Verificado, no estimado. Cada cifra a continuación proviene de la estructura oficial del examen que mantenemos: número de preguntas, puntaje de aprobación y ponderación de temas. Las preguntas de práctica están fundamentadas en la ley fuente con citas de estatutos. Omitimos cualquier cifra que no podamos verificar en lugar de adivinarla.
Total de preguntas
70
Puntaje de aprobación
70%
Tiempo del examen
210 min
Administrado por
PSI Services Contractor
Formato
Se permiten materiales de referencia
Porción Estatal de Virginia
70 preguntas
Normas de Práctica3 Q · 4%
Contractor license classifications and contract value thresholds (Class A, B, C)Prohibited acts and penalties for unlicensed contractingGrounds for license denial, suspension, or revocationExemptions from contractor licensing requirementsLicense application requirements and designated employee responsibilitiesLicense expiration, renewal, and reinstatement proceduresAuthority Having Jurisdiction roles and enforcement powers under NEC Annex HElectrical permit requirements, inspections, and approval procedures
Normas de Conducta2 Q · 3%
Grounds for disciplinary action by the boardProhibited acts resulting in disciplinary actionNegligence or incompetence in licensed professionMisrepresentation and false promisesAiding or abetting unlicensed contractorsCriminal conviction reporting requirementsFailure to obtain required permits or inspectionsAbandonment of contracted work
Renovación y Reintegración2 Q · 3%
License expiration periods for electricians (three-year term)Continuing education requirements for electrical license renewal (three hours, code changes)Renewal fees for tradesman license ($160)Reinstatement fees for tradesman license ($210) and reinstatement window (within 30 days of expiration)Maximum reinstatement period (24 months) and requirement to reapply after expirationRenewal notice procedures and regulant obligation to renew regardless of notice receiptBoard authority to deny renewal for same reasons as initial licensure refusal or discipline
Definiciones1 Q · 1%
Definitions of accessibility terms (accessible, readily accessible, concealed, exposed)Grounding and bonding terminology (grounded conductor, grounding electrode, bonding jumper types, equipment grounding conductor)Branch circuit types and definitions (general-purpose, individual, multiwire, appliance)Overcurrent protection terms (overcurrent, overload, fault current, interrupting rating, selective coordination)Service and feeder terminology (service point, service conductors, service drop, service lateral, feeder)Location classifications (damp, dry, wet locations) and enclosure-related terms (enclosed, guarded, weatherproof, watertight)Dwelling and occupancy definitions (dwelling unit, one-family, two-family, multifamily, bathroom, kitchen, guest room)Protection device definitions (AFCI, GFCI, surge-protective device, circuit breaker types)
Requisitos para Obtener Licencia1 Q · 1%
Education and experience combinations required for journeyman electrician licensureDefinition of journeyman electrician and scope of electrical workMinimum age and general application requirements for licensureVerification of experience and formal vocational training documentationExemptions from examination for journeyman electrician licensureContinuing education credit allowable toward formal vocational training hoursDisclosure of criminal convictions and prior disciplinary actions on applicationsOut-of-state licensure and substantial equivalency requirements
Revocación de Licencia1 Q · 1%
Grounds for revocation or suspension of a license or certificationProhibited acts that may result in disciplinary actionBoard authority to revoke, suspend, or deny license renewalRevocation of permits due to code violations or misrepresentationEffect of revocation on eligibility for future licensureNotification requirements upon revocation or suspension by another jurisdictionSubstantial identity of interest as grounds for revocationRevocation and suspension of inspector authority by the Electrical Board
Conocimientos Eléctricos Generales3 Q · 4%
NEC Article 100 definitions and terminologyBranch circuit types, ratings, and requirementsOvercurrent protection devices and their applicationGrounding and bonding terminology and conceptsService entrance conductors and service equipmentGFCI and AFCI protection requirementsFeeder conductor sizing and load calculationsWorking space and equipment installation requirements
Requisitos para Instalaciones Eléctricas2 Q · 3%
