Drainage
21 Q · 21%
Installation (2 items; NYC PC Ch. 3)Maintenance (2 items; NYC PC Ch. 3, NYC PC Ch. 7)Inspection Requirements (3 items; NYC PC Ch. 1)Permits (2 items; NYC PC Ch. 1, NYC ADC Ch. 1, NYC BC Appendix G)Indirect/Special Waste (1 items; NYC PC Ch. 3, NYC PC Ch. 8)Sanitary Drainage (4 items; NYC PC Ch. 3, NYC PC Ch. 6, NYC PC Ch. 7, NYC FGC Ch. 3)Storm Drainage (3 items; NYC PC Ch. 3, NYC PC Ch. 11)Vents (4 items; NYC PC Ch. 9)Drainage pipe materials and approved standards (above-ground, underground, building drain)Drainage fixture unit values and system sizing (Tables 709.1, 710.1)Cleanout requirements (location, spacing, size, access)Piping slope, grade, and changes in direction
+7 more
Equipment
23 Q · 23%
Installation (Equipment) (2 items; NYC PC Ch. 3, NYC PC Ch. 4, NYC ADC Ch. 2, NYC ADC Ch. 3)Maintenance (Equipment) (1 items; NYC PC Ch. 3, NYC PC Ch. 6)Inspection Requirements (Equipment) (2 items; NYC PC Ch. 1, NYC PC Ch. 3)Permits (Equipment) (2 items; NYC PC Ch. 1)Materials (Equipment) (2 items; NYC PC Ch. 3, NYC PC Ch. 7)Limited Alterations (2 items; NYC ADC Ch. 1, NYC BC Ch. 1)Applicability (3 items; NYC PC Ch. 1)Fixtures, Faucets, and Fittings (4 items; NYC PC Ch. 4, NYC PC Ch. 6, NYC PC Ch. 8)Sizing (2 items; NYC PC Ch. 6, NYC PC Appendix E)Special Piping and Storage (2 items; NYC PC Ch. 12)Traps (1 items; NYC PC Ch. 10)Interceptors and Separators (grease interceptors, oil separators, sand interceptors, sizing and installation)
+13 more
Water Supply
17 Q · 17%
Installation (Water) (3 items; NYC PC Ch. 6)Maintenance (Water) (2 items; NYC PC Ch. 3)Inspection Requirements (Water) (2 items; NYC PC Ch. 1, NYC PC Ch. 3)Permits (Water) (3 items; NYC PC Ch. 1, NYC ADC Ch. 1)Water Recycling Systems (3 items; NYC PC Ch. 13)Water Distribution (4 items; NYC PC Ch. 3, NYC PC Ch. 4, NYC PC Ch. 6)Potable Water Protection and Cross-Connection ControlBackflow Preventer Types, Standards, and Testing RequirementsHot Water Supply System Requirements and Temperature ControlsWater Pressure Management (Booster Systems, Pressure-Reducing Valves, and Water Hammer)Pipe Materials, Joints, and Connection Standards for Water SupplyDisinfection of Potable Water Systems
+6 more
Fire Protection
10 Q · 10%
Standpipe and Sprinkler Installation (3 items; NYC BC Appendix Q)Standpipe and Sprinkler Maintenance (3 items; NYC BC Ch. 33, NYC BC Appendix Q)Inspection Requirements (Fire) (2 items; NYC BC Appendix Q)Permits (Fire) (2 items; NYC ADC Ch. 1)Fire protection during construction and demolition (standpipes, sprinklers, water supply)Stationary fire pump installation requirements (NFPA 20 as modified for NYC)Fire department connections (FDC) — placement, marking, and zoningStandpipe system design requirements (pipe sizing, zones, pressure limits, water supply)Sprinkler system installation in one- and two-family dwellings (NFPA 13D as modified for NYC)Sprinkler system installation in residential occupancies (NFPA 13R as modified for NYC)Air pressurized alarm systems for dry standpipes during construction or demolitionSite safety manager duties related to standpipe readiness and fire protection monitoring
+5 more
Ordinary plumbing work (relocation of fixtures) NYC Administrative Code Title 28 (2022), §28-105.4.4
Per §28-105.4.4(2), relocation of up to two plumbing fixtures within the same room to a maximum of 10 feet (3048 mm) from the original location, except in health care facilities.
