Exam Cheat Sheet · Quick Reference

Louisiana Earthwork, Drainage and Levees

Louisiana  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
30
Passing score
70%
Exam time
75 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Louisiana State Portion 30 questions

Earthwork/Surveying 8 Q · 27%
Reading and interpreting plan views and profile views for underground utility workSurveying instruments and measurement techniques (optical level, transit, grade rod, GPS)Establishing line and grade using hubs, reference stakes, batter boards, and laser systemsStation numbers, elevations, cuts, fills, and engineer's decimal measurementsContour maps, contour intervals, and estimating cut and fill volumes using cross-section and average end area methodsSoil compaction methods, Proctor tests, and field density testingSite preparation tasks including clearing, grubbing, utility location, and sediment controlDealing with rock types, rippability, and groundwater dewatering in excavation
Concrete 5 Q · 17%
Concrete mixture proportioning and water-cementitious materials ratioPortland cement types and supplementary cementitious materials (fly ash, slag cement, silica fume)Aggregates for concrete: classification, grading, and propertiesFresh concrete properties: workability, slump, air content, and bleedingConcrete durability: freeze-thaw resistance, sulfate attack, and permeabilityPlacing, finishing, and curing concreteChemical admixtures: types, functions, and effects on concrete propertiesHot and cold weather concreting precautions and requirements
Curbs and Gutters 5 Q · 17%
Gutter grade and cross-slope design standardsCurb opening inlet types, capacity, and placementGrate inlet types and debris blockage considerationsCombination curb-and-grate inlet applicationsAllowable pavement encroachment criteria by street classificationGutter flow capacity calculations using Manning's equationInlet location and spacing requirements at intersections and grade transitionsSpecial purpose inlet types including slotted drains and bicycle-safe grates
Culverts 3 Q · 10%
Culvert hydraulic design and flow control (inlet vs. outlet control)Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types)Structural loads on buried culverts (soil loads, Marston theory, trench vs. embankment conditions)Pipe bedding and backfill requirements for culvert installationOutlet protection and energy dissipation at culvert outlets (riprap aprons, scour hole design)Headwater and tailwater depth calculations for culvert sizingSuperimposed live loads on culverts (highway, railway loading)Culvert end structures and appurtenances (headwalls, wingwalls, energy-dissipating headwalls)
One Call 5 Q · 17%
Louisiana 811 notification requirements and legal obligationsTwo full business days advance notice ruleTolerance zone dimensions and hand-digging requirementsLocate request validity periods and renewal proceduresUnderground utility marking color codes and excavator white-marking responsibilitiesProcedures when a utility line is accidentally damagedPositive response requirements and unmarked facility follow-upCivil penalties for Dig Law violations
Heavy Equipment/Safety 4 Q · 13%
Excavation cave-in protective systems (sloping, benching, shoring, and trench shields)Pre-shift and periodic inspection requirements for heavy equipment and cranesRollover protective structures (ROPS) for earthmoving equipmentPower line safety and minimum clearance distances for equipment operationsPersonal protective equipment requirements for construction operationsMotor vehicle and earthmoving equipment operational safety requirementsCrane and derrick assembly, disassembly, and operator qualification requirementsSigns, signals, barricades, and flagging requirements for construction work zones

Key Distinctions

Standard Proctor (T-99, ASTM D 698)vsModified Proctor (T-180, ASTM D 1557)

Standard compacts the lab sample in three layers each struck 25 times with a 5.5-lb, 2-in. hammer (12,400 ft-lb), while modified uses five layers each struck 25 times with a 10-lb hammer (56,250 ft-lb per cubic foot) and is specified for high-design-load areas such as heavy-duty paving, concrete drives, federal highways and runways.

Pipe and Excavation Contracting, Pages 183 to 184
Swell factorvsLoad factor

A swell factor converts in-place (bank) volume to loose volume (e.g., 1.7 for broken asphalt/concrete slab), whereas a load factor converts loose cubic yards back to bank cubic yards and is computed as bank volume ÷ (bank volume + swell percentage).

Pipe and Excavation Contracting, Page 66
Bank cubic yards (BCY) / compacted cubic yards (CCY)vsLoose cubic yards (LCY)

Cut is measured in bank volume and fill in compacted volume, so both must be converted to the same state (loose) before subtracting — in the worked example 4,000 BCY × 1.32 = 5,280 LCY of cut vs. 4,000 CCY × 1.54 = 6,160 LCY of fill, giving 880 LCY of import.

Pipe and Excavation Contracting, Page 63
Struck bucket capacityvsHeaped bucket capacity

Depending on soil type, heaped capacity is usually about 130 percent of struck capacity (e.g., a 2-ft hoe bucket struck at 5 to 6 LCF heaps about 6.5 to 8 LCF).

Pipe and Excavation Contracting, Pages 142-143
Scrapers placing embankment fillvsTrucks placing embankment fill

A scraper can dump its payload in uniformly thick layers while trucks cannot, so scrapers improve compaction productivity through more consistent lift thickness.