Equipment approval, examination, and listing requirementsWorking space and clearance dimensions around electrical equipmentElectrical connections, conductor terminations, and temperature limitationsConductor materials, sizes, and wiring integrityMarking requirements for equipment, hazard labels, and disconnecting meansGuarding of live parts and arc-flash hazard warningEnclosure type selection for indoor and outdoor useUnderground installation cover requirements and protection
Fundamentos Eléctrico-Electrónicos2 Q · 3%
Grounding and bonding requirements for electrical systems (Article 250)Grounding electrode system types, installation, and sizingEquipment grounding conductor types, identification, and sizingConductor types, insulation ratings, ampacity tables, and temperature limitations (Article 310)Working space, clearances, and guarding of live parts around electrical equipment (Article 110)Identification and use of grounded conductors (Article 200)Bonding of piping systems, structural metal, and service equipmentSurge-protective devices and overvoltage protection (Article 242)
Circuitos Ramales4 Q · 6%
GFCI protection requirements by location for dwelling and non-dwelling unitsAFCI protection requirements for dwelling units and other occupanciesBranch circuit ratings and permissible loads for 15, 20, 30, 40, and 50-ampere circuitsRequired branch circuits in dwelling units (small appliance, laundry, bathroom, garage)Minimum conductor ampacity and sizing for branch circuitsMultiwire branch circuit requirements including disconnecting means and line-to-neutral loadsReceptacle outlet placement and spacing requirements in dwelling unitsBranch circuit voltage limitations by occupancy and equipment type
Acometidas y Alimentadores5 Q · 7%
Service disconnecting means location, rating, and maximum numberService-entrance conductor sizing, ampacity, and wiring methodsFeeder disconnecting means for buildings supplied by feeders or branch circuitsService and feeder overcurrent protection requirements and locationGrounding of service-supplied AC systems and grounding electrode conductorsNumber of services and feeders permitted and exceptions for additional suppliesOverhead and underground service conductor clearances and installation requirementsFeeder and service load calculations including demand factors for dwellings and other occupancies
Puesta a Tierra y Unión6 Q · 9%
Grounding electrode system types, installation, and sizing requirementsEquipment grounding conductor types, sizing, and identificationBonding requirements for services, piping systems, and structural metalMain bonding jumper and system bonding jumper requirementsGrounding of service-supplied and separately derived AC systemsEffective ground-fault current path requirementsGrounding electrode conductor installation, sizing, and connection methodsGrounding and bonding of DC systems and high-impedance grounded neutral systems
Conductores y Cables7 Q · 10%
Conductor ampacity tables and temperature ratings (Table 310.16, 310.17, 310.18, 310.19)Ambient temperature correction factors and adjustment factors for more than three current-carrying conductorsConductor insulation types, applications, and permitted uses by location (dry, damp, wet, direct burial, sunlight exposure)Minimum conductor sizes, materials, and stranding requirementsConductors in parallel: requirements and restrictionsConductor and cable marking requirementsCable type uses permitted and not permitted (NM, NMC, AC, MC, MI, SE, USE, UF)Single-phase dwelling service and feeder conductor sizing (Table 310.12)
Canalizaciones y Cajas7 Q · 10%
Box fill calculations and conductor count requirements (Article 314.16)Pull and junction box sizing for straight pulls and angle/U pulls (Article 314.28)Securing and supporting requirements for conduit types (EMT, RMC, IMC, FMC, PVC)Physical protection of cables and raceways through wood members, framing, and structural elements (Article 300.4)Underground installation requirements and minimum cover depths (Table 300.5)Uses permitted and not permitted for specific raceway types (EMT, RMC, IMC, FMC, PVC, LFMC)Protection against corrosion for raceways and boxes in various environments (Article 300.6)Wiring in ducts, plenums, and other air-handling spaces (Article 300.22)
Ocupaciones Especiales3 Q · 4%
