Exam Cheat Sheet · Quick Reference

Louisiana Horizontal Directional Drilling

Louisiana  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
30
Passing score
70%
Exam time
75 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Louisiana State Portion 30 questions

Piles 3 Q · 10%
Pile types and materials (timber, concrete, steel, composite)Friction piles vs. end-bearing pilesPile-driving hammer types (single-acting, double-acting, differential, diesel, hydraulic, vibratory)Sheet pile applications and installation methodsPile driving resistance and the Engineering News formulaHammer selection criteria and rated energyPile driving accessories (leads, cushions, driving caps, templates)Pile-driving safety requirements (OSHA 1926.603)
Excavation and Grading 6 Q · 20%
Earthwork quantity calculation methods (average-end-area, cross-section, grid methods)Mass diagram analysis and balance lines for haul planningCut and fill volume estimation including topsoil stripping adjustmentsSoil classification and volume change (swell, shrinkage, bank/loose/compacted states)Soil compaction specifications, testing methods (Proctor, nuclear density), and moisture controlExcavation equipment selection and production estimation (dozers, graders, excavators, loaders)Rock identification, rippability determination, and rock excavation methodsTrench safety, groundwater management, and dewatering techniques
Trenching and Boring 3 Q · 10%
Horizontal directional drilling (HDD) two-stage process: pilot hole and reamingHDD drill head tracking and guidance systems (walk-over, wire-line, gyroscope)Drilling fluid (bentonite slurry) use in horizontal boring for cuttings removal and bit coolingTrenchless alternatives: pipe ramming, pipe jacking, auger boring, and microtunnelingTrench excavation with backhoe: production rate calculation and bucket capacityTrench safety: shoring systems, trench boxes, and cave-in protectionSoil and rock drilling equipment selection based on material hardness and project conditionsWorking around existing underground utilities (crossline detection and excavation techniques)
Underground Piping including Pipe Welding, Concrete, Ductile Iron 9 Q · 30%
Pipe joint preparation and fit-up for welding (beveling, root opening, tack welding)Uphill and downhill SMAW root bead welding techniques (5G position)GTAW root bead welding process and equipmentIntermediate and cover pass welding (multilayer welds, electrode selection)Pipe welding defects and prevention (undercutting, slag inclusions, underbead cracking, burn-through)Welder and procedure qualification (bend tests, ASME Code requirements)Ductile iron pipe installation (trench preparation, joint assembly, backfilling, thrust restraint)Concrete pipe and box culvert installation (bedding types, jointing, backfill compaction, acceptance testing)
Underground Electrical Cable Installation and Safety 5 Q · 17%
Minimum cover requirements for direct-buried cables and conduit (Table 300.5)Permitted underground wiring methods and conduit types (PVC, HDPE, RMC, IMC, RTRC, NUCC, Type UF)Protection of underground conductors emerging from grade and entering buildingsGrounding and bonding requirements for underground electrical installationsConductor insulation types and ampacity ratings for underground applicationsBackfill requirements and protection from physical damage for direct-buried installationsRaceway sealing and bushing requirements for underground conduit systemsOSHA construction site electrical safety requirements for underground and temporary wiring
OSHA Safety 4 Q · 13%
Excavation safety and cave-in protection (Subpart P)Confined space entry requirements and permit procedures (Subpart AA)Underground construction hazards and air quality monitoring (Subpart S)Personal protective equipment selection, use, and payment requirements (Subpart E)Fall protection systems and criteria (Subpart M)Hazard communication and permissible exposure limits for airborne contaminantsMedical services, first aid, and emergency action plansMotor vehicle and mechanized equipment safety requirements (Subpart O)

Key Distinctions

Gyroscope position systemvsWire-line (magnetic guidance) system

The gyroscope system is accurate to within ±3 ft (1 m) at 6,500 ft and is not affected by magnetic fields from underground utilities such as ductile iron pipe or by surface electromagnetic fields, while a wire-line system without a surface grid is accurate only to about ±130 ft at that distance and its accuracy is further diminished by strong magnetic fields.

Construction Planning, Equipment, and Methods (9th ed.), Pages 555 to 557
Pipe reamingvsPipe bursting

Pipe reaming uses a directional drill with a reaming head to pulverize and grind out the existing pipe (mud carries particles to a receiving manhole), while pipe bursting expands the old pipe's fragments into the surrounding soil — making reaming optimum in incompressible or granular soils and near fragile adjacent pipes.

Construction Planning, Equipment, and Methods (9th ed.), Pages 552 to 553
V-Bio enhanced polyethylene filmvsConventional polyethylene encasement

V-Bio (offered beginning 2013) uses co-extrusion to infuse a corrosion inhibitor and an anti-microbial component into the innermost surface of the film, and is the recommended film for ductile iron pipe in corrosive soils (installed per ANSI/AWWA C105/A21.5).