Pipe and Excavation Contracting, Page 90
Grate inlet without a curb openingvsCombination inlet (grate plus curb opening)

A safety factor should be applied to theoretically computed grate inlet capacity especially when the inlet has no curb opening, because a grate alone is prone to debris blockage and loss of capacity.

Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 245
Oxygen enriched atmospherevsOxygen deficient atmosphere

Under the confined spaces standard, enriched means more than 23.5 percent oxygen by volume and deficient means less than 19.5 percent; either is a hazardous atmosphere.

29 CFR 1926, §1926.1202
Equipment in transit, no load and boom loweredvsEquipment working near energized lines

In transit with no load and boom lowered the clearances are 4 ft under 50 kV, 10 ft over 50 kV up to and including 345 kV, and 16 ft up to and including 750 kV; working clearance is instead computed under §1926.600(a)(6)(ii) as 10 ft plus 0.4 in. per kV over 50 kV.

OSHA 29 CFR 1926, §1926.600(a)(6)(iii)
Field-cured cylindersvsStandard-cured companion cylinders

Field-cured cylinders are cured alongside the structure to judge curing/protection adequacy, which is considered adequate if they average at least 85% of companion standard-cured strength at the age designated for f'c (or exceed f'c by more than 500 psi); the 75% criterion applies instead to the lowest individual drilled core.

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Undisturbed native soilvsSoil in an old, previously dug trench line

In certain soils, digging resistance is usually greater in undisturbed earth, so the old ditch digs easier; the grademan can also often spot the old line by darker spots of topsoil mixed in with lighter-colored subsoil.

Pipe and Excavation Contracting, Page 148
Light utility dozers (40 to 80 hp)vsMid-sized production dozers (80 to 200 hp)

Light utility dozers (blade capacity 1.25 to 2.25 cu yd) are listed for residential/commercial foundations, fine grading, trench backfill, landscaping, light logging and swamp dozing, while mid-sized production dozers list 'logging' and tree and stump removal.

Pipe & Excavation Contracting, Chapter 2 – Bulldozers
Hard-troweled (steel-troweled) finishvsFloat or broom finish

Concrete with more than 3% entrained air should not be given a hard-troweled finish (risk of delamination from trapped bleed water or air), which is why slabs at 6% or more air for exterior freeze-thaw exposure receive float or broom finishes.

Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330

Key Terms

Load factor Pipe and Excavation Contracting, Page 66
A conversion that changes loose cubic yards to bank cubic yards, calculated as bank volume divided by (bank volume plus swell percentage).
Swell factor for broken slab material Pipe and Excavation Contracting, Page 138
The contractor should always allow a factor of 1.7 from in-place (bank) volume to loose disturbed volume for asphalt and concrete slabs; 1.3 to 1.5 factors apply to soils such as loam.
Set (production trenching) Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
The length of trench a backhoe can excavate from one position.
Digging cycle Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
The repeating backhoe sequence listed in order as load bucket, lift load, swing and prepare to dump, dump bucket load, and return to dig.
Mobilization cost Pipe and Excavation Contracting, Page 60
A project cost that is sometimes itemized separately on the bid; if it is not, it must be included in the equipment cost calculations.
Trench box positioning Pipe and Excavation Contracting, Page 170
The bottom of the trench box should sit higher than the pipe — 2 to 3 feet higher is usually enough — because too low disturbs bedding and newly laid pipe when pulled, and more than 5 feet above the pipe leaves the ditch unsafe.
Cemented soil Pipe and Excavation Contracting, Page 171
A soil type that can be quite stable, but it is still wise to consider all trench walls over 5 feet high dangerous since any trench can collapse.
Disturbed earth Pipe and Excavation Contracting, Page 171
Earth made unstable by nearby activity, such as equipment digging another trench or vibratory compaction equipment, which can make a previously safe digging area unsafe.
Mixed/layered soil classification Pipe and Excavation Contracting, Page 171
Where a pocket of loose sand or heavy loam is found in otherwise stable cemented gravel, the changing conditions make the wall unsafe and the classification and protective measures must account for the weakest soil present.
Wet spoil on trench banks Pipe and Excavation Contracting, Page 164
Wet sandy spoil from the trench bottom piled on the banks drains quickly, and the water seeping into the bank lubricates the soil, possibly causing an otherwise stable bank to slip.
Soil dam technique (high groundwater) Pipe and Excavation Contracting, Page 165
The operator starts excavating some distance behind the end of the laid pipe, leaving a dam of unexcavated soil until last, to keep water, mud and sludge from flowing against and blocking the pipe.
Backfilling in lifts Pipe and Excavation Contracting, Page 87
Trenches are usually backfilled in lifts with each lift compacted — and often density tested — before the next lift is placed, which substantially reduces backfill production.
Cast-in-place cylinder (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
A cylinder mold filled during normal placement and left in the member to cure with it, then removed and tested; intended for concrete 5 in. to 12 in. (125 mm to 300 mm) in depth and particularly applicable to cold-weather concreting, post-tensioning and slabs where a minimum in-place strength is needed before work continues.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A segregation/edge-holding test in which unconsolidated concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, and stripped to inspect sides for voids and edges for slumping; a common target for slipform paving is edge slump of 6 mm (0.25 in.) or less.
Water for complete hydration Design and Control of Concrete Mixtures (17th ed.), Chapter 2 — Water (Evaporable and Nonevaporable) section, Page 43
Complete hydration of portland cement requires water of about 40% of the mass of the cement (w/c of 0.40); below about 0.40 some cement remains unhydrated for lack of water, and above it the excess water sits in capillary pores or evaporates.
Cold-weather subgrade temperature differential Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
In cold weather the surface temperature of the supporting materials and the concrete temperature should be held to a differential of less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss and plastic shrinkage cracking; concrete must not be placed on frozen subgrade and snow, ice and debris must be removed from within the forms.
Two full business days (Louisiana 811) Louisiana 811 Brochure, Pages 1-2 — two full business days/'For Best Results'
A normal locate request requires two full business days before digging, excluding the ticket submission date, weekends and holidays — e.g., a Monday 9:00 a.m. ticket with a Tuesday holiday counts Wednesday and Thursday, so excavation may begin Friday.
Metered service locate marking Louisiana 811 Brochure, Page 2 — 'For Best Results' (metered service)
For a metered utility, lines typically are marked only up to the meter and not beyond, because operators do not know what customer-owned piping was installed downstream; the contractor must watch for unmarked customer-owned lines.
Inlet interception rule of thumb Design and Construction of Urban Storm Water Management Systems, Chapter 8, Pages 246 to 247
When locating successive curb inlets on a continuous grade by trial and error, 70-80% of the approaching gutter flow is a reasonable rule of thumb for interception, with succeeding inlets sized for the bypass (carryover) plus intervening street flow.