Area classification for hazardous (classified) locations in specific occupancies (commercial garages, aircraft hangars, motor fuel dispensing facilities, bulk storage plants, spray application areas, health care facilities)Wiring methods and equipment requirements within classified and non-classified areas of special occupanciesGrounding and bonding requirements specific to special occupanciesSealing requirements at boundaries of Class I hazardous locations in special occupanciesEssential electrical systems (EES) for health care facilities including life safety, critical, and equipment branchesGFCI protection requirements in special occupancies including health care facilities, swimming pools, spas, and fountainsSwimming pools, spas, hot tubs, and fountain electrical installations including bonding, grounding, and luminaire requirementsEmergency disconnects, special equipment restrictions, and battery charging limitations in hazardous occupancies
Equipos Especiales2 Q · 3%
GFCI protection requirements for pools, spas, hot tubs, and fountainsBonding and grounding requirements for aquatic installationsReceptacle placement and protection distances for pools and spasDisconnecting means for elevators, escalators, and similar equipmentWiring methods for elevator hoistways, machine rooms, and carsOvercurrent protection for electric welders and arc welding equipmentElectric vehicle supply equipment (EVSE) installation and branch circuit requirementsEmergency shutoff and safety requirements for spas and hot tubs
Letreros Eléctricos e Iluminación de Contorno1 Q · 1%
Neon secondary-circuit wiring methods and conduit requirements over 1000 voltsTransformer and electronic power supply ratings and secondary-circuit ground-fault protectionElectrode connections, enclosures, and support requirements for neon tubingClass 2 power sources and secondary wiring for sign illumination systemsNeon secondary-circuit wiring 1000 volts or less and conductor insulation requirementsDisconnecting means and grounding requirements for electric signsPhotovoltaic-powered sign wiring, equipment listing, and disconnecting meansRetrofit kit installation requirements and field-installed skeleton tubing
Motores y Controles5 Q · 7%
Motor branch-circuit conductor ampacity requirements (125% rule for single motors)Motor branch-circuit short-circuit and ground-fault protective device ratings (Table 430.52)Motor overload protection requirements and trip current percentages (430.32)Disconnecting means location, type, and ampere rating requirements (430.102, 430.109, 430.110)Motor controller ratings, design requirements, and types (430.82, 430.83)Conductors for multiple motors and combination loads (430.24)Motor control circuit overcurrent protection and wiring requirements (430.72, 430.74)Motor feeder short-circuit and ground-fault protection ratings (430.62)
Equipos de Utilización4 Q · 6%
Luminaire installation requirements by location (wet, damp, corrosive, closets, bathtubs)Appliance branch-circuit sizing and overcurrent protection requirementsDisconnecting means for appliances, motors, and fixed heating equipmentMotor branch-circuit conductor ampacity and overload protectionAir-conditioning and refrigerating equipment branch-circuit and disconnecting means requirementsFixed electric space-heating equipment branch-circuit sizing and overcurrent protectionLuminaire support, grounding, and wiring methodsGenerator installation, overcurrent protection, and disconnecting means
Iluminación2 Q · 3%
Luminaire installation in specific locations (wet, damp, corrosive, bathtub/shower areas)Luminaires in clothes closets — permitted types and clearance requirementsRecessed luminaire requirements — clearance, thermal protection, and insulation contact (Type IC vs. non-Type IC)Luminaire support methods — outlet boxes, suspended ceilings, poles, and fasteningGrounding of luminaires and lighting equipmentWiring of luminaires — conductor insulation, polarization, splices, and temperature ratingsLighting track installation — permitted locations, connected load, support, and constructionLow-voltage lighting systems (Article 411) — voltage limits, listing, secondary circuit requirements, and branch circuit
Requisitos Generales de Bajo Voltaje1 Q · 1%
Scope and voltage limits for low-voltage lighting systems (Article 411)Listing requirements and system components for low-voltage lightingSecondary circuit requirements: grounding, isolation, and bare conductorsSpecific location requirements including walls, floors, and proximity to waterBranch circuit supply requirements for low-voltage lighting systemsCircuits and equipment operating at less than 50 volts (Article 720) conductor and receptacle requirementsClass 2 and Class 3 power source requirements and circuit classificationsSeparation of Class 2 and Class 3 circuits from power and Class 1 conductors
Sistemas de Comunicación1 Q · 1%
