Verificado, no estimado. Cada cifra a continuación proviene de la estructura oficial del examen que mantenemos: número de preguntas, puntaje de aprobación y ponderación de temas. Las preguntas de práctica están fundamentadas en la ley fuente con citas de estatutos. Omitimos cualquier cifra que no podamos verificar en lugar de adivinarla.
Total de preguntas
80
Puntaje de aprobación
70%
Tiempo del examen
240 min
Administrado por
PSI Services Contractor
Formato
Se permiten materiales de referencia
Porción Estatal de South Carolina
80 preguntas
Accesibilidad ADA1 Q · 1%
Water closet location, clearance dimensions, and seat height requirementsGrab bar specifications for toilet and bathing facilities (dimensions, placement, structural strength)Accessible and ambulatory toilet compartment size and door requirementsDrinking fountain requirements for wheelchair users and standing persons (spout height, location, water flow)Shower compartment types and dimensions (transfer-type, standard roll-in, alternate roll-in)Lavatory and sink clearances, mounting heights, and knee/toe clearanceAccessible bathtub requirements (clearances, grab bars, controls, hand shower, seat dimensions)Turning space and clear floor space dimensions for accessible toilet and bathing rooms
Conocimiento General de Plomería6 Q · 8%
IPC code scope, purpose, and applicability to plumbing systemsPermits: application, issuance, expiration, and exempt workInspections and testing requirements (underground, rough-in, final, and system pressure tests)Code official authority, duties, violations, and stop work ordersKey plumbing terminology and definitions (IPC Chapter 2)General installation regulations: pipe protection, support intervals, trenching, and backfillSC 811 one-call notification requirements, excavator responsibilities, and tolerance zone rulesBasic plumbing mathematics: measurements, formulas, geometry, and unit conversions
Regulaciones Generales de Plomería3 Q · 4%
Permit application, issuance, expiration, and exemptionsCode official authority, duties, and enforcement powersInspections and testing requirements for plumbing systemsViolations, stop work orders, and unsafe plumbing condemnationSC 811 excavator notification requirements and locate request proceduresTolerance zone requirements and hand-dig rules near underground facilitiesEmergency excavation procedures and damage reporting under SC lawPlumbing business licensing, bonding, and contractor responsibilities
Colgadores y Soportes (General)2 Q · 2%
Hanger spacing intervals by pipe material (Table 308.5)Maximum horizontal and vertical support spacing requirementsApproved materials for hangers, anchors, and supports (galvanic action prevention)Structural attachment of hangers and anchors to building constructionSway bracing for horizontal drainage pipes at direction changesAnchorage and restraint of drainage piping at direction and diameter changesSupport requirements for thermal expansion tanks and manifold piping systemsDefinition and equivalence of hangers, anchors, and supports terms
Materiales2 Q · 2%
Approved pipe and fitting standards for water service and distribution systems (Table 605.3, 605.4, 605.5)Approved pipe and fitting standards for sanitary drainage, waste, and vent systems (Tables 702.1, 702.2, 702.3, 702.4)Joining methods and joint types by pipe material (solvent cement, solder, braze, heat fusion, mechanical, press-connect, push-fit)Prohibited joints and connections for water supply and drainage pipingGas piping materials — metallic pipe, tubing, CSST, and plastic pipe standards (IFGC Section 403)Lead content restrictions for water supply pipe, fittings, valves, and solderMaterial identification, third-party certification, and manufacturer markings requirementsApproved materials for vent pipe flashings and specialty fixture construction
Uniones y Conexiones3 Q · 4%
Joint types by pipe material (ABS, PVC, CPVC, PEX, copper, steel, cast iron)Prohibited joints and connections in water supply and sanitary drainage systemsSolvent cementing procedures and primer requirements for plastic pipeSolder and brazed joint requirements for copper pipe and tubingMechanical and press-connect joint installation requirementsJoints between dissimilar piping materials and dielectric fittingsGas piping joint and fitting requirements (threaded, brazed, welded, flared)Fitting allowances and pipe length calculations for threaded, copper, and plastic fittings
Aparatos Sanitarios y Equipos3 Q · 4%
Minimum number of plumbing fixtures by occupancy typeFixture installation requirements and clearancesFixture materials and product standardsWater heater safety devices and relief valvesWater heater installation, access, and location requirementsAccessible plumbing fixtures and facilities (ICC A117.1)Faucets, shower valves, and temperature-limiting devicesGas-fired appliances and specific equipment requirements
