduction, convection, radiation)Sensible heat, latent heat, superheat, and subcoolingGas laws and their application to refrigeration (Boyle's, Charles', Gay-Lussac's, combined)Pressure-temperature relationships and saturated vapor conditionsCommercial system configurations (multiple-evaporator, compound, cascade, secondary loop)Heat load calculation components (heat leakage, service load, miscellaneous loads)
Seguridad 5 Q · 8%
Personal protective equipment (PPE) selection and useLockout/tagout (LOTO) procedures for electrical safetyFire protection, fire extinguisher types, and the PASS methodHazard communication and Safety Data Sheets (SDS)Refrigerant, chemical, and breathing hazardsCompressed gas cylinder handling and storage for welding and cuttingConfined space entry requirements and proceduresFirst aid, medical services, and emergency action plans

Distinciones Clave

ACR Tubing SizingvsCopper Water Tubing Sizing

ACR tubing is sized by its actual outside diameter, while copper water tubing nominal size equals the OD minus 1/8 inch.

Modern Refrigeration And Air Conditioning, Chapter 8, Section 8.1.1
Galvanized PipevsBlack Pipe

Galvanized pipe is zinc-coated and used primarily in water systems to prevent rust, while black pipe is less expensive and used for gas lines and non-water applications.

Modern Refrigeration And Air Conditioning, Chapter 8, Section 8.2.3
Hot-Gas Defrost ValvevsHot-Gas Bypass Valve

The defrost valve delivers large quantities of hot gas to rapidly melt evaporator frost, while the bypass valve meters only small amounts of hot gas to protect the compressor under low-load conditions.

Modern Refrigeration and Air Conditioning, Chapter 22, Sections 22.3.6 and 22.3.7 — Hot-Gas Defrost vs. Hot-Gas Bypass Valves, Pro Tip
Current Relay (coil wiring)vsPotential Relay (coil wiring)

A current relay coil is wired in series with the run winding and responds to high inrush current at start-up, while a potential relay coil is wired in parallel with the start winding and responds to counter EMF as the motor accelerates.

Modern Refrigeration and Air Conditioning, Section 16.3.5 (Motor Starting Relays — Current Relays)
Single Screw CompressorvsTwin Screw Compressor

A single screw compressor uses one main rotor meshing with two star-shaped rotors, while a twin screw compressor uses two intermeshing helical rotors.

Modern Refrigeration and Air Conditioning, Chapter 18, Section 18.2.4 — Single Screw Compressor
Stationary-Blade Rotary CompressorvsStandard Rotary Compressor

In a stationary-blade (divider-block) rotary compressor the blade is mounted in the housing and spring-loaded against the rotor, rather than being mounted on the rotating shaft.

Modern Refrigeration and Air Conditioning, Chapter 18, Section 18.2.2 — Stationary-Blade (Divider-Block) Rotary Compressors
PSC MotorvsCSCR Motor

A PSC motor uses only a single run capacitor for the entire operation with no switching relay, while a CSCR motor uses both a start capacitor (switched out at 60–75% speed) and a run capacitor that stays in the circuit permanently.

Modern Refrigeration and Air Conditioning, Section 15.2.1 (Permanent Split Capacitor Motors)
CSIR Motor (centrifugal switch stuck open)vsCSIR Motor (centrifugal switch stuck closed)

A stuck-open centrifugal switch prevents the start winding from energizing so the motor cannot start, while a stuck-closed switch leaves the start capacitor in the circuit continuously, risking overheating.

Modern Refrigeration and Air Conditioning, Section 15.2.1 (Capacitor-Start, Induction-Run Motors)
Halide Torch / Electronic Leak DetectorvsBubble Solution

Halide torches and electronic detectors give false positives near urethane foam insulation because the foam contains refrigerant-based expanders, while a bubble solution relies on visible bubble formation and is reliable in that environment.

Modern Refrigeration and Air Conditioning, Pages 221–223 (Sections 10.5.1, 10.5.3 Pro Tip, 10.5.4 Pro Tip)
Three-Phase PowervsSingle-Phase Power

Three-phase power provides constant power because the three voltage signals peak at different times and never all reach zero simultaneously, resulting in less power loss at the transformer compared to single-phase power.

Modern Refrigeration and Air Conditioning, Section 13.2.1 (Single-Phase and Three-Phase Power)
Range AdjustmentvsDifferential Adjustment

A range adjustment shifts both cut-in and cut-out values equally in the same direction (keeping differential unchanged), while a differential adjustment changes cut-in and cut-out by equal amounts in opposite directions (keeping average temperature unchanged but altering cycle length).

Modern Refrigeration and Air Conditioning, Section 16.2.1 (Range Adjustment)
Low-Pressure Motor ControlvsHigh-Pressure Motor Control

A low-pressure motor control's differential adjustment affects only the cut-out pressure, while a high-pressure motor control is a safety device set to cut out the compressor at 20% above normal head pressure.