Grounding and bonding requirements for communications cables and primary protectors (Article 800/805)Cable types, listings, and permitted applications by location (plenum, riser, general-purpose, limited-use)Separation requirements between communications cables and electric light/power conductorsOverhead aerial communications wires and cables entering buildings (clearances and installation)Primary and secondary protector requirements and placement for communications circuitsInstallation methods within buildings including raceways, cable routing assemblies, and cable traysCATV coaxial cable systems grounding and installation requirements (Article 820)Network-powered broadband communications systems power limitations and cable classifications (Article 830)
Sistemas de Detección de Incendios y Alarmas1 Q · 1%
Non-power-limited fire alarm (NPLFA) circuit power source and branch circuit requirementsFire alarm circuit classification: NPLFA vs. PLFAOvercurrent protection for NPLFA circuit conductorsFire alarm circuit identification and marking at terminal and junction locationsMechanical execution of work and cable support requirements for fire alarm circuitsSeparation of fire alarm cables from other circuit conductorsFire alarm circuit integrity (CI) cable installation and support requirementsAbandoned fire alarm cable removal requirements
Seguridad4 Q · 6%
Lockout/tagout program requirements and employer responsibilitiesEstablishing and verifying an electrically safe work conditionArc flash risk assessment and arc flash boundaryPersonal protective equipment (PPE) selection and arc flash PPE categoriesElectric shock risk assessment and approach boundaries (limited and restricted)Energized electrical work permit requirements and exemptionsSafety-related work practices and other precautions for personnelSafety-related maintenance requirements for electrical equipment
Distinciones Clave
FMC (conducto metálico flexible)vsLFMC (conducto metálico flexible estanco a los líquidos)
El FMC no debe utilizarse en lugares húmedos (348.12(1)), mientras que el LFMC está permitido cuando se requiera flexibilidad o protección frente a aceites de maquinaria, líquidos, vapores o sólidos, y también está permitido para su enterramiento directo cuando esté homologado y marcado para tal fin (350.10).
NEC 2020 Sección 350.10
Dimensionamiento de cajas de tracción rectavsDimensionamiento de cajas de tirador angulares o en U
En el caso de conductores de 4 AWG o de mayor sección, la longitud de una caja de derivación recta debe ser, como mínimo, 8 veces el tamaño comercial del canal de cables de mayor sección, mientras que una derivación en ángulo o en U requiere, como mínimo, 6 veces el tamaño del canal de cables de mayor sección de la fila, más la suma de los diámetros de todas las demás entradas de canales de cables en esa misma pared.
NEC 2020 Sección 314.28(A)(1)
Motores de accionamiento para ascensores y montacargasvsMotores de los sistemas de accionamiento de escaleras mecánicas y pasillos rodantes
Los motores de los accionamientos de ascensores y montacargas tienen una clasificación de servicio intermitente (620.61(B)(1)), mientras que los motores de los accionamientos de escaleras mecánicas y pasillos rodantes deben tener una clasificación de servicio continuo (620.61(B)(2)).
NEC 2020 Sección 620.61(B)(2)
Conductor conectado a tierra en un edificio o estructura independiente alimentado por un ramal de distribuciónvsConductor con toma de tierra en el lado de la carga del interruptor de desconexión de servicio
En un edificio o estructura independiente, ningún conductor con toma de tierra instalado deberá conectarse al conductor de puesta a tierra del equipo ni a los electrodos de puesta a tierra (250.32(B)(1)); del mismo modo, un conductor con toma de tierra no deberá volver a conectarse a tierra en el lado de la carga del dispositivo de desconexión del servicio, salvo que se permita lo contrario; no se trata de una excepción sin restricciones (250.24(A)(5)).
NEC 2020 Sección 250.32(B)(1)
Cajas redondasvsOtras cajas (no redondas)
No se utilizarán cajas redondas cuando se conecten a un lateral de la caja conductos o conectores que requieran contratuercas o casquillos; para dichas conexiones laterales se podrán utilizar cajas de otras formas (314.2).
NEC 2020 Sección 314.2
Distancia de soporte RMC desde las terminacionesvsDistancia de soporte FMC desde las terminaciones
El RMC debe fijarse de forma segura a una distancia máxima de 900 mm (3 pies) de cada terminación; solo se permite una distancia de 1,5 m (5 pies) cuando los elementos estructurales no permitan fácilmente la fijación a menos de 3 pies (344.30(A)(1)), mientras que el FMC debe fijarse a una distancia máxima de 300 mm (12 pulgadas) de cada caja, armario, cuerpo de conducto u otra terminación (348.30(A)).