Calentadores de Agua4 Q · 5%
Temperature and pressure relief valve requirements and discharge pipingSafety devices (antisiphon devices, vacuum relief valves, pan requirements)Water heater installation requirements (location, access, clearances, attic installations)Cold water supply valve and connection requirementsTemperature controls and maximum water temperature limitsGas-fired water heater listing and installation standards (ANSI Z21.10.1/CSA 4.1, IFGC compliance)Water heaters used for space heating (combination systems, mixing valve requirements)Unfired hot water storage tank insulation requirements
Suministro y Distribución de Agua3 Q · 4%
Backflow prevention devices and assemblies (air gaps, vacuum breakers, reduced pressure principle, double check assemblies)Cross-connection control and potable water system protectionWater service pipe materials, standards, and installation requirementsWater distribution pipe materials, fittings, joints, and connection methodsPipe sizing using water supply fixture units and pressure loss calculationsPressure regulation, water hammer arrestors, and booster systemsHot water supply system requirements including temperature limits, recirculation, and thermal expansion controlWater heater installation, safety devices, and relief valve discharge piping
Prevención de Reflujo1 Q · 1%
Types of backflow (backsiphonage vs. backpressure) and hazard levels (high vs. low hazard contamination vs. pollution)Reduced pressure principle backflow prevention assemblies — application and installation requirementsVacuum breakers — atmospheric-type, pressure vacuum breaker, and spill-resistant types — installation height and use limitationsDouble check backflow prevention assemblies — application to low-hazard and fire protection systemsAir gap requirements — minimum dimensions and application per Table 608.16.1Backflow preventer device selection per Table 608.1 — matching device to degree of hazard and backflow typeSpecial connections requiring backflow protection — boilers, irrigation systems, sprinkler systems, carbonated beverage dispensers, and chemical dispensersBackflow preventer location, access, freeze protection, and relief port discharge requirements
Sistemas de Drenaje Sanitario4 Q · 5%
Drainage fixture unit (DFU) values and system sizing tablesHorizontal drainage pipe slope requirementsCleanout placement, sizing, and access requirementsPipe materials and joint types for above-ground, underground, and building sewer applicationsSumps, ejectors, and below-grade drainage systemsTrap requirements, prohibited trap types, and trap seal protectionGrease interceptors, oil separators, and other interceptor/separator requirementsIndirect waste piping, air gaps, air breaks, and waste receptors
Registros de Limpieza2 Q · 2%
Required locations for cleanouts (horizontal drains, building drains, building sewers, and direction changes)Cleanout spacing intervals and measurement methodsCleanout sizing requirements relative to pipe size servedCleanout plug materials and head typesClearance requirements for cleanout accessCleanout installation arrangement and direction of cleaningCleanout equivalents (fixture traps, removable P-traps)Prohibited use of cleanout openings for fixture or piping extensions
Desagüe Indirecto y Especial2 Q · 2%
Air gap vs. air break requirements and distinctionsWhere indirect waste connections are required (food handling, dishwashers, pools, sterilizers, humidifiers)Waste receptor types, installation requirements, and prohibited locationsIndirect waste pipe trapping requirements and length limitsStandpipe installation requirements and dimensional limitsNeutralizing and dilution devices for corrosive/chemical wastesSeparation of chemical drainage and vent systems from sanitary systems
Ventilación Sanitaria6 Q · 8%
Trap seal protection and maximum allowable pressure differentialVent terminal requirements and prohibited locationsVent pipe sizing using drainage fixture units and developed lengthTypes of venting methods: individual, common, wet, circuit, combination waste and vent, and waste stack ventAir admittance valves: installation, location, size, and use limitationsVent connections, grading, and vertical rise requirementsRelief vents for stacks exceeding 10 branch intervalsFrost closure and outdoor vent extension requirements
Trampas e Interceptores3 Q · 4%
