Hoja de Referencia del Examen · Referencia Rápida

South Carolina Non-Structural Renovation

South Carolina  ·  PSI Services Contractor

Verificado, no estimado. Cada cifra a continuación proviene de la estructura oficial del examen que mantenemos: número de preguntas, puntaje de aprobación y ponderación de temas. Las preguntas de práctica están fundamentadas en la ley fuente con citas de estatutos. Omitimos cualquier cifra que no podamos verificar en lugar de adivinarla.
Total de preguntas
60
Puntaje de aprobación
70%
Tiempo del examen
150 min
Administrado por
PSI Services Contractor
Formato
Se permiten materiales de referencia

Porción Estatal de South Carolina 60 preguntas

Lectura de Planos y Estimación 4 Q · 7%
Reading and interpreting architectural plan views (site, foundation, floor, framing, electrical, mechanical plans)Reading elevations, section views, and detail drawingsArchitectural drawing elements: lines, dimensions, symbols, notes, and abbreviationsScale drawings and use of the architect's scaleSchedules and specifications (door, window, room-finish schedules; written specifications)Types of cost estimates (pre-design, quantity takeoff, unit-cost)Calculating material quantities (board feet, square footage, lineal feet) and using estimating abbreviationsBid preparation: direct costs, overhead, profit margin, and change orders
Ventanas y Puertas 8 Q · 13%
Door types and construction (solid-core, hollow-core, raised-panel, flush)Exterior door installation and framing requirementsInterior door installation (pre-hung, hinged, pocket, bifold, bypass, folding)Door hardware (hinges, locksets, strike plates, weatherstripping)Window types and components (double-hung, casement, awning, hopper, sliding, stationary)Window energy efficiency (glazing types, U-values, low-e coatings, weatherstripping)Safety glazing requirements and hazardous locations (SC Building Code Chapter 24)Door and window trim and casing installation
Oficios Asociados (incluyendo aislamiento, control de humedad, pisos y acabados generales) 9 Q · 15%
Thermal insulation types, R-values, and installation (batts, loose-fill, rigid board, spray foam)Vapor retarders and moisture control in walls, floors, and crawl spacesAttic and crawl space ventilation requirementsWood flooring types, grading, acclimation, and moisture contentHardwood strip and plank flooring installation techniquesResilient flooring (vinyl sheet and tile) and ceramic tile installationFloor finishing: sanding, filling, staining, and finish coatings (penetrating oils, shellac, polyurethane, waterborne urethane)Interior and exterior paint types, surface preparation, application techniques, and common paint failures
Carpintería Gruesa 8 Q · 13%
Wall framing components (studs, plates, headers, cripple studs, trimmer studs, rough sills)Floor framing components (sill plates, joists, girders, posts, rim joists, bridging)Roof framing types and components (common, hip, valley, and jack rafters; ridge board vs. ridge beam)Sheathing installation for walls, floors, and roofs (plywood and OSB panels, nailing schedules)Framing systems (platform framing, balloon framing, in-line framing, post-and-beam framing)Wood materials and lumber grading (species, grades, moisture content, preservative treatment requirements per SC Building Code Chapter 23)Roof styles and framing plans (gable, hip, shed, gambrel, mansard; slope and pitch calculations)Engineered wood products (LVL, I-joists, glulam, OSB) and their application in framing
Carpintería de Acabado 6 Q · 10%
Door installation and hanging (prehung, passage, bifold, pocket, and exterior doors)Door and window trim (casing styles, reveal layout, mitered and butted frames, stool and apron)Molding installation (crown/cornice, base, chair rail, picture rail, coped and mitered joints)Wood flooring installation (strip, plank, and parquet; subfloor prep; moisture management; layout and nailing)Stair trim-out (skirt boards, treads, risers, balustrade components, newel posts, balusters, handrail systems)Cabinet and closet installation (layout reference lines, base and wall cabinets, countertops, closet shelving and poles)Wall treatments and paneling (tongue-and-groove wainscot, frame-and-panel wainscot, sheet paneling, chair and picture rail)Finish carpentry tools, sequencing, and site preparation (hand tools, power tools, job sequencing top-down, rough frame prep, blocking and backing)
Revestimiento Exterior 4 Q · 7%
Types of siding materials (wood, vinyl, fiber cement, plywood, stucco, brick veneer)Moisture protection and weather-resistive barriers (building paper, housewrap, flashing, drainage plane)Wood bevel siding installation (layout, story pole, exposure, coursing, nailing)Wood shingle siding installation (coursing styles, grades, spacing, nailing)Vinyl siding installation and fastening requirementsCode requirements for exterior wall coverings (SC Building Code Chapter 14, minimum thickness, material standards)Estimating siding materials (area calculation, waste factors, nail quantities)Safety practices for siding installation (fiber cement dust, working at height)
Drywall 8 Q · 13%
Gypsum panel types and product selection (standard, Type X, Type C, moisture-resistant, abuse-resistant, flexible)Panel installation methods (single-layer, double-layer, perpendicular vs. parallel application, fastener types and spacing)Framing requirements for drywall (wood and steel framing, maximum frame spacing, deflection limits, limiting heights)Levels of drywall finish (Level 0 through Level 5 definitions and applications)Joint treatment and taping (embedding tape, compound types, prefilling, setting-type vs. drying-type compounds)Trim accessories and control joints (corner bead types, metal trim, control joint placement and spacing limits)Fire-resistance-rated gypsum assemblies (Type X/C requirements, UL-listed assemblies, SC Building Code Chapter 25 and Chapter 7 requirements)Common drywall problems, causes, and remedies (nail pops, joint cracking, board sag, blistered tape, fastener defects)
Estructura de Perfiles Metálicos 8 Q · 13%
Cold-formed steel member types and designation system (STUFL acronym: stud, track, U-channel, furring, L-header)Steel stud gauges, mil thickness, and load-bearing vs. non-load-bearing applicationsPerformance method vs. prescriptive method of steel framing designStick-built, panelized, and pre-engineered construction typesFastening methods: screws, welding, clinching, and drive pins (pullout capacity and screw selection)In-line framing and axial load transfer through walls, floors, and roofFraming tools for steel construction (screw guns, shears, chop saws, plasma cutters, aviation snips)Stud spacing, deflection limits, and limiting height tables for non-load-bearing partitions (per SSMA/ASTM C754)
Seguridad OSHA 5 Q · 8%
Fall protection systems and guardrail requirements (Subpart M)Personal protective equipment selection and employer payment obligationsHazardous substances and permissible exposure limits (Subpart Z/Subpart D)Asbestos identification, classification, and abatement proceduresFire protection, prevention, and flammable liquid storageElectrical safety and ground-fault protection on construction sitesLadder and stairway safety requirementsConfined space entry procedures and permit requirements