DIPRA Installation Guide for Ductile Iron Pipe, Pages 29 to 30 (Section 2.16 V-Bio Enhanced Polyethylene)
Uphill pipe welding groove anglevsDownhill pipe welding groove angle

Welds completed uphill typically use a 75-degree groove angle (37.5-degree bevel on each pipe), while downhill welding uses a narrower 60-degree groove angle.

Modern Welding, Page 23-6; Pipe Welding Procedures, Chapter 4
Whip-and-pause technique (root bead)vsV-shaped weave with low-hydrogen (E7018) electrodes

Whipping is the remedy for molten-metal overflow when welding a root bead vertical uphill in 5G, but it must never be used with low-hydrogen electrodes — a V-shaped weave is used entirely around the pipe instead; excessive whipping exposes the puddle and causes porosity and slag entrapment.

Pipe Welding Procedures (2nd ed.), Chapter 5
MartensitevsFerrite

Martensite has a body-centered tetragonal (elongated body-centered cubic) structure caused by carbon atoms trapped within it and forms on very rapid quenching from austenite, while ferrite has a body-centered cubic structure with very little dissolved carbon.

Pipe Welding Procedures (2nd ed.), Chapter 11 (Introduction to Welding Metallurgy)
Pearlite / bainitevsMartensite

Slow cooling through the eutectoid temperature produces pearlite; quenching to about 675°F (360°C) then cooling slowly produces bainite (good strength, not as hard as martensite, ductile and tough); only a full ice-water quench produces martensite.

Pipe Welding Procedures (2nd ed.), Chapter 11, T-T-T Diagram / Steel Microstructures section
Single-acting steam or air hammervsDouble-acting hammer

A single-acting steam or air hammer strikes 40 to 60 blows per minute, while a double-acting hammer delivers 95 to 300 blows per minute (700 to 1,200 refers to optimal vibratory hammer frequency ranges).

Construction Planning, Equipment, and Methods (9th ed.), Chapter 17 — Single-Acting Hammers section
Stripping over a cutvsStripping under a fill

On an earthwork volume sheet, stripping over a cut is SUBTRACTED from the cut volume because organic material cannot be used as structural fill, while stripping under a fill is ADDED to the fill requirement.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Stripping / Earthwork Volume Sheet sections
Bank cubic yards (BCY)vsLoose cubic yards (LCY)

Bank volume is the in-place (in situ) measure used for excavation quantities, while loose volume is the swelled, disturbed measure that must be used for figuring haul-off truck loads; dividing bank volume by truck size under-counts the loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Shoring jacks with plywood tight-sheetingvsTrench box

Wet clays and loams that 'slab off' the lower trench call for tight-sheeting with plywood on each side of (or attached to) the shoring jacks, while trench boxes are recommended for deep trenches in unstable ground such as wet sands and gravels; open ditches suit only shallow excavations in reasonably dry, stable soil.

Pipe and Excavation Contracting, Page 228 (Installing Sewer & Stormwater Systems chapter)
Oxygen enriched atmospherevsOxygen deficient atmosphere

Per 29 CFR 1926.1202, oxygen enriched means more than 23.5 percent oxygen by volume and oxygen deficient means less than 19.5 percent; either is a hazardous atmosphere under the confined spaces standard.

29 CFR 1926, §1926.1202
Service-entrance conductors, underground systemvsUnderground service conductors

Per NEC 2017 Article 100, service-entrance conductors (underground system) run between the terminals of the service equipment and the point of connection to the service lateral, while underground service conductors run between the service point and the first point of connection to the service-entrance conductors in a terminal box, meter, or other enclosure.

NEC 2017 Article 100 — Definitions, Service-Entrance Conductors, Underground System
Undisturbed native soilvsSoil in an old trench line

In certain soils, soil resistance is usually greater in undisturbed earth, so an old ditch digs easier; the grademan can spot the old line visually by darker spots of topsoil mixed in with lighter-colored subsoil.