Fixture trap requirements (distance limits, sizing, and prohibited trap types)Trap seal depth requirements and protection methods (primer valves, barrier devices, fixture drain connections)Grease interceptors and automatic grease removal devices (where required, sizing, and installation)Oil separators (required locations, design standards, and capacity requirements)Sand, solids, and specialty interceptors (clothes washers, bottling plants, slaughterhouses)Venting of interceptors and separators to prevent air bindingAccess and maintenance requirements for interceptors and separatorsMaterials, joints, and connections for traps, interceptors, and separators
Sistemas de Tuberías Pluviales2 Q · 2%
Storm drain pipe sizing using rainfall rate and roof area calculations (GPM formula)Acceptable piping materials and standards for storm drainage conductors, building storm drains, and building storm sewersRoof drain requirements, flow rates, and installation standardsSecondary (emergency) roof drains and scuppers: sizing, placement, and discharge requirementsSubsoil drain systems: pipe types, minimum diameter, backwater protection, and discharge locationsSump pits and pumping systems: pit dimensions, pump capacity, discharge piping, and valve requirementsSiphonic and controlled flow roof drain system requirements100-year hourly rainfall rates for South Carolina cities and application to storm system design
Plomería - Longitud Desarrollada5 Q · 6%
Center-to-center vs. end-to-end pipe length calculationsFitting allowances for threaded, copper, PVC, and cast iron fittingsOffset, diagonal, rise, and run calculations using angle constants (45°, 60°, 22½°, 11¼°)Rolling offsets and true offset calculationsGrade, drop, and slope of horizontal drainage pipingDeveloped length measurement for cleanout spacing requirements (IPC Section 708)Developed length of hot water piping from source to fixture (IPC Section 607.2)Equivalent length of fittings and valves for water piping system sizing
Fixture unit (DFU) values and drainage load calculations from isometric drawingsHorizontal and vertical drain pipe sizing using Tables 710.1(1) and 710.1(2)Pipe slope requirements for horizontal drainage pipingVent pipe sizing and developed length determination from isometric layoutsTrap-to-vent distance limits and fixture drain slope requirementsOffset pipe length calculations using 45° constants (diagonal, rise, run)Cleanout placement requirements identifiable from isometric diagramsTrap seal requirements and prohibited trap types identifiable in system layouts
Análisis Isométrico de Suministro de Agua4 Q · 5%
Water supply fixture units (WSFU) and peak demand estimationPressure loss calculations: elevation head, meter loss, tap loss, and friction lossSegmented loss method for sizing water service and distribution pipingEquivalent length of fittings and valves in pipe sizing calculationsPipe offset geometry: diagonal, rise, run, and angle constants for isometric layoutFitting allowances and end-to-end pipe length calculations for threaded, copper, and plastic pipeMinimum fixture supply pipe sizes and flow pressure requirements per IPC Table 604.3 and 604.5Water pressure requirements, pressure-reducing valves, and booster systems
Análisis Isométrico de Drenaje de Techo3 Q · 4%
Rainfall rate conversion to GPM using IPC Equation 11-1Roof drain flow rate and head-based sizing requirementsHorizontal and vertical storm drain pipe sizing using IPC Table 1106.2Vertical leader sizing using IPC Table 1106.3Secondary (emergency) roof drain and scupper sizing requirements100-year hourly rainfall rates for specific cities and geographic regionsIsometric pipe length calculations using center-to-center and end-to-end methods with offset constantsMinimum roof drain quantity requirements and controlled flow system rules
Ensamblaje de Tuberías1 Q · 1%
Fitting allowance calculations for threaded, copper, PVC, and welded pipeCenter-to-center and end-to-end pipe length measurementsPipe offset geometry using 45° and other angle constantsJoint types and connection methods by pipe materialPipe material types, weights, and schedulesDrainage piping slope and change-of-direction fitting requirementsPipe support intervals and protection requirementsGas piping materials, joint types, and installation requirements
Válvulas1 Q · 1%
Full-open valve and shutoff valve placement requirements (IPC 606.1–606.2)Water pressure-reducing valves (ASSE 1003) and pressure booster systemsTemperature and pressure relief valves for water heaters (ANSI Z21.22, IPC 504)Backflow preventer valve types, hazard classification, and applicable standards (IPC Table 608.1)Gas shutoff valve location, access, and identification requirements (IFGC 409)Gas appliance shutoff valve standards and placement (IFGC Table 409.1.1)Backwater valves for sanitary drainage systems (IPC 714)Valve compatibility with piping materials and lead-content requirements (IPC 605.7)
Conocimiento General de Combustibles3 Q · 4%