NEC 2020 Sección 344.30(A)(1)
En el interior de un recinto con membrana temporal (aplicación por pulverización)vsA menos de 5 pies del recinto de la membrana
La zona situada dentro del recinto con membrana corresponde a la Clase I, División 1, mientras que la zona de 1,5 m (5 pies) situada fuera del recinto corresponde a la Clase I, División 2 (516.18).
NEC 2020 Sección 516.18
Cabina de pulverización con techo cerrado y parte frontal abiertavsCámara de pulverización cerrada con equipo de pulverización automatizado y puertas con enclavamiento
Fuera de una cabina cerrada por la parte superior, abierta por la parte frontal o abierta por la parte delantera, el cableado situado a menos de 915 mm (3 pies) de cualquier abertura debe ser adecuado para la Clase I, División 2 (516.5(D)(2)); en el caso de equipos de pulverización automatizados, la zona situada fuera de las puertas de acceso no está clasificada, siempre que el enclavamiento de la puerta impida las operaciones de pulverización cuando la puerta esté abierta (516.5(D)(4)(2)).
NEC 2020 Sección 516.5(D)(2)
Retroceso del borde frontal de los armarios en paredes de hormigón, azulejos o materiales incombustiblesvsMontaje en caja de superficie en lugares húmedos o mojados
En paredes incombustibles, el borde frontal del armario no deberá quedar retrasado más de 6 mm (¼ pulg.) respecto a la superficie acabada (312.3), mientras que en lugares húmedos o mojados, una caja de superficie debe montarse con un espacio libre de al menos 6 mm (¼ pulg.) respecto a la pared, con la excepción de las cajas no metálicas instaladas sobre hormigón o mampostería (312.2).
NEC 2020 Sección 312.3
Conductor común de electrodo de puesta a tierra para varios sistemas con derivación independientevsConductor del electrodo de puesta a tierra conectado únicamente a uno o varios electrodos revestidos de hormigón
Un GEC común del tipo de cable no deberá ser de sección inferior a 3/0 AWG de cobre o 250 kcmil de aluminio (250.30(A)(6)(a)(1)), mientras que un GEC conectado únicamente a uno o varios electrodos encapsulados en hormigón que no se extienda a otros tipos de electrodos no tiene por qué ser de un calibre superior a 4 AWG de cobre (250.66(B)).
NEC 2020 Sección 250.30(A)(6)(a)(1)
Métodos permitidos de conexión a tierra/puesta a masavsConexiones que dependen de la soldadura
Se permiten los conectores a presión homologados, la soldadura exotérmica y los elementos de fijación tipo tornillo de máquina que se acoplen en al menos dos roscas (250.8(A)), pero no se utilizarán dispositivos de conexión o accesorios que dependan exclusivamente de la soldadura blanda (250.8(B)).
NEC 2020 Sección 250.8(A) y 250.8(B)
Desconectar algunas conexiones a tierra para corregir una corriente indeseablevsDesconectar todas las conexiones a tierra
Cuando existan varias conexiones a tierra que provoquen corrientes indeseables y se siga cumpliendo lo establecido en 250.4(A)(5) o (B)(4), se permite eliminar una o varias de dichas conexiones, pero no todas; no está permitido eliminar todas las conexiones a tierra (250.6(B)).
NEC 2020 Sección 250.6(B)
Términos Clave
Carga continua NEC 2020 Artículo 100 (Definición, Parte I — Continuous Load)
Una carga en la que se prevé que la corriente máxima se mantenga durante 3 horas o más (artículo 100 del NEC), lo cual es importante a la hora de dimensionar los conductores y los dispositivos de protección contra sobrecorriente.
