Alabama Runway Contractor

Alabama  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
30
Passing score
70%
Exam time
75 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Alabama State Portion 30 questions

Sitework 10 Q · 33%
Excavation classification and embankment construction (FAA P-152)Soil compaction methods, equipment, and field density testingSubgrade stabilization using lime, flyash, and cement kiln dust treatmentAirport drainage systems: storm drains, culverts, underdrains, and drainage structuresClearing and grubbing operations and disposal of unsuitable materialsTurfing operations: seeding, sodding, sprigging, topsoiling, and mulchingTemporary erosion, siltation, and pollution control measuresAirport perimeter and security fencing types and installation requirements
Runways 15 Q · 50%
Portland cement concrete pavement mix design and proportioning requirementsFlexible pavement (plant mix bituminous) mix design and job mix formulaSubbase and base course materials, gradation, and compaction requirementsPavement surface treatments and seal coatsConcrete and asphalt pavement joint sealing and crack repairRunway and taxiway surface marking materials and applicationSaw-cut groove dimensions, tolerances, and skid resistancePavement surface preparation and overlay procedures
FAA Regulations 3 Q · 10%
Contract definitions and terminology (AC 150/5370-10F key terms)Bidding, proposal requirements, and contractor prequalificationContract award, execution, and bonding requirementsEngineer authority, inspection rights, and work acceptanceLegal compliance, permits, licenses, and contractor liabilityAirport operational safety during construction (AOA limitations and barricades)Contractor Quality Control Program requirementsMeasurement, payment methods, and liquidated damages for contract time overruns
Lighting 2 Q · 7%
Airport rotating beacon installation, leveling, and beam adjustmentHazard beacon installation, flasher mechanisms, and photoelectric controlsAirport beacon tower erection, lightning protection, and groundingWind cone assembly installation, electrical connection, and groundingAirport obstruction light installation on poles, towers, and structuresUnderground power cable installation, splicing methods, and cable testing requirementsAirport transformer vault construction and electrical equipment installationUnderground electrical duct banks, conduit types, and manhole/junction structure installation

Key Distinctions

Standard Proctor test (ASTM D 698)vsModified Proctor test (ASTM D 1557)

Standard Proctor uses a 5.5-lb hammer dropped 12 in. and delivers about 12,400 ft-lb/ft³, while Modified Proctor uses a 10-lb hammer dropped 18 in. in five layers delivering about 56,000 ft-lb/ft³ for the higher dry unit weights needed on airfield subgrades, embankments and heavily loaded fills.

Soils and Foundations, Section 4-2 (Pages 86-88)
Dynamic compaction depth of influence — cohesionless soilsvsDynamic compaction depth of influence — cohesive soils

Cohesionless (sand) deposits use D = 0.5√(Wh), while cohesive (clayey) deposits use D = √(Wh), with W in metric tons and h in meters.

Soils and Foundations, Section 4-6 (Pages 99-100)
Bank cubic yardsvsLoose cubic yards

Bank yards are the in-place excavated volume, while loose yards are the swelled volume (bank × (1 + swell)) and are the figure used to count haul-off truck loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Preformed joint seal installation temperature (P-605)vsPoured joint sealing material installation temperature (P-605)

Pavement temperature must be above 40 °F (4 °C) for a preformed joint seal, but above 50 °F (10 °C) for poured joint sealing material.

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-605 Joint Sealing Filler, Page 346 (paragraph 605-3.1)
AASHTO classification at the No. 200 sievevsUnified Soil Classification System at the No. 200 sieve

AASHTO calls a soil granular when 35% or less passes the No. 200 sieve and silt-clay when more than 35% passes, while the Unified System calls a soil coarse-grained when more than 50% is retained on the No. 200 sieve (so 45% passing is silt-clay under AASHTO but coarse-grained under USCS).

