Louisiana · PSI

Louisiana Horizontal Directional Drilling Practice Exam

30 questions 75 minutes 70% to pass 6 topics 2:30 per question Open book 196 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$4.95

Complete exam simulation matching the real PSI test format.

  • 30 questions (same as real exam)
  • 75 minute time limit
  • 6 topic areas covered
  • 196 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 6 topic quizzes and this full exam. $59.95/month.
See the study course

Louisiana Horizontal Directional Drilling Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 30
Underground Piping including Pipe Welding, Concrete, Ductile Iron9
Excavation and Grading6
Underground Electrical Cable Installation and Safety5
OSHA Safety4
Piles3
Trenching and Boring3

This practice exam is built around the official content outline for the Louisiana Horizontal Directional Drilling exam: Piles, Excavation and Grading, Trenching and Boring, Underground Piping including Pipe Welding, Concrete, Ductile Iron, Underground Electrical Cable Installation and Safety, OSHA Safety.

There are two ways to practice. The free practice exam gives you 10 questions per attempt, and you can take it as many times as you like. The full practice exam gives you 30 questions on a 75 minutes clock, with a new draw from our question bank each time.

6 topics

Piles 3 items

Our study plan for this topic: Pile types and materials (timber, concrete, steel, composite); Friction piles vs. end-bearing piles; Pile-driving hammer types (single-acting, double-acting, differential, diesel, hydraulic, vibratory); Sheet pile applications and installation methods; Pile driving resistance and the Engineering News formula; Hammer selection criteria and rated energy; Pile driving accessories (leads, cushions, driving caps, templates); Pile-driving safety requirements (OSHA 1926.603).

Excavation and Grading 6 items

Our study plan for this topic: Earthwork quantity calculation methods (average-end-area, cross-section, grid methods); Mass diagram analysis and balance lines for haul planning; Cut and fill volume estimation including topsoil stripping adjustments; Soil classification and volume change (swell, shrinkage, bank/loose/compacted states); Soil compaction specifications, testing methods (Proctor, nuclear density), and moisture control; Excavation equipment selection and production estimation (dozers, graders, excavators, loaders); Rock identification, rippability determination, and rock excavation methods; Trench safety, groundwater management, and dewatering techniques.

Trenching and Boring 3 items

Our study plan for this topic: Horizontal directional drilling (HDD) two-stage process: pilot hole and reaming; HDD drill head tracking and guidance systems (walk-over, wire-line, gyroscope); Drilling fluid (bentonite slurry) use in horizontal boring for cuttings removal and bit cooling; Trenchless alternatives: pipe ramming, pipe jacking, auger boring, and microtunneling; Trench excavation with backhoe: production rate calculation and bucket capacity; Trench safety: shoring systems, trench boxes, and cave-in protection; Soil and rock drilling equipment selection based on material hardness and project conditions; Working around existing underground utilities (crossline detection and excavation techniques).

Underground Piping including Pipe Welding, Concrete, Ductile Iron 9 items

Our study plan for this topic: Pipe joint preparation and fit-up for welding (beveling, root opening, tack welding); Uphill and downhill SMAW root bead welding techniques (5G position); GTAW root bead welding process and equipment; Intermediate and cover pass welding (multilayer welds, electrode selection); Pipe welding defects and prevention (undercutting, slag inclusions, underbead cracking, burn-through); Welder and procedure qualification (bend tests, ASME Code requirements); Ductile iron pipe installation (trench preparation, joint assembly, backfilling, thrust restraint); Concrete pipe and box culvert installation (bedding types, jointing, backfill compaction, acceptance testing).

Underground Electrical Cable Installation and Safety 5 items

Our study plan for this topic: Minimum cover requirements for direct-buried cables and conduit (Table 300.5); Permitted underground wiring methods and conduit types (PVC, HDPE, RMC, IMC, RTRC, NUCC, Type UF); Protection of underground conductors emerging from grade and entering buildings; Grounding and bonding requirements for underground electrical installations; Conductor insulation types and ampacity ratings for underground applications; Backfill requirements and protection from physical damage for direct-buried installations; Raceway sealing and bushing requirements for underground conduit systems; OSHA construction site electrical safety requirements for underground and temporary wiring.