Accionable desde el exterior NEC 2020 Artículo 100 (Definición, Parte I — Externally Operable)
Capaz de funcionar sin que el operador entre en contacto con partes bajo tensión (artículo 100 del NEC); compárese con «frente inactivo» (sin partes bajo tensión expuestas en el lado de manejo), «cerrado» (rodeado por una carcasa o envoltura) y «protegido» (cubierto o blindado para eliminar la posibilidad de acercarse al peligro).
Ubicación en la Zona 20 NEC 2020 Sección 506.5(B)(1)
Un lugar en el que haya concentraciones inflamables de polvo combustible o de fibras o partículas en suspensión inflamables de forma continua o durante largos periodos de tiempo (506.5(B)(1)).
Grupo IIIC NEC 2020 Sección 506.6(A)
Polvo metálico combustible, considerado equivalente a la Clase II, Grupo E (506.6(A)).
Sistema de neutro a tierra de alta impedancia NEC 2020 Sección 250.36
Sistema en el que una impedancia de puesta a tierra limita la corriente de fallo a tierra a un valor bajo; está permitido en sistemas trifásicos de corriente alterna de entre 480 y 1.000 voltios cuando se cumplen todas las condiciones especificadas (250.36).
Puente de conexión del lado de la alimentación (sistema derivado por separado) NEC 2020 Sección 250.30(A)(2)
El puente que debe instalarse con los conductores del circuito desde la caja de la fuente hasta la caja del primer dispositivo de desconexión cuando la fuente de un sistema derivado por separado y el primer dispositivo de desconexión se encuentren en cajas distintas (250.30(A)(2)).
Puente de conexión principal que se fija únicamente con tornillos NEC 2020 Sección 250.28(B)
Cuando el puente de conexión a tierra principal o del sistema consista únicamente en un tornillo, este deberá identificarse con un acabado verde que sea visible una vez instalado el tornillo (250.28(B)).
Trayectoria efectiva de la corriente de fallo a tierra NEC 2020 Sección 250.4(A)(5)
La vía de baja impedancia prevista para la corriente de fallo; la tierra no se considerará una vía efectiva para la corriente de fallo a tierra (250.4(A)(5)).
Corriente peligrosa NEC 2020 Sección 250.6(B)
Corriente resultante de múltiples conexiones a tierra que puede corregirse mediante modificaciones autorizadas, como la supresión de una o varias de dichas conexiones, pero no de todas, siempre que se siga cumpliendo lo establecido en 250.4(A)(5) o (B)(4) (250.6(B)).
Electrodo auxiliar NEC 2020 Sección 250.53(A)(2)
Un electrodo adicional del tipo descrito en los apartados (A)(2) a (A)(8) del artículo 250.52, necesario para complementar un único electrodo de varilla, tubo o placa, salvo que dicho electrodo único tenga una resistencia a tierra igual o inferior a 25 ohmios (250.53(A)(2)).
Puesta a tierra en un edificio o estructura alimentada por un circuito de alimentación o un circuito derivado NEC 2020 Sección 250.32(A)
Dicho edificio o estructura debe disponer de un sistema de electrodos de puesta a tierra y de un conductor de puesta a tierra, de conformidad con la Parte III del artículo 250; en caso de que no exista ningún electrodo, se instalarán los electrodos exigidos en el apartado 250.50 (250.32(A)).
Cable flexible tipo S NEC 2020 Tabla 400.4
Un cable para uso intensivo de 600 V con aislamiento termoendurecible y revestimiento exterior termoendurecible, apto para uso colgante o portátil en lugares húmedos con una clasificación de uso extremadamente intensivo (Tabla 400.4).
Factor de ajuste de la capacidad de conducción de corriente (más de tres conductores que transportan corriente) NEC 2020 Tabla 310.15(C)(1)
Porcentaje aplicado a la capacidad de corriente de la tabla según la Tabla 310.15(C)(1): 4-6 conductores = 80 %, 7-9 = 70 %, 10-20 = 50 %, 21-30 = 45 %, 31-40 = 40 %, 41 y más = 35 %.
Orificios de drenaje instalados in situ (cajas para lugares húmedos o mojados) NEC 2020 Sección 314.15
Se permiten en obra orificios de drenaje homologados con un diámetro no inferior a 3 mm (⅛ pulg.) ni superior a 6 mm (¼ pulg.) en cajas o cuerpos de conductos homologados para entornos húmedos o mojados (314.15).
