Alabama Runway Contractor Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 30 questions (same as real exam)
- 75 minute time limit
- 4 topic areas covered
- 182 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Alabama Runway Contractor Practice Exam Guide
What's on the exam
Questions per topic, out of 30This practice exam follows the official content outline for the Alabama Runway Contractor exam: Sitework, Runways, FAA Regulations, Lighting.
You can practice two ways. The free practice exam gives you 10 questions per attempt, and you can retake it whenever you like. The full practice exam gives you 30 questions on a 75 minutes clock, with a new draw from our question bank each attempt.
Sitework 10 items
Our study plan for this topic: Excavation classification and embankment construction (FAA P-152); Soil compaction methods, equipment, and field density testing; Subgrade stabilization using lime, flyash, and cement kiln dust treatment; Airport drainage systems: storm drains, culverts, underdrains, and drainage structures; Clearing and grubbing operations and disposal of unsuitable materials; Turfing operations: seeding, sodding, sprigging, topsoiling, and mulching; Temporary erosion, siltation, and pollution control measures; Airport perimeter and security fencing types and installation requirements.
Runways 15 items
Our study plan for this topic: Portland cement concrete pavement mix design and proportioning requirements; Flexible pavement (plant mix bituminous) mix design and job mix formula; Subbase and base course materials, gradation, and compaction requirements; Pavement surface treatments and seal coats; Concrete and asphalt pavement joint sealing and crack repair; Runway and taxiway surface marking materials and application; Saw-cut groove dimensions, tolerances, and skid resistance; Pavement surface preparation and overlay procedures.
FAA Regulations 3 items
Our study plan for this topic: Contract definitions and terminology (AC 150/5370-10F key terms); Bidding, proposal requirements, and contractor prequalification; Contract award, execution, and bonding requirements; Engineer authority, inspection rights, and work acceptance; Legal compliance, permits, licenses, and contractor liability; Airport operational safety during construction (AOA limitations and barricades); Contractor Quality Control Program requirements; Measurement, payment methods, and liquidated damages for contract time overruns.
Lighting 2 items
Our study plan for this topic: Airport rotating beacon installation, leveling, and beam adjustment; Hazard beacon installation, flasher mechanisms, and photoelectric controls; Airport beacon tower erection, lightning protection, and grounding; Wind cone assembly installation, electrical connection, and grounding; Airport obstruction light installation on poles, towers, and structures; Underground power cable installation, splicing methods, and cable testing requirements; Airport transformer vault construction and electrical equipment installation; Underground electrical duct banks, conduit types, and manhole/junction structure installation.
Sample 1 — Runways
Question: You are the paving contractor on a new Portland cement concrete runway. The contract specifies a 28-day flexural strength of 650 psi, and each lot of in-place pavement is accepted on the basis of percentage of material within limits (PWL). When the Engineer computes the PWL for flexural strength on a lot, what lower specification tolerance limit (L) applies?
- A. 585.0 psi
- B. 617.5 psi
- C. 650.0 psi
- D. 604.5 psi
Correct Answer: D
Per FAA AC 150/5370-10F, Item P-501, paragraph 501-5.2d, the lower specification tolerance limit (L) for flexural strength is 0.93 times the strength specified in paragraph 501-3.1. For a specified 650 psi: 0.93 x 650 = 604.5 psi. (The companion limit for thickness is the lot plan thickness minus 0.50 in.) Option C is the specified design strength itself, not the lower tolerance limit; options A and B correspond to incorrect factors of 0.90 and 0.95.
Reference: Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Item P-501 Portland Cement Concrete Pavement, Page 315 (paragraph 501-5.2d)
Sample 2 — Sitework
Question: A sieve analysis of a borrow soil shows that 45% of the sample passes the No. 200 sieve. Under the two soil classification systems widely used in engineering practice, how is this soil categorized?
- A. Granular material under AASHTO; coarse-grained under the Unified System
- B. Silt-clay material under AASHTO; coarse-grained under the Unified System
- C. Granular material under AASHTO; fine-grained under the Unified System
- D. Silt-clay material under AASHTO; fine-grained under the Unified System
Correct Answer: B
Per Soils and Foundations, Section 2-4, the AASHTO system calls a soil granular when 35% or less passes the 0.075-mm (No. 200) sieve and silt-clay when more than 35% passes; 45% passing therefore makes it a silt-clay material. The Unified Soil Classification System calls a soil coarse-grained when more than 50% is retained on the No. 200 sieve; with 45% passing, 55% is retained, so it is coarse-grained. This illustrates the text's point that boundaries between soil types are somewhat arbitrary and vary between systems.
Reference: Soils and Foundations, Pages 20-26 (Section 2-4, Soil Classification Systems; Tables 2-4 and 2-6)
Sample 3 — FAA Regulations
Question: You are the prime contractor on an airfield grading project where contract time is measured in working days, and your normal work force on the principal item of work is operating on a double shift. Severe weather halts progress on that principal item. For the day to go uncharged against contract time, your force must have been unable to proceed with the principal item for at least how many hours?
- A. 8 hours
- B. 12 hours
- C. 18 hours
- D. 6 hours
Correct Answer: B
Per AC 150/5370-10F, paragraph 80-07a(1), no time is charged for days the Contractor cannot proceed with the principal item for at least 6 hours with the normal work force; if the normal work force is on a double shift, 12 hours is used, and 18 hours applies to a triple shift. With a double-shift force, the threshold is 12 hours.
Reference: Airport Construction Standards FAA Advisory Circular AC 150/5370-10, Section 80-07 (Page 45)
Your first attempt tells you where you're starting from. After every attempt, the results page shows your score for each outline topic, so you can see what to study next. Compare your score with the real exam's passing score, 70% correct, and keep going until you pass consistently.
- Answer the questions you know first, and bookmark the rest. Our practice exams let you bookmark and come back.
- Return to your bookmarks on the second pass.
- Keep a steady pace. The real exam works out to about 1 minute 52 seconds per question.
- After each attempt, look up each missed question's reference and read the section.
| Questions | 30 scored questions plus up to 10 unscored experimental questions that count against your time |
| Time limit | 75 minutes |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | $96 |
- Results are given immediately on screen and emailed, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
- You may take the examination an unlimited number of times during the 1-year period, paying the fee for each registration.
Source: State of Alabama General Contractors Candidate Information Bulletin, Updated 1/23/26. Check the bulletin before test day: fees and rules can change.