Soils and Foundations, Pages 20-26 (Section 2-4, Soil Classification Systems; Tables 2-4 and 2-6)
Liquid limit testvsPlastic limit test

Liquid limit is the water content at which the standard groove closes 1/2 in. (12.7 mm) along the bottom at exactly 25 blows of the Casagrande cup, while plastic limit is the water content at which a rolled thread begins to crumble at a 1/8-in. diameter.

Soils and Foundations, Pages 17-18 (Section 2-3, Soil Consistency—Atterberg Limits)
Rock excavation (P-152)vsUnclassified excavation (P-152)

Boulders containing a volume of more than 1/2 cubic yard (0.4 m³) are classified as rock excavation; smaller boulders remain in the unclassified excavation pay item.

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-152, Page 83
Special ProvisionsvsTechnical Specifications / General Provisions

Section 50-03 sets an order of precedence with technical specifications over general provisions, plans, cited standards and cited ACs, but where a Special Provisions paragraph conflicts with the General Provisions or Technical Specifications, the Special Provisions govern.

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Section 50-03 (Page 20)
Cracks wider than 1/4 in (6 mm) before slurry seal (P-626)vsCracks wider than 3/4 in (19 mm) before slurry seal (P-626)

Cracks wider than 1/4 in must be cleaned with compressed air and sealed with a compatible crack sealer, while the 3/4 in value is the threshold above which cracks should be pre-filled and sealed with the slurry mixture itself.

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-626 Emulsified Asphalt Slurry Seal Surface Treatment, Page 392 (paragraph 626-4.4)
CTB 12-hour total-depth limit (304-5.6)vsCTB 2-hour limit from start of mixing (304-5.8)

Successive lifts must be placed and compacted so the required total CTB depth is completed within 12 hours of the first lift, whereas all placement, compaction and finishing operations must be completed within 2 hours from the start of mixing.

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-304 Cement-Treated Base Course, Page 188 (paragraph 304-5.6)
High point grinding (P-401)vsRemoval and replacement (P-401)

Isolated high points may be ground off if course thickness still complies with the plans, but grinding is limited to 15 sq yd; areas in excess of 15 sq yd require removal to the depth of the final course and replacement with new material (skin patching is not permitted).

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-401 Plant Mix Bituminous Pavements, Page 231 (paragraph 401-5.2b(5))
Oven drying for compaction-sample preparationvsOven drying for moisture-content determination

If an oven is used to dry a field sample before a laboratory compaction test, its temperature should not exceed 60 °C (140 °F), whereas 110 °C (230 °F) is the standard oven temperature for moisture-content determinations.

Soils and Foundations, Section 4-2 (Page 86)
Erosion control inside the construction limitsvsErosion control outside the construction limits (P-156)

Control work for areas outside the construction limits — borrow and waste areas, haul roads, equipment and material storage sites and temporary plant sites — is not measured or paid directly but is a subsidiary obligation with costs included in the contract prices bid for the related items.

Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-156, Page 111

Key Terms

Rock excavation (FAA AC 150/5370-10F, Item P-152, para 152-1.2b) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-152, Page 83
Excavation classification applied to all boulders containing a volume of more than 1/2 cubic yard (0.4 cubic meter).
Mortar retempering limit (Item D-751-3.2b) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item D-751, Page 470
Mortar not used within 45 minutes after water has been added must be discarded, and retempering of mortar is not permitted.
D-751 mortar mix (Item D-751-2.2) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item D-751, Page 470
Mortar consisting of one part Portland cement to two parts sand.
Pressure distributor tolerance (Item P-609, para 609-3.3a) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-609 Seal Coats and Bituminous Surface Treatments, Page 356 (paragraph 609-3.3a)
The distributor must apply bituminous material uniformly at the specified rate, with allowable variation from the specified rate not to exceed 10 percent; the unit must carry a tachometer, pressure gauges, volume-measuring devices or calibrated tank, and a thermometer.
Tack coat measurement (Item P-603-4.1) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-603 Bituminous Tack Coat, Page 333 (paragraph 603-4.1)
Bituminous tack coat material is measured by the gallon (liter) or ton with volume corrected to 60 °F (15 °C) using Table IV-3 of Asphalt Institute Manual MS-6 for emulsified asphalt; water added to emulsified asphalt is not measured for payment.
Joint sealing timing (Item P-605-3.1) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-605 Joint Sealing Filler, Page 346 (paragraph 605-3.1)
Joints must be sealed as soon after the curing period as feasible and before the pavement is opened to traffic, including construction equipment.
CTB thickness deficiency adjustment (Item P-304, para 304-6.2.2) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-304 Cement-Treated Base Course, Page 191 (paragraph 304-6.2.2)
When average lot thickness is deficient by more than 1/2 in (12.5 mm) but less than 1 in (25.4 mm), one additional core is taken per sublot; if the recomputed average is still deficient by more than 1/2 in, the lot is removed and replaced at the Contractor's expense or may be permitted to remain at 75 percent of the contract unit price.
Maximum compacted CTB lift thickness (Item P-304, para 304-5.6) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-304 Cement-Treated Base Course, Page 188 (paragraph 304-5.6)
Each compacted cement-treated base lift must be no greater than 6 in (152 mm) thick, with the surface of a compacted lift kept moist until covered by the next lift.
Major damage during surface preparation (Item P-101, para 101-3.3) Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-101 Surface Preparation, Page 76 (paragraph 101-3.3)
Damage that changes the properties of the pavement or removes pavement over 1/8 in deep; paint and rubber over 1 ft wide affecting overlay bond must be removed by chemicals, high-pressure water, heater scarifier (asphaltic concrete only), cold milling, or sandblasting without causing such damage.
Coarse-grained (granular) soil (Soils and Foundations, Sec. 2-1) Soils and Foundations, Page 9 (Section 2-1, Soil Types)
Gravel and sand with soil grains coarser than 0.075 mm (the No. 200 sieve size); silt and clay with grains finer than 0.075 mm are fine-grained.
Cu and Cc validity limit (Soils and Foundations, Sec. 2-2) Soils and Foundations, Page 16 (Section 2-2, Grain-Size Analysis)
The coefficient of uniformity and coefficient of curvature have little or no meaning when more than 5% of the soil is finer than the No. 200 sieve opening (0.075 mm).
Liquidity index (Soils and Foundations, Sec. 2-3, Eq. 2-4) Soils and Foundations, Page 17 (Section 2-3, liquidity index, Eq. 2-4)
LI = (w − PL)/(LL − PL); an LI greater than one means the natural water content exceeds the liquid limit and the soil would behave as a very viscous liquid when sheared.
Sheepsfoot roller (Soils and Foundations, Sec. 4-4) Soils and Foundations, Section 4-4 (Page 95)
A roller whose small projecting feet produce a compacting pressure generally more than 200 lb/in.² and a kneading action effective on fine-grained soils such as clays and silts.
Vibroflotation (Soils and Foundations, Sec. 4-5) Soils and Foundations, Section 4-5 (Page 98)
A vibrocompaction method for loose in situ cohesionless layers up to about 75 ft (23 m) thick, whose compaction effect extends radially 4 to 5 ft (1.2 to 1.5 m) from the Vibroflot, so probes are normally spaced about 10 ft (3 m) apart.
Lime stabilization sequence (Soils and Foundations, Sec. 4-9) Soils and Foundations, Section 4-9 (Pages 113-114)
Mix lime with the natural soil, cure for a few days, remix, then compact; pressure injection (grouting) is a separate technique used where the soil cannot be disturbed.
Portland cement chemical stabilization (Soils and Foundations, Sec. 4-9) Soils and Foundations, Section 4-9 (Page 113)
Adding cement on the order of 7% to 14% by weight for sandy to clayey soils respectively, with the soil at or near optimum moisture content, producing soil stronger than natural soil but far weaker than concrete.
Nuclear moisture-density apparatus (Soils and Foundations, Sec. 4-7) Soils and Foundations, Section 4-7 (Page 105)
Rapid in-place unit weight and moisture device that counts thermal neutrons slowed by hydrogen atoms in water; its moisture determinations can be in error in soils containing iron, boron, or cadmium.
Maximum dry unit weight range (Soils and Foundations, Sec. 4-3) Soils and Foundations, Section 4-3 (Page 92)
Maximum dry unit weights range from about 60 lb/ft³ (9.42 kN/m³) for organic soils to about 145 lb/ft³ (22.78 kN/m³) for well-graded granular material with just enough fines to fill small voids.