Fuel gas types and properties (natural gas, LP-gas, manufactured gas, specific gravity, BTU content)Key IFGC definitions and terminology for fuel gas systemsIFGC scope and applicability of fuel gas code regulationsProhibited and approved appliance locations and installation requirementsCombustion air requirements and calculation methodsGas leak recognition (smell, sight, sound indicators)Appliance listing, labeling, and approval requirementsElectrical bonding and grounding requirements for gas piping systems
Gas Natural3 Q · 4%
Gas piping materials, fittings, and approved standards (steel, copper, CSST, polyethylene)Pipe sizing methods and capacity tables (longest length, branch length, hybrid pressure methods)Allowable pressure drop and maximum operating pressure inside buildingsCombustion air requirements for gas appliances (indoor, outdoor, and combination methods)Venting systems for gas appliances (Type B, single-wall, chimneys, vent connectors, termination clearances)Gas piping installation requirements (support, identification, testing, purging, leak checks)Appliance location, clearances, and prohibited installation areasGas leak recognition and emergency response procedures
LP - Gas3 Q · 4%
LP-gas piping system design and sizing methods (longest length, branch length, hybrid pressure)Allowable piping materials and fittings for LP-gas systems (metallic pipe, copper tubing, CSST, polyethylene plastic)LP-gas operating pressure requirements and maximum pressure limits (first-stage, second-stage, low-pressure regulators)LP-gas storage system requirements and compliance with NFPA 58Pressure testing and leak checking of LP-gas piping systemsVenting requirements for LP-gas appliances (vent types, termination, sizing)Combustion air requirements for LP-gas appliancesLP-gas system operation below -5°F and prevention of liquid condensation
Distinciones Clave
Presión de flujovsPresión estática
La presión dinámica se mide en la tubería de suministro, cerca de una salida, cuando esta está completamente abierta y hay flujo, mientras que la presión estática es la presión que hay en la tubería cuando no circula agua (se calcula a 0,433 psi por pie de altura manométrica).
International Plumbing Code 2021, Page 2-4
Compensación por accesorios de cobrevsMargen de ajuste de los racores roscados
La holgura de los racores de cobre se calcula como la distancia entre centros menos la profundidad de la copa de soldadura, sin deducción por rosca, mientras que la holgura de los racores roscados requiere una deducción adicional por rosca.
Mathematics for Plumbers, Unit 10, Pages 56-57 (Allowances for Copper Fittings)
Margen de ajuste para accesorios de PVC (plástico)vsMargen de ajuste de los racores roscados
La holgura de los racores de PVC se mide desde el centro hasta el borde exterior de la copa del cubo (el mismo proceso que con el cobre, sin deducción por rosca), mientras que los racores roscados requieren un paso de deducción por rosca.
Mathematics for Plumbers, Unit 12, Pages 60-61 (Allowance for Plastic Fittings)
Dimensionamiento del desplazamiento de la pila horizontalvsDimensionamiento de apilamientos verticales
Las distancias de desplazamiento de las columnas horizontales deben calcularse utilizando los mismos criterios que para los desagües de los edificios (Tabla 710.1(1)), y no la tabla de dimensionamiento de columnas utilizada para las partes verticales.
Ipc 2021, Section 710.1.1
Conducción de ventilación individual ≤40 pies de longitud desarrolladavsConducción individual >40 pies de longitud desarrollada
Un conducto de ventilación con una longitud desarrollada de 40 pies o menos puede mantener su tamaño mínimo en la base, pero un conducto de ventilación que supere los 40 pies debe aumentarse en un tamaño nominal de tubería a lo largo de toda su longitud.
IRC P3113.1
Dimensionamiento de los conductos de ventilación de chimeneas (Tabla 906.1)vsDimensionamiento de conductos de ventilación individuales (Sección 906.2)
El tamaño de la salida de ventilación de la chimenea se selecciona a partir de la Tabla 906.1 en función del diámetro de la chimenea, la carga DFU y la longitud desarrollada, mientras que el tamaño de cada salida de ventilación individual se determina tomando la mitad del diámetro del desagüe del sanitario (mínimo 1¼ pulgadas) y aumentando un tamaño nominal si la longitud desarrollada supera los 40 pies.
IPC 2021 — Table 906.1
Tubo de drenaje sobre el terreno (Tabla 702.1)vsTubería de desagüe subterránea de un edificio (Tabla 702.2)
Las tuberías de plástico de polietileno (PE) están homologadas para el drenaje subterráneo de edificios y las tuberías de ventilación, pero NO están homologadas para el drenaje en superficie ni para las tuberías de ventilación en superficie, mientras que materiales como el hierro fundido, el ABS y el cobre sí están homologados para ambos usos.
