Exam Cheat Sheet · Quick Reference
California General Building (B) Contractor Exam
California · PSI Services Contractor
California State Portion 115 questions
Key Distinctions
Slope is the rise over the run (6" in 12" = 1/2), while pitch is the rise divided by the span, which is twice the run (6/24 = 1/4).
Modern Carpentry, 14th Ed., Ch. 12 (Roof Framing), Section 12.3 — Slope and PitchNails driven perpendicular to the fibers (side grain) develop allowable lateral (shear) loads 50% higher than the same nails driven into end grain, and an end-nailed joint should never be loaded in direct withdrawal.
Olin's Construction, 9th Ed., Section 6.6.2 (Nailing Practices)The builder's level telescope is fixed in the horizontal plane, while the transit telescope can be pivoted up and down 45° in each direction so vertical angles can be measured — preferred on sloping sites with stakes at varying heights.
Modern Carpentry, 14th Edition, Chapter 8, Leveling InstrumentsPlain grout (cement with additives for smooth consistency) is used for ceramic floor tile joints less than 1/16" wide; where joints exceed 1/16", sand is added to form sanded grout, which resists shrinkage in the wider joint.
Modern Carpentry, 14th Ed., Ch. 20, Installing Tile—GroutHoned tiles may be laid with narrow 1/8 in. joints and grouted with neat cement, while the irregular surface of textured tiles requires joints of at least 1/4 in., grouted 1 part cement to 3 parts sand.
Olin's Construction, 9th Ed., Section 9.9.2.6 (Installation)ANSI A108.1 is the Thick Bed Mortar Method (full portland cement mortar setting bed) and ANSI A108.4 is the Thin Bed Mortar Method (thin-set).
Olin's Construction, 9th Ed., Section 9.9.2.3 (Applicable Standards)Thermoplastics soften with heat so field seams can be heat or solvent welded as strong as the sheet, whereas thermosetting membranes cannot be softened by heat and are seamed with liquid adhesives or pressure-sensitive tapes.
Fundamentals of Building Construction: Materials and Methods, 6th Edition, Chapter 16 — Single-Ply Roof MembranesBlast furnace slag is a hydraulic cement that reacts directly with water like portland cement, while pozzolans must react with the calcium hydroxide present in the wet concrete to form cementing compounds.
Fundamentals of Building Construction: Materials and Methods, 6th Edition, Chapter 13 — Supplementary Cementitious MaterialsAll LVL veneers run lengthwise with grain in the same direction (parallel lamination for beam, header and truss loads), while plywood places each veneer at 90° to the previous one.
Modern Carpentry, 14th Ed., Ch. 3 (Building Materials), Section 3.10 — Laminated-Veneer LumberBid security guarantees the bidder will sign an agreement based on the submitted bid or forfeit the bond amount; the performance bond secures completion of the signed contract and the payment bond secures payment of the constructor's related debts.
Olin's Construction: Principles, Materials, and Methods, 9th Ed., Section 1.7.2.1A GFCI compares hot-leg and neutral current and trips on an imbalance as small as 4 milliamps (as fast as 1/30 second) to protect against electric shock, while breakers and fuses protect against fires.
Modern Carpentry, 14th Edition, Section 31.2, Electrical System ComponentsUnder CPC 1004.1 drum and bottle traps are not outright prohibited but shall be installed only for special conditions, while "S" traps, bell traps and crown-vented traps are prohibited.
2025 California Plumbing Code, Section 1004.1Key Terms
Formulas to Know
Pitch = rise ÷ span, where span = 2 × run; example: 6" rise per 12" run → 6/24 = 1/4 pitch (rise/run of 1/2 is the slope, not the pitch)Bd ft = (No. pcs × T × W × L) ÷ 12 using nominal thickness/width in inches and length in feet; example: (15 × 2 × 10 × 12) ÷ 12 = 300 bd ftCu yd = (length × width × thickness in feet) ÷ 27, then × waste factor; example: 27' × 30' = 810 sq ft × 1/3 ft (4") = 270 cu ft ÷ 27 = 10 cu yd × 1.10 = 11 cu ydArea = π × radius² (use radius, not diameter); cylinder volume = area of face × height, then ÷ 27 for cubic yards; examples: 3.1416 × 6' × 6' = 113.1 sq ft; 3.1416 × 0.5' × 0.5' × 4' = 3.14 cu ft each, ×10 = 31.4 cu ft ÷ 27 ≈ 1.2 cu ydU = 1 ÷ total R (sum of all layers and air films); example: total R 14.43 → U = 0.07Difference in grade = (sum of plus/backsight readings) − (sum of minus/foresight readings); example: (5'-8" + 6'-0") − (2'-6" + 2'-4") = 11'-8" − 4'-10" = 6'-10"Multiply building length by the spacing factor (3/4 for 16" OC, 3/5 for 20" OC, 1/2 for 24" OC), round up and add one for one side, then double for both sides; example at 16" OC: 36 × 3/4 = 27 → 28 → 28 × 2 = 56 raftersThickness ≈ 1 1/2 × distance from face of column to edge of footing; example: (30" − 6") ÷ 2 = 12"; 1.5 × 12" = 18"Spacing in feet should not exceed 1.0 × posted speed in mph for taper channelization and 2.0 × posted speed for tangent channelization; example at 40 mph: 40 ft taper, 80 ft tangenta² + b² = c²; example: 24² + 32² = 1,600, √1,600 = 40'-0" diagonal (a 3-4-5 multiple)