Exam Cheat Sheet · Quick Reference
Arkansas Concrete - Residential Exam
Arkansas · PSI Services Contractor
Arkansas State Portion 30 questions
Key Distinctions
Plan view is a bird's-eye overhead view showing the layout of the work area, while profile view is a horizontal cut-away (cross-section) along the alignment showing elevations, grades, and depths.
Pipe and Excavation Contracting, Page 105, Chapter 3 introduction, plan view/profile view definitionsSlipforms place concrete by extrusion as the forms are pulled or jacked vertically or horizontally slowly enough for the concrete to gain strength and hold its shape, while jump forms are stripped and re-set ("jumped") to the next level.
Contractor's Guide to Quality Concrete Construction (4th ed.), Chapter 5 — Types of Forms sectionA payment bond guarantees all bills for labor, equipment, and materials are paid and liens discharged; a performance bond guarantees completion of the work.
Pipe and Excavation Contracting, Page 47Form ties use a usual 2:1 safety factor (working load limited to one-half ultimate tensile strength), while form anchors require a minimum safety factor of 3 including live loads and impact because the concrete they are embedded in is often still green.
Contractor's Guide to Quality Concrete Construction (4th ed.), Page 66For short haul distances from cut to fill, dozers are recommended; longer hauls use self-loading scrapers and long-distance hauling requires loaders and trucks (graders are used for very slight cuts and fills).
Pipe and Excavation Contracting, Pages 270-271A wheeled backhoe has a minimum effective digging cycle of about 10 seconds, while a small ¾-yard trackhoe is about 15 seconds and larger track excavators take 30 to 40 seconds per cycle; in the text's 1,230-ft job example the track excavator produced 50 LCY/hr versus 29 LCY/hr for the backhoe but its mobilization (about 10 percent of total job cost) made it unattractive.
Pipe and Excavation Contracting, Page 168Calcium chloride is an effective set accelerator but accelerates corrosion of reinforcing steel (and is not an effective antifreeze, lowering the freezing point only a few degrees), so non-chloride accelerators are more appropriate for steel-reinforced concrete.
Design and Control of Concrete Mixtures, 17th ed., Chapter 6 - Chemical Admixtures for Concrete, Page 129 (16th ed.: Pages 222-223)A competent person can identify existing and predictable hazards and is authorized to take prompt corrective measures (and must make the frequent and regular job site inspections), while §1926.20(b)(4) separately requires that only employees qualified by training or experience be permitted to operate equipment and machinery.
OSHA 1926 CFR 29, §1926.32(f), Page 31Under §1926.35(e)(3), an employer with 10 or fewer employees may communicate the emergency action plan orally and need not maintain a written plan.
OSHA 1926 CFR 29, §1926.35(e)(3)Per §1926.95(d)(2), the employer is not required to pay for non-specialty safety-toe protective footwear (steel-toe shoes/boots) or non-specialty prescription safety eyewear provided the employer permits those items to be worn off the job site.
29 CFR 1926, Subpart E, §1926.95(d)(2)F3 (freezing-and-thawing with frequent water exposure plus deicing chemicals) allows a maximum w/cm of 0.40 with minimum 5000 psi, while W1 allows a maximum w/cm of 0.50 with minimum 4000 psi.
Contractor's Guide to Quality Concrete Construction (4th ed.), Page 24 (Table 2.5)S2 is a concrete mixture requirement for dissolved sulfate between 1500 and 10,000 ppm (max w/cm 0.45, min 4500 psi), while expansive soil is a site/soil classification where a Plasticity Index of 15 or greater (ASTM D 4318) is one of four defining provisions.
Contractor's Guide to Quality Concrete Construction (4th ed.), Page 24 (Table 2.5)Utility site plans use two scales; usually the horizontal scale is ten times the vertical, but in the text's example 1 in = 40 ft horizontal and 1 in = 10 ft vertical gives a 4:1 ratio.
Pipe and Excavation Contracting, Page 109Key Terms
Formulas to Know
Trench length (ft) × trench width (ft) × bedding depth (ft) ÷ 27 (27 cubic feet per cubic yard)Length (ft) × width (ft) ÷ 9 sq ft per sq yd; example: 250 ft × 15 ft = 3,750 sq ft ÷ 9 ≈ 416 sq ydAverage the cut or fill depths at the prism's four corners, then multiply by the base area; example Prism D: (2.3 + 0.9 + 0.8 + 2.3) averaged = 1.58 ft × 2,500 SF = 3,950 cubic feetDistance (ft) = (number left of the plus sign × 100) + number right of the plus sign; example Sta 2 + 50 = 250 ftHorizontal scale ÷ vertical scale; example 1 in = 40 ft horizontal and 1 in = 10 ft vertical gives 4 to 1 (text notes the horizontal scale is usually ten times the vertical)Spacing in feet = 2-1/2 × slab thickness in inches; example: 6 in. slab → 2-1/2 × 6 = 15 ftCamber 1/4 inch per 10 feet (6 mm per 3 m) of spanWorking load of new ties limited to one-half the ultimate tensile strength (usual 2:1 safety factor); form anchors use a minimum safety factor of 3 including live load and impactMinimum single test = specified f'c − 500 psi; example: 4000 − 500 = 3500 psi, so a 3600 psi test is acceptable and any test below 3500 psi requires an investigation of structural adequacyNot more than one-third the slab depth and not more than one-fifth the narrowest dimension of a vertical member; example: 4 in. slab ÷ 3 ≈ 1-1/3 in. governs over 12 in. ÷ 5 = 2.4 in.Use approximately 150 lb/ft³ (2400 kg/m³) for normalweight concrete