Formulas to Know

Loose haul volume of broken asphalt/concrete slabLCY = BCY × 1.7 (example: 1,400 BCY × 1.7 = 2,380 LCY)
Load factor (loose to bank)Load factor = bank volume ÷ (bank volume + swell percentage); BCY = LCY × load factor
Import quantity (cut vs. fill in a common soil state)Convert both cut and fill to the same state (LCY) using the project's conversion factors, then subtract: import = fill LCY − cut LCY (worked example for dry common earth at 100% Standard Proctor: 4,000 BCY × 1.32 = 5,280 LCY; 4,000 CCY × 1.54 = 6,160 LCY; 6,160 − 5,280 = 880 LCY)
Height of instrument when grade rod is set on top of pipeHI = rod reading on hub + cut − (pipe diameter + wall thickness) (example: 4.78 + 12.66 − 1.25 = 16.19)
Realistic excavator production from optimum productionRealistic rate = optimum rate × operator-ability factor × job-efficiency factor × site-condition factor (example: 78 LCY/hr × 0.75 × 0.83 × 0.6 = 29 LCY/hr)
Motor-grader production and timeProduction = (blade width ft × speed mph × 5,280 × job efficiency × operator ability) ÷ number of passes = SF/hr; convert to SY/hr (÷9) and divide total SY by the rate (example: (12 × 4 × 5,280 × 0.83 × 0.75) ÷ 5 = 31,553 SF/hr = 3,506 SY/hr; 30,000 ÷ 3,506 ≈ 8.6 hr)
Trench linear feet per hour by the set methodBCF/LF = width × depth; LCF/LF = BCF × (1 + swell); LCF per set = LCF/LF × set length; cycles per set = LCF per set ÷ bucket load; time per set = (cycles × cycle seconds) + machine move time; sets/hr = 3,600 s ÷ time per set; LF/hr = sets/hr × set length (example with 15 s move time: 2 × 4 = 8 BCF; ×1.3 = 10.4 LCF; ×8 ft = 83.2; ÷8 = 10.4 cycles; (10.4×12)+15 = 139.8 s = 2.33 min; 60 ÷ 2.33 = 25.75 sets; ×8 = 206 LF/hr)
Heaped bucket capacityHeaped ≈ 1.30 × struck capacity (example: struck 5 to 6 LCF → heaped about 6.5 to 8 LCF)
Concrete volumes for slabs, footings and pier footingsVolume cu yd = (length × width × thickness in ft) ÷ 27; for a 4-in. slab one cubic yard covers 81 sq ft, so cu yd = area ÷ 81; footing length = outside perimeter = 2 × (L + W); order continuous footing rounded UP to the next quarter yard, and combined net volumes rounded up to the next whole yard (examples: 960 ÷ 81 = 11.85 → 12 cu yd; 124 ft × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 → order 5.25 cu yd; 5.10 + 0.69 + 11.85 = 17.65 → 18 cu yd)
Foundation wall form contact area, 8-in. wall concrete, and block countsForm contact area (both faces) = 2 × perimeter × height (example: 2 × 136 × 8 = 2,176 sq ft); 8-in. wall concrete = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft (example: 1,088 ÷ 100 = 10.88 × 2.47 = 26.87 cu yd); block: three courses stack 2 ft (courses = height × 3/2) and three blocks lay 4 ft (blocks = length × 3/4)