La holgura de doblado se resta de la altura deseada del trozo para localizar la marca de doblado; la tabla impresa indica 6 pulgadas para un tubo EMT de ¾ de pulgada.
Obligación de informar a las autoridades reguladoras (Virginia) Virginia Board for Contractors Regulations (18 VAC 50-30), 18 VAC 50-30-190(11)
Los profesionales sujetos a regulación deberán informar a la Junta, por escrito y en un plazo de 30 días a partir de la condena, de cualquier delito grave o leve que implique mentir, engañar, robar, cometer un delito sexual, distribuir drogas distintas de la marihuana, causar lesiones físicas o que esté relacionado con el ejercicio de la profesión (18 VAC 50-30-190(11)).
Fórmulas que Debes Saber
Longitud mínima de la caja de tracción recta (conductores de 4 AWG o más)Longitud ≥ 8 × tamaño comercial del canal más grande (por ejemplo, 8 × 2 pulgadas = 16 pulgadas)
Ángulo mínimo/dimensión de tracción en U (conductores de 4 AWG o más)Distancia desde la entrada del canal de cables hasta la pared opuesta ≥ (6 × tamaño estándar del canal de cables más grande de la fila) + suma de los diámetros de todas las demás entradas de canales de cables en la misma pared; p. ej., (6×2)+1 = 13 pulgadas; (6×3)+2 = 20 pulgadas; (6 × 3) solo = 18 pulgadas; (6 × 2½) + 2½ = 17½ pulgadas; (6 × 3) + (1½ + 2½) = 22 pulgadas.
Protección contra sobrecorriente en el circuito de derivación para EVSE (funcionamiento continuo)Valor OCPD ≥ 125 % × carga máxima del equipo (40 A × 1,25 = 50 A)
Potencia nominal máxima de un aire acondicionado de habitación con cable y enchufe que comparta un circuito con tomas de corriente para iluminación o enchufes de uso generalIntensidad nominal ≤ 50 % × intensidad nominal del circuito derivado (50 % × 20 A = 10 A)
Radio mínimo de curvatura del cable tipo MC con armadura entrelazada o cubierta corrugadaRadio (borde interior de la curva) = 7 × diámetro exterior de la funda metálica (7 × 1 pul. = 7 pul.)
Intensidad admisible del conductor entre el controlador y el motor con devanado parcial conectadoCapacidad de corriente ≥ 62,5 % de la corriente a plena carga del motor (50 % × 1,25 = 62,5 %)
Corriente máxima de corte del protector térmico integrado (motor con FLC de 9 A o menos)Corriente de disparo ≤ 170 % × corriente a plena carga del motor según la tabla 430.248 (8 A × 1,70 = 13,6 A)
Diseño de curvas con desplazamiento EMT: marcar el espaciado y la contracción (desplazamiento de 30°)Distancia entre las marcas de curvatura = multiplicador × profundidad de desplazamiento (multiplicador de 30°: 2,0; 2,0 × 4 pulgadas = 8 pulgadas); contracción = 3/8 de pulgada por pulgada de profundidad de desplazamiento (3/8 × 4 pulgadas = 1½ pulgadas); suma la contracción a la distancia medida hasta el obstáculo, de modo que las marcas se desplacen hacia el extremo más alejado (p. ej., 36 pulgadas + 4½ pulgadas de contracción = 40½ pulgadas para la primera marca, en el caso del desplazamiento independiente de la figura EO-6)
Diseño de la curva en forma de silla de montar de 3 puntos de EMTMarcas laterales = 2,5 × altura del obstáculo a cada lado de la marca central (2,5 × 3 pulgadas = 7½ pulgadas); la parte central doblada a 45°, los laterales doblados a 22½°; contracción = 3/16 × altura de la obstrucción (3/16 × 3 = 9/16 pulgadas).
Marca de codo ascendente de 90° EMTMarca desde el extremo del conducto = altura del ramal − holgura (30 pulgadas − 6 pulgadas de holgura para un EMT de ¾ de pulgada = 24 pulgadas)