Louisiana Earthwork, Drainage and Levees Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 30 questions (same as real exam)
- 75 minute time limit
- 6 topic areas covered
- 209 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Louisiana Earthwork, Drainage and Levees Practice Exam Guide
What's on the exam
Questions per topic, out of 30This practice exam follows the official content outline for the Louisiana Earthwork, Drainage and Levees exam: Earthwork/Surveying, Concrete, Curbs and Gutters, Culverts, One Call, Heavy Equipment/Safety.
- Free practice exam: 10 questions per attempt, retake as often as you like.
- Full practice exam: 30 questions on a 75 minutes clock, a new draw from our bank every attempt.
Earthwork/Surveying 8 items
Our study plan for this topic: Reading and interpreting plan views and profile views for underground utility work; Surveying instruments and measurement techniques (optical level, transit, grade rod, GPS); Establishing line and grade using hubs, reference stakes, batter boards, and laser systems; Station numbers, elevations, cuts, fills, and engineer's decimal measurements; Contour maps, contour intervals, and estimating cut and fill volumes using cross-section and average end area methods; Soil compaction methods, Proctor tests, and field density testing; Site preparation tasks including clearing, grubbing, utility location, and sediment control; Dealing with rock types, rippability, and groundwater dewatering in excavation.
Concrete 5 items
Our study plan for this topic: Concrete mixture proportioning and water-cementitious materials ratio; Portland cement types and supplementary cementitious materials (fly ash, slag cement, silica fume); Aggregates for concrete: classification, grading, and properties; Fresh concrete properties: workability, slump, air content, and bleeding; Concrete durability: freeze-thaw resistance, sulfate attack, and permeability; Placing, finishing, and curing concrete; Chemical admixtures: types, functions, and effects on concrete properties; Hot and cold weather concreting precautions and requirements.
Curbs and Gutters 5 items
Our study plan for this topic: Gutter grade and cross-slope design standards; Curb opening inlet types, capacity, and placement; Grate inlet types and debris blockage considerations; Combination curb-and-grate inlet applications; Allowable pavement encroachment criteria by street classification; Gutter flow capacity calculations using Manning's equation; Inlet location and spacing requirements at intersections and grade transitions; Special purpose inlet types including slotted drains and bicycle-safe grates.
Culverts 3 items
Our study plan for this topic: Culvert hydraulic design and flow control (inlet vs. outlet control); Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types); Structural loads on buried culverts (soil loads, Marston theory, trench vs. embankment conditions); Pipe bedding and backfill requirements for culvert installation; Outlet protection and energy dissipation at culvert outlets (riprap aprons, scour hole design); Headwater and tailwater depth calculations for culvert sizing; Superimposed live loads on culverts (highway, railway loading); Culvert end structures and appurtenances (headwalls, wingwalls, energy-dissipating headwalls).
One Call 5 items
Our study plan for this topic: Louisiana 811 notification requirements and legal obligations; Two full business days advance notice rule; Tolerance zone dimensions and hand-digging requirements; Locate request validity periods and renewal procedures; Underground utility marking color codes and excavator white-marking responsibilities; Procedures when a utility line is accidentally damaged; Positive response requirements and unmarked facility follow-up; Civil penalties for Dig Law violations.
Heavy Equipment/Safety 4 items
Our study plan for this topic: Excavation cave-in protective systems (sloping, benching, shoring, and trench shields); Pre-shift and periodic inspection requirements for heavy equipment and cranes; Rollover protective structures (ROPS) for earthmoving equipment; Power line safety and minimum clearance distances for equipment operations; Personal protective equipment requirements for construction operations; Motor vehicle and earthmoving equipment operational safety requirements; Crane and derrick assembly, disassembly, and operator qualification requirements; Signs, signals, barricades, and flagging requirements for construction work zones.
Sample 1 — Earthwork/Surveying
Question: When using a scraper fleet for embankment construction, what advantage do scrapers offer over trucks for placing fill material?
- A. Scrapers can carry heavier payloads than any hauling truck
- B. Scrapers can operate at higher speeds than trucks on haul roads
- C. Scrapers do not require pusher assistance during loading
- D. Scrapers can dump their payload in uniformly thick layers, improving compaction productivity
Correct Answer: D
According to the reference material, a scraper can dump its payload in uniformly thick layers, whereas trucks cannot. This improves compaction productivity during embankment construction because uniform lift thickness leads to more consistent compaction results.
Reference: Pipe and Excavation Contracting, Page 90
Sample 2 — Concrete
Question: You are placing a concrete deck slab at a sewer plant during cold weather and must verify the in-place strength before shoring is removed and work continues. Rather than relying on standard-cured cylinders, you plan to use cylinders cast in place in cylindrical molds that are left in the member and cured exactly as the surrounding concrete. For what range of member depth is this cast-in-place cylinder method intended to be used?
- A. 8 in. to 24 in.
- B. 5 in. to 12 in.
- C. 2 in. to 8 in.
- D. 4 in. to 6 in.
Correct Answer: B
Per ASTM C873 (Design and Control of Concrete Mixtures, 17th ed., Chapter 20, Strength Tests of Hardened Concrete), cast-in-place cylinders can be used in concrete that is 125 mm to 300 mm (5 in. to 12 in.) in depth. The mold is filled during normal placement, cured in place with the rest of the section, then removed and tested. The text notes this method is particularly applicable to cold-weather concreting, post-tensioning work, and slabs — any work where a minimum in-place strength must be achieved before construction continues. Note also that if the specimen's length-diameter ratio is less than 1.75, the strength correction factors of ASTM C42 must be applied.
Reference: Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
Sample 3 — Curbs and Gutters
Question: A curbed collector street includes a horizontal curve where the pavement transitions from normal crown into superelevation. Where should an inlet be located relative to this transition, and for what stated reason?
- A. At the midpoint of the curve, to shorten the gutter flow path on the curve
- B. Where the cross slope begins to superelevate, to prevent cross flow to the opposite side
- C. At the high point of the curve, to limit splashing on adjacent pedestrians
- D. Downstream of the full superelevated section, to allow gutter flow to concentrate
Correct Answer: B
Chapter 8 (Location and Spacing) states inlets are generally required where the street cross slope begins to superelevate; these inlets reduce the traffic hazard of street cross flow to the opposite side of the street.
Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 246
- Your results break the score down by outline topic.
- The real exam's passing score: 21 correct answers out of 30 scored questions.
- Keep practicing until you pass consistently, not just once.
- Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
- Work your bookmarks on the second pass.
- Real exam pace: about 2 minutes 30 seconds per question.
- After each attempt, look up every miss in your book.
| Questions | 30 questions |
| Time limit | 75 minutes |
| Passing score | 21 correct answers out of 30 scored questions |
| Books in the exam room | Open book |
Source: EARTHWORK, DRAINAGE AND LEVEES EXAMINATION. Check the bulletin before test day: fees and rules can change.