Modern Refrigeration and Air Conditioning, Section 16.3.4 (Pressure Motor Controls — Low-Pressure Motor Controls)

Términos Clave

Fire Extinguisher Travel Distance (Construction) 29 CFR 1926, §1926.150(c)(1)(i)
Per 29 CFR 1926.150(c)(1)(i), a 2A-rated fire extinguisher must be provided for each 3,000 sq ft of protected building area and travel distance to the nearest extinguisher shall not exceed 100 feet.
Permissible Noise Exposure (8-Hour) 29 CFR 1926, Subpart D, §1926.52(a)
Per 29 CFR 1926.52(a), the maximum permissible noise exposure for an 8-hour workday on a construction site is 90 dBA slow response.
Asbestos TWA PEL (Construction) 29 CFR 1926, Subpart Z, §1926.1101(c)(1) and (i)(1)
Per 29 CFR 1926.1101(c)(1), the permissible exposure limit for airborne asbestos is 0.1 fiber per cubic centimeter of air as an 8-hour TWA; protective clothing is required when this limit is exceeded.
Employer PPE Payment Requirement 29 CFR 1926, Subpart E, §1926.95(d)(1)
Per 29 CFR 1926.95(d)(1), the employer must provide all required personal protective equipment at no cost to employees, including replacement PPE except when the employee lost or intentionally damaged it.
First Aid Kit Inspection Frequency 29 CFR 1926, Subpart D, §1926.50(d)(2)
Per 29 CFR 1926.50(d)(2), first aid kit contents must be checked before each job and at least weekly on each job to ensure expended items are replaced; kits must be stored in a weatherproof container with individual sealed packages.
Toilet Facility Minimum (≤20 Employees) 29 CFR 1926, Subpart D, §1926.51(c)(1)
Per 29 CFR 1926.51(c)(1) Table D-1, at least one toilet facility must be provided for 20 or fewer employees on a construction jobsite.
Eye/Body Drench Facility Requirement 29 CFR 1926, Subpart D, §1926.50(g)
Per 29 CFR 1926.50(g), where eyes or body may be exposed to injurious corrosive materials, suitable quick-drenching or flushing facilities must be provided within the work area for immediate emergency use.
Zeotropic Refrigerant Fractionation Modern Refrigeration and Air Conditioning, Page 259
Zeotropic blends (400-series, e.g., R-410A) must be charged as a liquid because vapor charging causes fractionation—individual refrigerants separate by boiling point, creating an improper mixture in the system.
Transformer Turns Ratio Formula Modern Refrigeration and Air Conditioning, Section 12.7 (Transformer Basics), Page 286
Secondary voltage is proportional to the turns ratio: VS/VP = NS/NP; e.g., a 100-turn primary at 120 V with a 50-turn secondary produces 60 V output.
Power Factor Modern Refrigeration and Air Conditioning, Section 13.1.3 (Power Factor)
Power factor equals true power (watts) divided by apparent power (VA), expressed as a percentage; inductive circuits have a low power factor corrected by adding capacitors.
Synchronous Motor Speed Modern Refrigeration and Air Conditioning, Section 15.1.4 (Motor Speed — Synchronous Speed)
Synchronous speed (RPM) = 120 × frequency (Hz) ÷ number of poles; a four-pole motor at 60 Hz has a synchronous speed of 1,800 RPM with an actual operating speed of approximately 1,750 RPM due to slip.
PTC Relay Cool-Down Period Modern Refrigeration and Air Conditioning, Section 16.3.5 (Motor Starting Relays — Positive Temperature Coefficient Relays)
A positive temperature coefficient relay uses a thermistor that requires a cool-down period of typically two to five minutes after shutdown before its resistance drops low enough to allow motor restart.
Identifying Common (C) Terminal on Hermetic Compressor Modern Refrigeration and Air Conditioning, Section 15.5.1 (Identifying Unmarked Compressor Terminals)
Using an ohmmeter on the three terminals, the highest resistance reading spans the S and R terminals (both windings in series); the terminal not included in that measurement is the Common (C) terminal.
Voltage Tolerance for HVACR Motors Modern Refrigeration and Air Conditioning, Section 13.3.4 (Unintentional Voltage Drop) and Section 15.4 (Standard Motor Data)
HVACR equipment must operate within ±10% of rated voltage; for a 240 V motor the minimum acceptable terminal voltage is 216 V, below which overheating risk increases.
DDC Signal Range Modern Refrigeration and Air Conditioning, Section 16.5 (Direct Digital Controls)
In direct digital control systems, wiring between the controller and sensors carries low-voltage signals typically in the range of 0–10 Vdc or 4–20 mA.
High-Side Liquid Line Restriction Symptom Pattern (TXV System) Modern Refrigeration and Air Conditioning, Ch. 53, Fig. 53-20 / High-Side Restriction
A liquid line restriction in a TXV system starves the evaporator, producing low suction pressure, low head pressure, and high superheat with normal subcooling; bubbles appear in the sight glass at the restriction point.

Fórmulas que Debes Saber

Watt's Law (Power)P (watts) = I (amps) × E (volts)
Power FactorPF (%) = (True Power in W ÷ Apparent Power in VA) × 100
Transformer Turns RatioVS / VP = NS / NP → VS = VP × (NS / NP)
Motor Synchronous SpeedNS (RPM) = 120 × f (Hz) ÷ P (number of poles)
Minimum Acceptable Motor Voltage (±10% tolerance)V_min = Rated Voltage × 0.90
Dual-Voltage Three-Phase Motor Winding ConnectionHigh voltage → windings in SERIES; Low voltage → windings in PARALLEL