Ordinary plumbing work (piping repair/replacement) NYC Administrative Code Title 28 (2022), §28-105.4.4
Per §28-105.4.4(6) and (7), repair or replacement of non-gas, non-fire-suppression piping not longer than 25 feet (7620 mm) inside a building (or connected piping previously repaired under the provision), and of branch piping after the riser shutoff valve including replacement of fixtures.
Monthly report for permit-free ordinary plumbing work NYC Administrative Code Title 28 (2022), §28-105.4.4
Under §28-105.4.4, the licensed plumber must furnish the department a monthly report listing work completed and in progress during the preceding month (block, lot, address, description and location in the building), pay required fees, and certify code compliance.
Approved agency witness (plumbing tests) NYC Plumbing Code 2022, Section 312.1.2
Under Section 312.1.2, an individual authorized to witness tests on behalf of an approved agency must be a licensed master plumber or registered design professional with not less than 5 years experience in the inspection and testing of piping systems.
Fresh air inlet NYC Plumbing Code 2022, Section 703.7.1
Per Section 703.7.1, a pipe connected to every sanitary or combined building drain immediately upstream of and within 4 feet of the building trap, sized at least one-half the diameter of the building drain at the point of connection but not less than 3 inches.
Backwater valve NYC Plumbing Code 2022, Section 709.3
Per the amended ASCE 24 Sections 7.3.3 and 7.3.4 (NYC BC Appendix G), a valve installed in the building drain at its point of exit from the building and downstream of the building trap; in special flood hazard areas an automatic backwater valve or other automatic backflow device is required in each line extending below the design flood elevation, with manually operated devices permitted only as redundant devices.
Suds relief vent NYC Plumbing Code 2022, Section 704.6
Per Section 704.6, a vent relieving a suds pressure zone to a nonpressure zone, sized at least three-quarters the diameter of the piping in which the pressure zone occurs but not less than 2 inches.
Relief vent at every tenth branch interval NYC Plumbing Code 2022, Section 908.2
Per Section 908.2, in stacks with more than 10 branch intervals a relief vent equal in size to the vent stack it connects to, with its lower end connected to the soil or waste stack through a wye below the horizontal branch serving the floor and its upper end connected to the vent stack through a tee or inverted wye not less than 3 feet above the floor.
Vented stack offset NYC Plumbing Code 2022, Section 907.1
Per Section 907.1, a horizontal offset of a drainage stack must be vented where five or more branch intervals are located above the offset, and both the upper and lower sections of the stack must be vented.
Vent terminal location limitation NYC Plumbing Code 2022, Section 903.5.1
Per Section 903.5.1, a new open vent terminal may not be within 10 feet horizontally of a door, operable window or other air intake opening unless it is at least 3 feet above the top of such opening.
Combination plumbing fixture served by a single trap NYC Plumbing Code 2022, Section 1002.1, Exception 2
Per Section 1002.1 Exception 2, a combination fixture may be served by one trap provided one compartment is not more than 6 inches deeper than the other and the waste outlets are not more than 30 inches apart.
Standpipe (clothes washer receptor) NYC Plumbing Code 2022, Section 802.3.3
Per Section 802.3.3, an individually trapped receptor extending not less than 18 inches but not greater than 42 inches above the trap weir, with access provided for rodding.
Prohibited pipe rehabilitation methods NYC Plumbing Code 2022, Section 601.5
Per Sections 601.5 and 701.10, cured-in-place pipe (CIPP) and epoxy spray pipe lining systems shall not be used for rehabilitation of piping systems.