Pipe and Excavation Contracting, Page 148

Key Terms

V-Bio enhanced polyethylene DIPRA Installation Guide for Ductile Iron Pipe, Pages 29 to 30 (Section 2.16 V-Bio Enhanced Polyethylene)
Co-extruded polyethylene encasement film with a corrosion inhibitor and an anti-microbial component infused into its innermost surface, recommended for ductile iron pipe in corrosive soils and installed per ANSI/AWWA C105/A21.5 (DIPRA Section 2.16).
Design Decision Model (DDM) DIPRA Installation Guide for Ductile Iron Pipe, Pages 28 to 29 (Section 2.15 Corrosive Soil)
Per DIPRA Section 2.15, a two-dimensional, risk-based extension of the 10-point soil evaluation procedure that balances the likelihood of a corrosion-related problem against the consequences of a pipeline failure in selecting a mitigation strategy.
Crosshaul Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Haul Distances section
Material that moves at right angles to the centerline between the same two stations — the difference between total cut within the project limits and the longitudinal quantity shown by the mass diagram — commonly treated as dozer work.
Set (trenching) Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
In production trenching, the length of trench a backhoe can excavate from one position.
Digging cycle Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
Per the Page 143 table, the five components in order are: load bucket, lift load, swing & prepare to dump, dump bucket load, and return to dig.
Pipe ramming Construction Planning, Equipment, and Methods (9th ed.), Page 554
A trenchless method viable for installing steel pipes and casings over distances usually up to 150 ft, with diameters up to 55 in.
Pipe reaming Construction Planning, Equipment, and Methods (9th ed.), Pages 552 to 553
A trenchless replacement method using a directional drill with a reaming head to pulverize the existing pipe, with drilling mud carrying the disintegrated particles to a receiving manhole.
Keyhole (root bead) Pipe Welding Procedures (2nd ed.), Chapter 4 and Chapter 5
The opening at the root that should be about 1½ times the diameter across the electrode coating, so the deposited bead penetrates to the root and produces a small crown of about 1/16 inch inside the pipe; to stop a root bead, make a quick stab through the keyhole and withdraw quickly so a full-size keyhole remains for restart.
Maximum pipe fit-up misalignment (ASME Code) Pipe Welding Procedures (2nd ed.), Chapter 4
The maximum misalignment allowed between the inside surfaces of two pipes being fit up is 1/16 inch; inside surfaces must blend together smoothly.
GTAW root joint preparation Pipe Welding Procedures (2nd ed.), Chapter 6, Page 65 (Preparation of the Weld Joint)
Per Pipe Welding Procedures Ch. 6, the root face is reduced to 1/16 inch and the root opening narrowed to 1/16 to 3/32 inch for GTAW root bead welding.
GTAW torch oscillation / electrode angle Pipe Welding Procedures (2nd ed.), Chapter 6, Pages 68-69 (Procedure for Welding the Root Bead)
The welder rocks the torch nozzle side to side while keeping it in contact with the bevel surfaces (acting like a V-block) to hold a constant arc length; the torch starts at about 55 degrees and is pivoted to the correct 20-degree welding angle once the arc is established.
Underbead cracking Pipe Welding Procedures (2nd ed.), Chapter 13, Pages 208-209
Cracking in the base metal near the fusion line that requires dissolved hydrogen; prevented by using low-hydrogen electrodes and preheating the base metal to slow cooling so hydrogen can escape (postweld heat treatment relieves stress but is seldom effective against it).
Hypoeutectoid steel Pipe Welding Procedures (2nd ed.), Chapter 11 (Introduction to Welding Metallurgy)
Steel containing less carbon than the eutectoid composition (0.77%), whose microstructure is ferrite and pearlite when cooled below 1341°F (727°C), with pearlite increasing as carbon approaches 0.77%.
PVC conduit ambient temperature limit (NEC 352.12(D)) NEC 2017 Section 352.12(D)
PVC conduit shall not be used where subject to ambient temperatures in excess of 50°C (122°F) unless listed otherwise.
PVC expansion fittings (NEC 352.44) NEC 2017 Section 352.44
Expansion fittings shall be provided to compensate for thermal expansion and contraction where the expected length change is 6 mm (1/4 in.) or greater in a straight run between securely mounted items such as boxes, cabinets, elbows, or other conduit terminations.
Minimum cover for RMC/IMC (NEC Table 300.5) NEC 2017 Section 300.5, Table 300.5
Rigid metal conduit and intermediate metal conduit installed underground require a minimum cover of 6 inches for circuits rated 0–1000 volts in most general locations.
Laser line and grade Concrete Pipe and Box Culvert Installation, Concrete Pipe Installation Manual — Installation / Line and Grade section (Page 12)
A helium-neon laser beam serves as a continuous, uninterrupted string line that does not sag, usable for distances up to 1,000 ft (90 to 150 m).
Pipe tongs (lifting clamps) DIPRA Installation Guide for Ductile Iron Pipe, Pages 13 to 14 (Section 1.6 Pipe Tongs)
Patented lifting clamps that must be used with care near trenches with bracing protruding above ground, because pipe contacting the bracing may cause the tongs to release the pipe prematurely (ice on holding pads is a separate cold-weather slippage caution).
Trench box elevation above pipe Pipe and Excavation Contracting, Page 170
The bottom of the trench box should sit 2 to 3 feet higher than the pipe; too low and pulling it disturbs bedding and newly-laid pipe, and more than 5 feet above the pipe makes the ditch unsafe.
Cemented soils Pipe and Excavation Contracting, Page 171
Soils that can be quite stable (a vertical wall may be safe in cemented gravel), but it is wise to consider all trench walls over 5 feet high dangerous, and a pocket of loose sand or heavy loam in the wall makes it dangerous — protection must account for the weakest soil present.
Drain rock (manhole excavation in groundwater) Pipe and Excavation Contracting, Pages 246-247 (Installing Sewer & Stormwater Systems chapter)
Rock used to stabilize running sands and gravels in groundwater excavation; the pump intake is kept clear by surrounding it in drain rock or placing it in a slotted pipe, and excavating too quickly causes splashing, subsidence and bank collapse.