OSHA Safety 4 items

Our study plan for this topic: Excavation safety and cave-in protection (Subpart P); Confined space entry requirements and permit procedures (Subpart AA); Underground construction hazards and air quality monitoring (Subpart S); Personal protective equipment selection, use, and payment requirements (Subpart E); Fall protection systems and criteria (Subpart M); Hazard communication and permissible exposure limits for airborne contaminants; Medical services, first aid, and emergency action plans; Motor vehicle and mechanized equipment safety requirements (Subpart O).

3 questions

Sample 1 — Underground Piping including Pipe Welding, Concrete, Ductile Iron

Question: When fitting up two pipe sections and the root opening is found to be too wide for normal welding, what is the recommended first step to bridge the gap before welding the root bead?

  • A. Insert a consumable backing ring sized for the wider opening
  • B. Apply backing tape and weld the root pass with a wide weave pattern
  • C. Increase welding current by 30 amps and weld at maximum speed
  • D. Deposit small nuggets of weld metal alternately on each root face until a bridge forms

Correct Answer: D

When the root opening is too wide, the welder builds a bridge of weld metal across the gap by depositing small nuggets of weld metal alternately on each root face until one nugget joins the two faces together. The welding current should be reduced slightly for this procedure. These nuggets are imperfectly fused and must be removed after a sound bead is deposited over them.

Reference: Pipe Welding Procedures (2nd ed.), Chapter 5

Sample 2 — Excavation and Grading

Question: On your jobsite a light topsoil overlies a heavier sandy soil, and the two have become partially mixed in the spoil pile, producing widely varying field density results. What does accepted compaction practice call for in this situation?

  • A. Apply the lower Proctor value to all tests
  • B. Run a Proctor only for the dominant soil
  • C. Average the two Proctor values for the mix
  • D. Run a Proctor for each soil and mix

Correct Answer: D

Per Pipe & Excavation Contracting, Chapter 6 (Soil Compaction, Page 189), when several soil types are present and become partially mixed, a Proctor must be obtained for each soil type and each mix of soil types. The preferred approach is to keep the soils separate so topsoil-to-topsoil, sandy-soil-to-sandy-soil and mixed-soil-to-mixed-soil Proctors can be compared without repeatedly running lab tests.

Reference: Pipe and Excavation Contracting, Chapter 6 — Soil Compaction, Page 189

Sample 3 — Underground Electrical Cable Installation and Safety

Question: As the excavation contractor, you are running a long straight length of rigid polyvinyl chloride conduit between two securely mounted cabinets on an exposed exterior wall, where the conduit will see a wide seasonal temperature swing. You must install an expansion fitting if the calculated length change for that straight run is expected to be at least how much?

  • A. 19 mm (3/4 in.)
  • B. 6 mm (1/4 in.)
  • C. 3 mm (1/8 in.)
  • D. 13 mm (1/2 in.)

Correct Answer: B

Per NEC 2017, Section 352.44, expansion fittings for PVC conduit shall be provided to compensate for thermal expansion and contraction where the length change, determined in accordance with Table 352.44, is expected to be 6 mm (1/4 in.) or greater in a straight run between securely mounted items such as boxes, cabinets, elbows, or other conduit terminations.

Reference: NEC 2017 Section 352.44

Your first score is just a starting point. After every attempt, the results page shows how you did on each outline topic, so you can see what to work on next. Compare your score with the real exam's passing score, 21 correct answers out of 30 scored questions, and keep at it until you pass consistently.

  • Start with the questions you know. Go through the whole exam once and bookmark anything you're unsure about. Our practice exams let you bookmark and come back.
  • Circle back to your bookmarks on the second pass.
  • Keep an eye on your pace. The real exam works out to about 2 minutes 30 seconds per question.
  • Turn every miss into a lesson. After each attempt, look up each missed question's reference in your book and read the section.

Questions 30 questions
Time limit 75 minutes
Passing score 21 correct answers out of 30 scored questions
Books in the exam room Open book

Source: HORIZONTAL DIRECTIONAL DRILLING EXAMINATION. Check the bulletin before test day: fees and rules can change.