Distinciones Clave

Penetrating floor finishvsSurface-coating floor finish

A penetrating finish absorbs into wood fibers and wears only as the wood wears without chipping, while a surface coating sits on top of the wood and can chip or scratch.

Carpentry And Building Construction, Section 34 - Types of Finishes
Standard chop sawvsBlade-sliding compound miter saw

The standard chop saw has a faster cutting action suited to quick, repetitive cuts on small molding stock, while the blade-sliding compound miter saw is slower but more versatile.

Finish Carpenter's Manual, Chapter 3 - The Power Tools
Overhead costsvsDirect costs

Overhead costs (e.g., bookkeeping and legal expenses) are not tied to a specific job, while direct costs (e.g., rental equipment, labor, fasteners, glue, sandpaper) are charged directly to a particular job.

Modern Finish Carpentry, Chapter 20 — Bids and Contracts section
Life-cycle cost analysisvsInitial construction cost evaluation

Life-cycle cost analysis considers the total cost of an assembly throughout its entire useful life including maintenance, whereas initial construction cost evaluation only considers upfront costs.

Gypsum Construction Handbook, Chapter 10 — Selection of Materials
Assembling picture-frame casing on a flat work surfacevsAssembling picture-frame casing directly around the window

The correct method is to assemble the mitered frame with spline biscuits and glue on a flat work surface, then lift the completed frame to the window; assembling around the window is incorrect.

Modern Finish Carpentry, Chapter 9 — Casing Surround Frames: The Picture Frame Method
Handsaw with shopmade jig (delicate moldings)vsPower miter saw (general molding cuts)

Delicate molding profiles prone to splintering should be cut with a handsaw guided by a shopmade jig with pre-cut miter slots, whereas a power miter saw is used for standard milling cuts.

The Complete Illustrated Guide To Furniture And Ca, Chapter 10 - Cutting and Attaching Moldings, Page 111 (Sawing Delicate Miters section)
TheodolitevsStandard transit/level

A theodolite reads horizontal and vertical angles electronically and displays measurements on an LCD screen, while a standard transit/level requires manual reading of a vernier scale.

Carpentry and Building Construction, Chapter 9 — Types of Instruments
Shielded or lead-covered conductor bending radiusvsNonshielded conductor bending radius

Shielded or lead-covered conductors rated over 1000 V must have a minimum bending radius of 12 times the overall diameter, while nonshielded conductors require only 8 times the overall diameter.

NEC 305.5
Load-bearing steel wall rough openingvsNonload-bearing steel wall rough opening

In a nonload-bearing steel partition, the rough opening for a door allows 1½ inches extra on each side for wood studs at hinges and strike plates; panelized (load-bearing) openings add 12 inches of width to accommodate two trimmer jack studs and a wood stud on each side.

Carpentry and Building Construction, Section 29.3, Rough Openings (Nonload-Bearing Walls)
Differential levelingvsSingle-setup leveling

Differential leveling is used when elevation differences between remote points require one or more intermediate instrument setups, while single-setup leveling is performed from one instrument position.

Carpentry and Building Construction, Chapter 9 — Measuring a Difference in Elevation
MV-90 cablevsMV-105 cable

Type MV-90 medium voltage cable has a maximum operating temperature of 90°C, while Type MV-105 has a maximum operating temperature of 105°C; both are suitable for dry or wet locations.

