Metal roof shingle valley flashing extends not less than 8 inches from the centerline each way with a splash diverter rib not less than 3/4 inch high, while clay/concrete tile and wood shake valley flashing extends 11 inches each way, tile requiring a splash diverter rib not less than 1 inch high.
IBC 2018 Page 350Slate valley flashing must be sheet metal not less than 15 inches wide (minimum 0.0179-inch uncoated zinc-coated G90), while an exposed open-valley metal lining on asphalt shingles must be not less than 24 inches wide of a corrosion-resistant metal from Table 1507.2.8.2.
IBC 2018 Page 351Asphalt shingle nails are minimum 12-gage (0.105-inch) shank with a minimum 3/8-inch-diameter head penetrating not less than 3/4 inch into sheathing, while tile fasteners are corrosion resistant, not less than 11 gage with a 5/16-inch head, long enough to penetrate the deck 3/4 inch or through the deck thickness, whichever is less.
IBC 2018 Section 1507.2.5Per IBC 1507.2.8.3, underlayment is installed over the drip edge along eaves, but the drip edge is installed over the underlayment along rake edges.
IBC 2018 Page 347Per IBC 1507.4.2, panels without applied lap sealant require a minimum 3:12 slope, with applied lap sealant the minimum is 1/2:12, and standing-seam metal panel systems may go as low as 1/4:12.
IBC 2018 Page 348Built-up roofs require a design slope of not less than 1/4 unit vertical in 12 units horizontal for drainage, except coal-tar built-up roofs, which are permitted a minimum design slope of 1/8:12 (1-percent).
IBC 2018 Page 353Wood shakes require interlayment complying with ASTM D226, Type I, while Table 1507.8 lists 'No requirements' for interlayment under wood shingles; two fasteners per unit, solid sheathing in icing areas, and bundle labeling apply to both.
IBC 2018 Pages 352 to 353Per IBC 1507.9.8, spacing between shakes in the same course is 3/8 to 5/8 inch for shakes and taper sawn shakes of naturally durable wood, but 1/4 to 3/8 inch for preservative-treated taper sawn shakes.
IBC 2018 Page 353Photovoltaic shingles must be listed and labeled in accordance with UL 1703 (IBC 1507.17.6), while rooftop rack-mounted photovoltaic panel systems must be tested, listed and identified with a fire classification in accordance with UL 1703 and UL 2703 (IBC 1505.9).
IBC 2018 Sections 1507.17.2 and 1507.17.6ES-1 Test Methods RE-1, RE-2 and RE-3 apply to metal edge securement, except gutters, on low-slope built-up, modified bitumen and single-ply roof systems, while RP-4 is the design standard for ballasted low-slope single-ply systems.
IBC 2018 Pages 342 to 343Penthouses on Type I construction are not limited in height, while those on other construction types are limited to 18 feet above the roof deck, with an exception permitting a maximum of 28 feet where the penthouse encloses tanks or elevators that travel to the roof level.
IBC 2018 Page 356Existing slate, clay or cement tile may be reinstalled if not damaged, cracked or broken, and vent flashing, metal edgings, drain outlets, collars and metal counterflashings may be reinstalled unless rusted, damaged or deteriorated, but aggregate surfacing materials shall not be reinstalled under any condition.
IBC 2018 Section 1511.5The building official is appointed by the chief appointing authority of the jurisdiction, while the building official appoints deputy building officials, technical officers, inspectors, plan examiners and other employees with the concurrence of the appointing authority.
IBC 2018 Section 103.3 (with Section 103.2)Key Terms
Formulas to Know
Use the minimum number of fasteners required by the manufacturer, but not fewer than 4 fasteners per strip shingle (or 2 per individual shingle); where the roof slope exceeds 21:12, install shingles as required by the manufacturer.Total area = projected roof area + 1/2 × (vertical wall height × vertical wall length) for any wall that diverts rainwater onto the roof.Wall = 30 × 40 = 1,200 sq ft; one-half = 600 sq ft; 4,000 + 600 = 4,600 sq ft used for sizing.Roof = 40 × 60 = 2,400 sq ft; wall = 60 × 30 = 1,800 sq ft, one-half = 900 sq ft; 2,400 + 900 = 3,300 sq ft used for sizing.Asphalt shingles permitted on slopes 2:12 or greater; for slopes from 2:12 up to 4:12 apply double (two-layer) underlayment — 19-inch starter strip at the eave, then 36-inch sheets overlapped 19 inches; single layer at 4:12 and steeper.Asphalt shingles 2:12 (IBC 1507.2.2); photovoltaic shingles 2:12 (1507.17.2); clay/concrete tile 2 1/2:12 (1507.3.2, double underlayment from 2 1/2:12 up to 4:12); metal roof shingles 3:12 (1507.5.2); wood shingles 3:12 (1507.8.2); slate shingles 4:12 (1507.7.2).Apply the liquid-applied protective coating complying with Table 1507.14.3 not less than 2 hours nor more than 72 hours following application of the sprayed polyurethane foam.Mechanically fasten drip edges at intervals not greater than 12 inches on center, lap adjacent segments not less than 2 inches, with a vertical leg not less than 1 1/2 inches.Where Vasd is greater than 110 mph, fasten underlayment along the overlap at not more than 36 inches on center; where Vasd is not less than 120 mph, underlayment must also comply with ASTM D226 Type III, ASTM D4869 Type IV or ASTM D6757 and be attached in a 12-inch grid pattern between side laps with 6-inch spacing at the side laps.Where the average daily January temperature is 25°F (-4°C) or less, or ice may form along eaves causing water backup: install solid sheathing instead of spaced sheathing for wood shakes and shingles (1507.9.1.1, 1507.8.1.1); for clay/concrete tile, solidly cement the metal valley flashing underlayment to the roofing underlayment on slopes under 7:12, or install a self-adhering polymer-modified bitumen sheet (1507.3.9, which also uses a 3:12 threshold for 36-inch-wide valley underlayment).