Formulas to Know

Loose volume from bank volume using a printed swell percentageLCY = BCY × (1 + swell%); e.g., 25.19 × 1.30 = 32.74 LCY; 23.70 × 1.25 = 29.63 LCY; 512.00 × 1.20 = 614.40 LCY; 388.89 × 1.20 = 466.67 LCY; 456.00 × 1.20 = 547.20 LCY
Loose volume of broken asphalt/concrete slab (swell factor 1.7)LCY = BCY × 1.7 (always allow 1.7 for asphalt and concrete slabs); worked example: 1,400 BCY × 1.7 = 2,380 LCY. Factors of 1.3, 1.4 and 1.5 apply to soils such as loam, not broken slab.
Haul-off truck loads (figured in loose yards, rounded up)Loads = LCY ÷ truck capacity, rounded up; e.g., 32.74 ÷ 12 = 2.73 → 3 loads; 29.63 ÷ 14 = 2.12 → 3 loads; 614.40 ÷ 10 = 61.44 → 62 loads; 466.67 ÷ 12 = 38.89 → 39 loads; 547.20 ÷ 14 = 39.09 → 40 loads
Trench excavation bank volume (trench figured on outside perimeter)Length = 2 × (L + W); BCY = length × width × depth ÷ 27; e.g., 2 × (40 + 28) = 136 ft × 2.5 ft × 2 ft = 680.0 cu ft ÷ 27 = 25.19 BCY; 2 × (40 + 24) = 128 ft × 2.5 × 2 = 640.0 ÷ 27 = 23.70 BCY
Basement excavation footprint and bank volume (building dimensions plus working offset on each side)Footprint = (L + 2 × offset) × (W + 2 × offset); BCY = footprint × depth ÷ 27; e.g., (44+2×2)×(28+2×2) = 48×32 = 1,536 sf × 9 ft = 13,824 cf ÷ 27 = 512.00 BCY; (44+2×3)×(24+2×3) = 50×30 = 1,500 sf × 7 ft = 10,500 cf ÷ 27 = 388.89 BCY; (32+2×3)×(30+2×3) = 38×36 = 1,368 sf × 9 ft = 12,312 cf ÷ 27 = 456.00 BCY
Additional loose yards when swell increases by 10 percentage pointsExtra LCY = BCY × 0.10; e.g., 25.19 × 0.10 = 2.52; 23.70 × 0.10 = 2.37; 512.00 × 0.10 = 51.20; 388.89 × 0.10 = 38.89; 456.00 × 0.10 = 45.60
Height of instrument when the grade rod is set on top of the pipeHI = rod reading on hub + cut − (pipe diameter + wall thickness); worked example: 4.78 + 12.66 − 1.25 = 16.19
Backhoe size selection (most efficient within 70% of max digging depth)Required max rated digging depth = trench depth ÷ 0.70; worked example: 12 ÷ 0.70 ≈ 17 ft
Crosshaul from a mass diagramLongitudinal quantity = sum of absolute values of mass-diagram peaks and low points; Crosshaul = total cut within project limits − longitudinal quantity; worked example: 1,500 + 2,200 = 3,700 bcy; 4,100 − 3,700 = 400 bcy
Earthwork volume sheet station balance with strippingAvailable cut = cut − stripping over cut; Adjusted fill = fill + stripping under fill; convert fill to bank by dividing by 0.90; algebraic sum = available cut − bank fill. Worked example: (1,800 − 200) = 1,600 bcy; (900 + 100) = 1,000 ccy ÷ 0.90 = 1,111 bcy; 1,600 − 1,111 = 489 bcy surplus
Engineering News pile formula, single-acting hammerSafe load = (W × h) / (s + 1), where s = penetration in inches per blow; a safety factor of six is built into the equation
Minimum single-acting hammer weight for a pileMinimum hammer weight = 1/3 × pile weight (recommended weight equals the pile weight); worked example: 0.33 × 21,000 lb = 6,930 lb