NEC Table 315.10(A)
Window/door schedulevsRoom-finish schedule

A window/door schedule is a chart providing rough-opening sizes for windows and doors, while a room-finish schedule identifies the materials and finishes for floors, walls, and ceilings in each room.

Carpentry and Building Construction, Section 16.2, Page 440

Términos Clave

Competent Person (OSHA) OSHA 1926 CFR 29, Page 31
Per OSHA 29 CFR 1926.32(f), a person capable of identifying existing and predictable hazards who has authorization to take prompt corrective measures to eliminate them — no specific degree or certificate is required.
Fire Extinguisher Rating — 2A (OSHA) OSHA 1926.150(c)(1)(i)
Per OSHA 1926.150(c)(1)(i), a fire extinguisher rated not less than 2A must be provided for each 3,000 square feet of protected building area on a construction site.
Fire Alarm System Requirement (OSHA) OSHA 1926.150(e)(1) and (e)(2)
Per OSHA 1926.150(e)(1) and (e)(2), an employer must establish an alarm system (telephone, siren, etc.) to alert employees and the local fire department, with alarm codes conspicuously posted at phones and employee entrances.
Qualified Equipment Operator (OSHA) OSHA 1926 CFR 29, Page 29
Per OSHA 1926.20(b)(4), only employees qualified by training or experience may operate equipment and machinery on a construction site.
Danger Sign Color Standard (OSHA) OSHA 1926 CFR 29, Page 201
Per OSHA 1926.200(b)(2), danger signs must have red as the predominating color for the upper panel, black outline on borders, and a white lower panel for additional wording.
First Aid Kit Inspection Frequency (OSHA) OSHA 1926 CFR 29, Page 33
Per OSHA 29 CFR 1926.50, first aid kit contents must be checked by the employer before each job and at least weekly on each job to replace expended items.
Minimum Cover Depth — Direct-Buried Cable over 1000 V to 22 kV (NEC) NEC Table 305.15(A)
Per NEC Table 305.15(A), direct-buried cables rated over 1000 V AC through 22 kV require a minimum cover depth of 750 mm (30 in.) under general conditions.
Minimum Cover Depth — Rigid Metal Conduit over 22 kV to 40 kV (NEC) NEC Table 305.15(A)
Per NEC Table 305.15(A), circuits over 22 kV through 40 kV installed in rigid metal conduit require a minimum cover depth of 150 mm (6 in.).
Batter Boards Carpentry and Building Construction, Chapter 9 — Setting Up Batter Boards
Temporary framing structures set at least 4 feet beyond foundation corner lines, used to hold string lines that define building layout during excavation and foundation work.
Differential Leveling Carpentry and Building Construction, Chapter 9 — Measuring a Difference in Elevation
A surveying process for determining elevation differences between remote points that requires one or more intermediate instrument setups.
Porosity Carpentry and Building Construction, Chapter 9 — The Excavation
The measurement of the ability of water to flow through soil, used to assess drainage conditions before construction begins.
Span Table Carpentry and Building Construction, Section 13.2, Page 355
A manufacturer- or code-provided list specifying the distances a structural product (such as a floor joist or I-joist) can span between structural supports such as walls or columns.
Board Foot Carpentry and Building Construction, Section 13.2, Page 359
A unit of lumber volume equal to a piece measuring 1 inch thick × 12 inches wide × 12 inches long, calculated as (nominal thickness × nominal width × length in feet) ÷ 12.
Life-Cycle Cost Analysis Gypsum Construction Handbook, Chapter 10 — Selection of Materials
A method of evaluating building materials or assemblies by considering the total cost over their entire useful life, including maintenance, rather than only initial construction cost.
3-4-5 Rule Carpentry and Building Construction, Section 16.2, Pages 438-439
A layout method for checking square corners: if one leg measures 3 feet and the adjacent leg measures 4 feet, the diagonal must equal exactly 5 feet to confirm a 90-degree angle.
HDR (Architectural Abbreviation) Carpentry and Building Construction, Ready Reference Appendix, Page 1024
The standard architectural drawing abbreviation for 'Header,' not to be confused with HDW (Hardware).

Fórmulas que Debes Saber

Board FeetBoard Feet = (Nominal thickness (in) × Nominal width (in) × Length (ft)) ÷ 12
Excavation Volume (cubic feet)Volume (cu ft) = (Building length + clearance both sides) × (Building width + clearance both sides) × Depth
Cubic Feet to Cubic YardsCubic Yards = Total Cubic Feet ÷ 27
Floor / Roof Plan AreaArea (sq ft) = Length (ft) × Width (ft)
Roof Sheathing Panels with WastePanels needed = (Roof area ÷ 32) × 1.05 [add 5% for trim and waste]
Excavation Volume using Depth FactorVolume (cu yd) = Plan area (sq ft) × Depth factor (cu yd per sq ft)
Maximum Riser / Tread VariationMax variation = ≤ ⅜ inch between tallest and shortest riser (or deepest and shallowest tread) in a single stairway
Drawing Scale ConversionActual dimension (ft) = Measured drawing distance (in) ÷ Scale factor [e.g., at ¼" = 1′-0", each ¼" = 1 ft]