IPC 2021, Tables 702.1 and 702.2
Materiales homologados para el alcantarillado de edificiosvsMateriales prohibidos en el alcantarillado de los edificios
La arcilla vitrificada, el hierro fundido, el hormigón y los tubos de cobre de tipo K o L son materiales homologados para el alcantarillado de edificios, mientras que las tuberías de acero galvanizado no figuran en la lista y, por lo tanto, no están permitidas.
IPC 2021, Table 702.3
Cemento solvente para CPVC (se requiere imprimación, color naranja)vsCemento solvente de un solo paso para CPVC (amarillo)
Cuando un fabricante requiera una imprimación para CPVC, el adhesivo solvente debe ser de color naranja (ASTM F493); cuando se permita el uso de un adhesivo de un solo paso, este debe ser de color amarillo (ASTM F493).
IPC Section 605.14.2
Unión con cemento solvente para PVCvsUnión de CPVC con cemento solvente (en dos pasos)
Las uniones de PVC requieren una imprimación de color morado (ASTM F656) y cemento conforme a la norma ASTM D2564, mientras que las uniones de CPVC en dos pasos requieren una imprimación homologada seguida de cemento de color naranja conforme a la norma ASTM F493.
IRC P2906.9.1.4
Ventilación húmedavsSalida de aire individual (en seco)
Un conducto de ventilación húmedo transporta simultáneamente las aguas residuales de un sanitario y sirve de ventilación para uno o varios sanitarios más, mientras que un conducto de ventilación individual solo cumple la función de ventilación y no transporta las aguas residuales de ningún sanitario.
Factor de ajuste del método de pérdidas segmentadas (medidor de ¾ pulgadas)vsFactor de holgura de montaje simplificado
El método de pérdidas segmentadas añade un 50 % de la longitud desarrollada para tener en cuenta los accesorios y las válvulas (longitud equivalente × 1,5), mientras que el método simplificado de dimensionamiento para un contador de ¾ de pulgada multiplica la longitud real de la tubería por 1,2 para compensar las pérdidas en los accesorios.
International Plumbing Code 2021, Page E-4 (Section E103.3, Step 6)
Términos Clave
Norma sobre el aumento del tamaño de los conductos de ventilación individuales (>40 pies) IRC P3113.1
De acuerdo con la sección 906.2 del IPC 2021, cualquier conducto de ventilación individual cuya longitud desarrollada supere los 40 pies deberá aumentarse en un tamaño nominal de tubería a lo largo de toda su longitud desarrollada.
Requisitos de dimensionamiento del desplazamiento de apilamiento horizontal Ipc 2021, Section 710.1.1
De acuerdo con el artículo 710.1.1 del IPC, las desviaciones de las tuberías de desagüe horizontales deben dimensionarse utilizando los mismos criterios que los desagües de los edificios, de conformidad con la tabla 710.1(1).
Límite de distancia de la conexión del conducto de ventilación IPC Section 904.4
De acuerdo con el artículo 904.4 del IPC, cuando una tubería de ventilación se conecte al desagüe del edificio, la conexión deberá situarse aguas abajo de la tubería de desagüe y a una distancia no superior a 10 veces el diámetro de esta.
Intervalo de limpieza de las bocas de registro del sistema de drenaje horizontal International Plumbing Code 2021, Page 7-7 (Section 708.1.1)
De conformidad con el artículo 708.1.1 del IPC, las bocas de registro de las tuberías de drenaje horizontales situadas en el interior de los edificios deben instalarse a intervalos que no superen los 100 pies, medidos a lo largo de la longitud desarrollada.
Desvío en un cambio de dirección (>45°) International Plumbing Code 2021, Page 7-7 (Section 708.1.4)
De conformidad con el artículo 708.1.4 del IPC, debe instalarse una boca de limpieza siempre que una tubería de drenaje horizontal, un desagüe del edificio o una red de alcantarillado del edificio presente un cambio de dirección horizontal superior a 45 grados.
Diámetro mínimo de las tuberías de suministro de agua International Plumbing Code 2021, Page 6-2 (Section 603.1)
De conformidad con el artículo 603.1 del IPC, la tubería de suministro de agua que acceda a una vivienda no deberá tener un diámetro inferior a ¾ de pulgada, independientemente del número de grifos a los que dé servicio.
Longitud máxima desarrollada de la red de distribución de agua caliente International Plumbing Code 2021, Page 6-11, Section 607.2
De conformidad con el artículo 607.2 del IPC, la longitud total de las tuberías de agua caliente o templada desde la fuente hasta el punto de uso más alejado que requiera agua caliente no deberá superar los 50 pies.