Prohibited drainage joints NYC Plumbing Code 2022, Section 707.1
Per Section 707.1, joints between different-diameter pipes made with elastomeric rolling O-rings, cement or concrete joints, mastic or hot-pour bituminous joints, solvent-cement joints between different types of plastic pipe, and saddle-type fittings are prohibited.
Plug permit NYC Plumbing Code 2022, Section 701.2.5
Per Section 701.2.5, the permit required from the Department of Environmental Protection for abandoned building sewers, which must be securely sealed at a point inside the curb line, as close thereto as practicable.
Line pressure regulator (fuel gas) NYC Fuel Gas Code 2022, Section 410.1
Per FGC 410.1, a regulator required wherever an appliance is designed to operate at a lower pressure than the supply pressure; it must be provided with access, protected from physical damage, and listed as complying with ANSI Z21.80/CSA 6.22.
House line shutoff valve identification NYC Fuel Gas Code 2022, Section 409.3.3
Per FGC 409.3.3, an identification tag attached by the installer to each house line shutoff valve so the piping system supplied is readily identified, provided in compliance with ASME A13.1.
Condensate neutralization NYC Fuel Gas Code 2022, Section 307.2.1
Per FGC 307.2.1, acidic condensate from fuel-burning appliances and associated flues must be neutralized to a pH of at least 6 and not more than 8 prior to disposal to a sanitary system.
Total fall of horizontal drainage piping at minimum slopeFall = developed length (ft) x minimum slope; slope is 1/4 in/ft for pipe 2-1/2 in and smaller, 1/8 in/ft for 3 in to 6 in, and 1/16 in/ft for 8 in and larger (e.g., 90 ft of 6-in = 11-1/4 in; 24 ft of 2-in = 6 in; 120 ft of 10-in = 7-1/2 in).
Fresh air inlet sizeSize = 1/2 x building drain diameter at the point of connection, but not less than 3 in (6-in drain = 3 in; 8-in drain = 4 in).
Suds relief vent sizeSize = 3/4 x diameter of the piping in which the pressure zone occurs, but not less than 2 in (4-in stack = 3 in).
10-diameter rule at the base of a drainage stackHorizontal branches shall connect to the building drain not less than 10 x stack diameter downstream of the stack (5-in stack = 50 in); a vent stack connecting to the building drain must connect downstream of the drainage stack within 10 x stack diameter (4-in stack = 40 in).
Suds pressure zone in a vertical stackZone = 40 x stack diameter measured upward from the base fitting (4-in stack: 40 x 4 in = 160 in = 13 ft 4 in).
Drainage fixture units for continuous/semicontinuous flow1 gpm = 2 dfu (15 gpm = 30 dfu; adding a 2-dfu kitchen sink gives 32 dfu).
Static pressure loss or gain from elevation changepsi = 0.433 x elevation change in feet (20 ft above the source = 8.66 psi loss).
Pressure available to overcome pipe frictionAvailable psi = pressure at main - (highest fixture pressure + meter loss + tap loss + static head loss); where the main is ABOVE the highest outlet the elevation psi is a static gain that is added instead (example with main above: 60 - (8 + 6 + 0.9) + (14 x 0.433) = 51.16 psi; example with outlet above: 65 - (15 + 8 + 1.1 + 40 x 0.433) = 23.58 psi).
Trial pipe size — average pressure drop per 100 feet and equivalent lengthAverage drop = (psi available for friction x 100) / equivalent length of run (12 x 100 / 400 = 3.0 psi per 100 ft); where fitting and valve sizes are unknown, equivalent length = developed length x 1.5 (180 ft x 1.5 = 270 ft).
Roof area equivalent of continuous discharge to a storm drainEquivalent roof area = gpm x 32 sq ft (based on a 3 in/hr rainfall rate); 20 gpm x 32 = 640 sq ft.