Formulas to Know

Seepage per foot of wall width from a flow net (Soils and Foundations, Sec. 5-5)q = k·h·N_f/N_d, where N_f = number of flow channels and N_d = number of equipotential drops; worked example: (2.0 × 10⁻⁴ ft/s)(10 ft)(4)/(8) = 1.0 × 10⁻³ ft³/s per foot of wall
Dynamic compaction depth of influence, cohesionless soilsD = 0.5√(Wh), W in metric tons, h in meters; worked example: 0.5√(20 × 10) ≈ 7 m
Dynamic compaction depth of influence, cohesive soilsD = √(Wh), W in metric tons, h in meters; worked example: √(16 × 9) = 12 m
Percent compaction and acceptance check (Soils and Foundations, Sec. 4-8)Percent compaction = in-place dry unit weight ÷ maximum laboratory dry unit weight; worked example: 111.4 ÷ 118.5 = 94.0% vs. 95% required (95% × 118.5 = 112.6 lb/ft³), so apply more compaction effort, possibly adjust moisture, and retest
Borrow volume needed for compacted fill (Soils and Foundations, Example 4-5)Borrow volume = (fill volume × fill dry unit weight) ÷ borrow in-situ dry unit weight; worked example: (10,000 yd³ × 115 lb/ft³) ÷ 95 lb/ft³ = 12,105 yd³
Liquidity indexLI = (w − PL)/(LL − PL); worked example: LL 50, PL 20, w 56 → PI = 30, LI = (56 − 20)/30 = 1.20
Loose cubic yards from bank cubic yardsLoose cu yd = bank cu yd × (1 + swell%); examples: 25.19 × 1.30 = 32.74; 23.70 × 1.25 = 29.63; 512.00 × 1.20 = 614.40; 388.89 × 1.20 = 466.67; 456.00 × 1.20 = 547.20
Extra loose yards when swell increases by 10 percentage pointsAdditional loose cu yd = bank cu yd × 0.10; examples: 25.19 × 0.10 = 2.52; 23.70 × 0.10 = 2.37; 512.00 × 0.10 = 51.20; 388.89 × 0.10 = 38.89; 456.00 × 0.10 = 45.60
Number of haul-off truck loadsLoads = loose cu yd ÷ truck capacity, always rounded up (never divide bank volume); examples: 32.74 ÷ 12 = 2.73 → 3; 29.63 ÷ 14 = 2.12 → 3; 614.40 ÷ 10 = 61.44 → 62; 466.67 ÷ 12 = 38.89 → 39; 547.20 ÷ 14 = 39.09 → 40
Trench excavation length and bank volume (perimeter trench)Trench length = outside perimeter = 2 × (L + W); bank cu yd = length × width × depth ÷ 27; examples: 2 × (40 + 28) = 136 ft × 2.5 × 2 = 680 cu ft ÷ 27 = 25.19 cu yd; 2 × (40 + 24) = 128 ft × 2.5 × 2 = 640 cu ft ÷ 27 = 23.70 cu yd
Basement excavation footprint and bank volumeFootprint = (L + 2 × offset) × (W + 2 × offset); bank cu yd = footprint × depth ÷ 27; examples: 48 × 32 = 1,536 sq ft × 9 ft = 13,824 ÷ 27 = 512.00 cu yd; 50 × 30 = 1,500 sq ft × 7 ft = 10,500 ÷ 27 = 388.89 cu yd; 38 × 36 = 1,368 sq ft × 9 ft = 12,312 ÷ 27 = 456.00 cu yd