Key Distinctions
A penthouse used only to shelter mechanical or electrical equipment, tanks or vertical shaft openings in the roof assembly is counted as part of the story below the roof deck, while a penthouse or bulkhead used for any other purpose (e.g., janitorial storage) is counted as an additional story of the building.
IBC 2015 Chapter 15 — Sections 1510.2 and 1510.2.3Per IRC 2015 R202, a metal roof panel is an interlocking metal sheet with an installed weather exposure of not less than 3 square feet per sheet, while a metal roof shingle has an installed weather exposure of less than 3 square feet per sheet.
IRC 2015 Section R202 (METAL ROOF PANEL; METAL ROOF SHINGLE)Overflow scuppers must be not less than three times the size of the roof drains (minimum 4-inch opening height, inlet flow line 2 inches above the roof low point), whereas overflow drains are permitted to be the same size as the roof drains.
IRC 2015 Section R903.4.1Metal roof shingle valley flashing extends at least 8 inches from the centerline each way with a splash diverter rib not less than 3/4 inch high at the flow line; tile and wood shingle/shake valley flashing extends not less than 11 inches each way with a rib not less than 1 inch high.
IBC 2015 Chapter 15 — Section 1507.5.7 FlashingA recover leaves the existing covering in place and is not permitted where the existing roof has two or more applications of any type of roof covering (only one application may remain), while a roof replacement includes removal of all existing layers of roof covering down to the roof deck, excepting an ice barrier membrane adhered to the deck that may remain and be covered with an additional layer of ice barrier membrane.
IBC 2015 Section 1511.3.1.1Coal-tar built-up roofs are permitted a design slope of not less than 1/8 unit vertical in 12 units horizontal, while built-up (other than coal tar), modified bitumen, thermoplastic single-ply and sprayed polyurethane foam roofs require not less than 1/4 unit vertical in 12 units horizontal.
IBC 2015 Chapter 15 — Section 1507.10.1 SlopeAggregate surfacing materials shall not be reinstalled regardless of condition, while existing slate, clay or cement tile may be reinstalled except for damaged, cracked or broken units.
IRC 2015 Section R908.5Under the residential code the building official may grant one or more extensions of the 180-day abandonment period for additional periods not exceeding 180 days each (written request, justifiable cause), whereas the commercial code limits each such extension to 90 days.
IRC 2015 Section R105.3.2Asphalt shingles are required to be tested to ASTM D7158 and labeled for the required classification; shingles not included within the scope of ASTM D7158 must instead be tested and labeled for compliance with ASTM D3161 and the required classification.
IBC 2015 Chapter 15 — Section 1504.1.1 Wind Resistance of Asphalt ShinglesPer IBC 1507.2.9.3, underlayment is installed over the drip edge along eaves, while the drip edge is installed over the underlayment along rakes (laps 2 inches, fastened at a maximum of 12 inches on center).
IBC 2015 Chapter 15 — Section 1507.2.9.3 Drip EdgeOnly the photovoltaic panel system definition expressly includes rack support systems; a BIPV product functions as a component of the building envelope, a photovoltaic panel is a collection of modules mechanically fastened together and wired as a field-installable unit, and a photovoltaic module is the complete environmentally protected unit of solar cells and optics, exclusive of a tracker.
IBC 2015 Section 202 (PHOTOVOLTAIC PANEL SYSTEM) and Section 1502.1The commercial code permits above-deck insulation covered with an approved roof covering that passes the tests of NFPA 276 or UL 1256 when tested as an assembly, while the residential code permits it where covered with an approved roof covering and complying with FM 4450 or UL 1256.
IBC 2015 Chapter 15 — Section 1508.1 Roof Insulation, GeneralKey Terms
Formulas to Know
Scupper opening size = not less than 3 × size of the roof drains; minimum opening height 4 inches; inlet flow line located 2 inches above the low point of the roof served (overflow drains, by contrast, may be the same size as the roof drains)Lower edge of each 18-inch-wide No. 30 (minimum) felt strip is placed above the butt end of the shake it covers a distance equal to 2 × the weather exposure, so no felt is exposed to the weatherWork is a substantial improvement when value of proposed work ≥ 50% of the market value of the building before the damage occurred or before the improvement is started; for damaged buildings the value of proposed work includes the cost to repair the building to its predamaged conditionBase area shall not exceed one-third the area of the supporting roof deck; on roofs more than 50 feet above grade plane, noncombustible construction is required where base area is greater than 250 square feet or height above the roof deck is greater than 15 feetNot less than 4 fasteners per strip shingle or 2 per individual shingle; where roof slope exceeds 21 units vertical in 12 units horizontal (175-percent slope), install as required by the manufacturerCorrosion-resistant fasteners not less than 11 gage with a 5/16-inch head, of sufficient length to penetrate the deck a minimum of 3/4 inch or through the thickness of the deck, whichever is lessGalvanized steel, stainless steel, aluminum or copper roofing nails, minimum 12-gage (0.105 inch) shank with minimum 3/8-inch-diameter head, length sufficient to penetrate not less than 3/4 inch into the roof sheathingWhere V(asd) ≥ 120 mph: cap-nail grid pattern of 12 inches between side laps with 6-inch spacing at the side laps, all laps a minimum of 4 inches (the lower tier, V(asd) greater than 110 mph, is fastening along the overlap at not more than 36 inches on center)Apply liquid-applied protective coating not less than 2 hours nor more than 72 hours following application of the foamNo. 1 cedar or redwood shakes and No. 1 shingles installed per Section 1505.7 permitted on buildings not more than two stories above grade plane with not more than 6,000 sq ft projected roof area, where fire-separation distance from the leading edge of the roof to the lot line is a minimum of 10 feet on all sides except street fronts or public ways (footnote b's 6 feet applies to nonclassified coverings on Group R-3 and U buildings)