Alabama State Portion 30 questions
Key Distinctions
Standard Proctor uses a 5.5-lb hammer dropped 12 in. and delivers about 12,400 ft-lb/ft³, while Modified Proctor uses a 10-lb hammer dropped 18 in. in five layers delivering about 56,000 ft-lb/ft³ for the higher dry unit weights needed on airfield subgrades, embankments and heavily loaded fills.
Soils and Foundations, Section 4-2 (Pages 86-88)Cohesionless (sand) deposits use D = 0.5√(Wh), while cohesive (clayey) deposits use D = √(Wh), with W in metric tons and h in meters.
Soils and Foundations, Section 4-6 (Pages 99-100)Bank yards are the in-place excavated volume, while loose yards are the swelled volume (bank × (1 + swell)) and are the figure used to count haul-off truck loads.
Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)Pavement temperature must be above 40 °F (4 °C) for a preformed joint seal, but above 50 °F (10 °C) for poured joint sealing material.
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-605 Joint Sealing Filler, Page 346 (paragraph 605-3.1)AASHTO calls a soil granular when 35% or less passes the No. 200 sieve and silt-clay when more than 35% passes, while the Unified System calls a soil coarse-grained when more than 50% is retained on the No. 200 sieve (so 45% passing is silt-clay under AASHTO but coarse-grained under USCS).
Soils and Foundations, Pages 20-26 (Section 2-4, Soil Classification Systems; Tables 2-4 and 2-6)Liquid limit is the water content at which the standard groove closes 1/2 in. (12.7 mm) along the bottom at exactly 25 blows of the Casagrande cup, while plastic limit is the water content at which a rolled thread begins to crumble at a 1/8-in. diameter.
Soils and Foundations, Pages 17-18 (Section 2-3, Soil Consistency—Atterberg Limits)Boulders containing a volume of more than 1/2 cubic yard (0.4 m³) are classified as rock excavation; smaller boulders remain in the unclassified excavation pay item.
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-152, Page 83Section 50-03 sets an order of precedence with technical specifications over general provisions, plans, cited standards and cited ACs, but where a Special Provisions paragraph conflicts with the General Provisions or Technical Specifications, the Special Provisions govern.
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Section 50-03 (Page 20)Cracks wider than 1/4 in must be cleaned with compressed air and sealed with a compatible crack sealer, while the 3/4 in value is the threshold above which cracks should be pre-filled and sealed with the slurry mixture itself.
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-626 Emulsified Asphalt Slurry Seal Surface Treatment, Page 392 (paragraph 626-4.4)Successive lifts must be placed and compacted so the required total CTB depth is completed within 12 hours of the first lift, whereas all placement, compaction and finishing operations must be completed within 2 hours from the start of mixing.
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-304 Cement-Treated Base Course, Page 188 (paragraph 304-5.6)Isolated high points may be ground off if course thickness still complies with the plans, but grinding is limited to 15 sq yd; areas in excess of 15 sq yd require removal to the depth of the final course and replacement with new material (skin patching is not permitted).
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-401 Plant Mix Bituminous Pavements, Page 231 (paragraph 401-5.2b(5))If an oven is used to dry a field sample before a laboratory compaction test, its temperature should not exceed 60 °C (140 °F), whereas 110 °C (230 °F) is the standard oven temperature for moisture-content determinations.
Soils and Foundations, Section 4-2 (Page 86)Control work for areas outside the construction limits — borrow and waste areas, haul roads, equipment and material storage sites and temporary plant sites — is not measured or paid directly but is a subsidiary obligation with costs included in the contract prices bid for the related items.
Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-156, Page 111Key Terms
Formulas to Know
q = k·h·N_f/N_d, where N_f = number of flow channels and N_d = number of equipotential drops; worked example: (2.0 × 10⁻⁴ ft/s)(10 ft)(4)/(8) = 1.0 × 10⁻³ ft³/s per foot of wallD = 0.5√(Wh), W in metric tons, h in meters; worked example: 0.5√(20 × 10) ≈ 7 mD = √(Wh), W in metric tons, h in meters; worked example: √(16 × 9) = 12 mPercent compaction = in-place dry unit weight ÷ maximum laboratory dry unit weight; worked example: 111.4 ÷ 118.5 = 94.0% vs. 95% required (95% × 118.5 = 112.6 lb/ft³), so apply more compaction effort, possibly adjust moisture, and retestBorrow volume = (fill volume × fill dry unit weight) ÷ borrow in-situ dry unit weight; worked example: (10,000 yd³ × 115 lb/ft³) ÷ 95 lb/ft³ = 12,105 yd³LI = (w − PL)/(LL − PL); worked example: LL 50, PL 20, w 56 → PI = 30, LI = (56 − 20)/30 = 1.20Loose cu yd = bank cu yd × (1 + swell%); examples: 25.19 × 1.30 = 32.74; 23.70 × 1.25 = 29.63; 512.00 × 1.20 = 614.40; 388.89 × 1.20 = 466.67; 456.00 × 1.20 = 547.20Additional loose cu yd = bank cu yd × 0.10; examples: 25.19 × 0.10 = 2.52; 23.70 × 0.10 = 2.37; 512.00 × 0.10 = 51.20; 388.89 × 0.10 = 38.89; 456.00 × 0.10 = 45.60Loads = loose cu yd ÷ truck capacity, always rounded up (never divide bank volume); examples: 32.74 ÷ 12 = 2.73 → 3; 29.63 ÷ 14 = 2.12 → 3; 614.40 ÷ 10 = 61.44 → 62; 466.67 ÷ 12 = 38.89 → 39; 547.20 ÷ 14 = 39.09 → 40Trench length = outside perimeter = 2 × (L + W); bank cu yd = length × width × depth ÷ 27; examples: 2 × (40 + 28) = 136 ft × 2.5 × 2 = 680 cu ft ÷ 27 = 25.19 cu yd; 2 × (40 + 24) = 128 ft × 2.5 × 2 = 640 cu ft ÷ 27 = 23.70 cu ydFootprint = (L + 2 × offset) × (W + 2 × offset); bank cu yd = footprint × depth ÷ 27; examples: 48 × 32 = 1,536 sq ft × 9 ft = 13,824 ÷ 27 = 512.00 cu yd; 50 × 30 = 1,500 sq ft × 7 ft = 10,500 ÷ 27 = 388.89 cu yd; 38 × 36 = 1,368 sq ft × 9 ft = 12,312 ÷ 27 = 456.00 cu yd