Requisitos de espesor de pared para roscas de CPVC International Plumbing Code 2021, Page 6-7
De acuerdo con la sección 605.14.3 del IPC, las tuberías de CPVC que vayan a roscarse deben tener un espesor de pared no inferior al del Schedule 80.
Altura de la fuente de ignición del calentador de agua (garaje) International Residential Code, Page 629 (P2801.7)
Según la norma IRC P2801.7, los calentadores de agua con una fuente de ignición instalados en un garaje deben tener dicha fuente elevada a una altura no inferior a 18 pulgadas por encima del suelo del garaje.
Ubicación del elemento sensor de la válvula de alivio de temperatura International Residential Code, Page 630; International Plumbing Code 2021, Page 5-2
De acuerdo con la norma IRC P2804.4 y la sección 504.4.1 del IPC, las válvulas de seguridad térmicas deben instalarse de manera que el elemento sensor controle el agua en las 6 pulgadas superiores del depósito.
Tamaño del manguito de tubería que atraviesa el muro de cimentación IRC P2603.4
Según la norma IRC P2603.4, un manguito para tuberías empotrado en un muro de cimentación debe tener un tamaño nominal dos tallas superior al de la tubería que lo atraviesa.
Presión de prueba de aire del sistema DWV Section 312.3
De conformidad con el artículo 312.3 del IPC, los sistemas de drenaje y ventilación deberán someterse a una prueba de aire a una presión manométrica uniforme de 5 psi, que se mantendrá durante un mínimo de 15 minutos; las tuberías de plástico no deberán someterse a esta prueba de aire.
Presión de flujo International Plumbing Code 2021, Page 2-4
Según el artículo 202 del IPC, la presión de caudal es la presión que se registra en la tubería de suministro de agua cerca de un grifo o una salida de agua cuando dicha salida está completamente abierta y el agua fluye.
Longitud desarrollada International Plumbing Code 2021, Page 2-3
Según el artículo 202 del IPC, la longitud desarrollada es la longitud de una tubería medida a lo largo de la línea central de la tubería y los accesorios, siguiendo el trazado real, incluidos todos los accesorios.
Ventilación húmeda
Un conducto de ventilación húmedo es una tubería que transporta los residuos de un sanitario y, al mismo tiempo, sirve de ventilación para uno o varios sanitarios más; se suele utilizar para un único grupo de aseos.
Accesorios tipo silla de montar (prohibidos) International Plumbing Code 2021, Page 6-6, Section 605.9
De conformidad con el artículo 605.9 del IPC, los accesorios de tipo «silla de montar» están expresamente prohibidos como uniones y conexiones en las redes de suministro de agua.
Fórmulas que Debes Saber
Presión estática derivada de la altura de elevaciónPresión (psi) = Altura (ft) × 0,433 psi/ft
Altura de elevación necesaria para una presión determinadaAltura (pies) = Presión deseada (psi) ÷ 0,433 psi/pie
Diferencia de presión entre dos puntos de toma (sistema por gravedad)ΔP (psi) = (Altitud A − Altitud B) pies × 0,433 psi/pie
Longitud equivalente del tramo (pérdida por segmentación / margen de ajuste)Longitud equivalente = Longitud desarrollada × 1,5 (se añade un 50 % para los accesorios y las válvulas)
Longitud máxima desarrollada para tuberías de agua (método de dimensionamiento en metros de ¾ pulgadas)Longitud máxima desarrollada = Longitud real de la tubería × 1,2
Tamaño mínimo de cada conducto de ventilación (base)Diámetro mínimo del conducto de ventilación = máximo(½ × diámetro del desagüe del accesorio, 1¼ pulgadas)
Ajuste individual del tamaño de los conductos de ventilación para tramos largosSi la longitud desarrollada es superior a 40 pies: tamaño de la salida de ventilación = tamaño básico de la salida de ventilación + un tamaño nominal de tubería
Capacidad de reserva de las tuberías de gasCapacidad disponible (cfh) = Capacidad nominal de la tubería (cfh) − Demanda de los aparatos (cfh)
Margen de tolerancia para los accesorios de cobreMargen de ajuste = Medida de centro a cara − Profundidad de la copa de soldadura (sin deducción por rosca)
Comprobación de la pendiente de las tuberías de drenaje horizontalesPendiente requerida: tubería de ≤2½" → ¼"/pie; tubería de 3"–6" → ⅛"/pie; tubería de ≥8" → 1/16"/pie