EN ES
New York · CPS HR Consulting

New York City Master Plumber Exam

The New York City Master Plumber Exam is the written test administered by CPS HR Consulting for the NYC Department of Buildings, covering Drainage, Equipment, Gas Piping, Water Supply and Fire Protection. This guide breaks down each outline topic, shows sample questions and lists the suggested code references.

100 questions 240 minutes 70% to pass 5 topics 2:24 per question Closed book 434 questions in pool Bulletin: June 2025
Full practice exam $9.95
  • 100 questions on a 240-minute clock, like the real exam
  • Every answer explained; code questions cite the book and section so you can find it in your own copy
  • A fresh draw from 434 questions each attempt
Try 10 free questions
Study Course $59.95/month
  • Unlimited full exams, topic quizzes and study briefs
  • Cancel anytime
See the study course
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
On this page

NYC Master Plumber Exam: A Study Guide

The New York City Master Plumber Exam is the written examination administered by CPS HR Consulting for the New York City Department of Buildings. This guide walks through the official content outline topic by topic, shows sample questions from our practice bank, lists the recommended code references, and points you to the next steps.

New York City Master Plumber Exam at a Glance

Here are the key numbers and rules for the NYC DOB master plumber written exam:

Questions 100 questions
Time limit 4 hours
Passing score 70% correct
Books in the exam room Closed book (no books in the room)

On exam day

  • The written examination is computer-administered multiple-choice, while the practical examination requires producing two hands-on work specimens.
  • Candidates must present two forms of identification: a current, valid government-issued photo ID with signature matching the registration name, plus any non-expired photo ID.
  • Candidates should arrive at least 30 minutes before the written examination appointment and promptly at the call time for the practical examination.
  • No reference materials, notes or books may be brought into the testing site, and an administrator inspects candidates before the examination and collects any prohibited materials.
  • Scratch paper, pens/pencils and a calculator are provided, while personal notes, books, calculators, electronic devices, hats, extra pocket items, bags and weapons are prohibited.

Study references listed in the bulletin (not allowed in the exam room)

  • 2022 NYC Administrative Code, Title 28, Chapter 1: Administration; Chapter 2: Enforcement; Chapter 3: Maintenance of Buildings
  • 2022 NYC Construction Codes: Building Code, Chapter 1: Administration; Chapter 33: Safeguards During Construction or Demolition; Appendix G: Flood-Resistant Construction; Appendix Q: Modified National Standards for Automatic Sprinkler, Standpipe, Fire Pump, Fire Alarm, and Smoke Control Systems
  • 2022 NYC Construction Codes: Fuel Gas Code, Chapter 1: Administration; Chapter 3: General Regulations; Chapter 4: Gas Piping Installations
  • 2022 NYC Construction Codes: Plumbing Code, Chapter 1: Administration; Chapter 3: General Regulations; Chapter 4: Fixtures, Faucets and Fixture Fittings; Chapter 5: Water Heaters; Chapter 6: Water Supply and Distribution; Chapter 7: Sanitary Drainage; Chapter 8: Indirect/Special Waste; Chapter 9: Vents; Chapter 10: Traps, Interceptors and Separators; Chapter 11: Storm Drainage; Chapter 12: Special Piping and Storage Systems; Chapter 13: Nonpotable Water Systems; Appendix E: Sizing of Water Piping System

Scheduling, changes and retakes

  • The written examination is scheduled online through the link in the eligibility confirmation email, while CPS HR schedules the practical examination and sends a scheduling notice; scheduling questions go to CPS HR at 855-224-6977.
  • Candidates must be approved by the Department and receive an eligibility email before scheduling, and eligibility lasts six (6) months from the date the examination application is submitted.
  • A written examination appointment may be cancelled or rescheduled without losing the fee if notice is received two calendar days before the exam date, while a confirmed practical examination date may be changed only for a documented emergency.
  • Missing the appointment, arriving late (after the start time for the written exam, or more than 15 minutes after the call time for the practical), or lacking proper ID invalidates the appointment and forfeits the examination fee.
  • Written examination results are given as a printed score report immediately after testing showing overall score, grade and pass/fail, while practical results are mailed within four to six weeks.
  • A passing candidate must submit a Background Investigation Questionnaire in person within one year of passing the practical exam and, after receiving the notice of qualification, schedule an appointment with the Licensing & Exams Unit within one year to obtain the license.

Source: Candidate Information Bulletin – Master Plumber License Examinations, Last Updated 06.24.2025. Check the bulletin before test day: fees and rules can change.

What the Exam Covers

The outline divides the NYC master plumber exam into five topics.

Drainage — 21 items (21%)

Our study breakdown covers Installation; Maintenance; Inspection Requirements; Permits; Indirect/Special Waste; Sanitary Drainage; Storm Drainage; and Vents.

One rule our practice questions on this topic teach: horizontal branches shall connect to the base of a stack at a point not less than 10 times the diameter of the drainage stack downstream from the stack (NYC Plumbing Code 2022, Section 704.3).

Equipment — 23 items (23%)

Our study breakdown covers Installation (Equipment); Maintenance (Equipment); Inspection Requirements (Equipment); Permits (Equipment); Materials (Equipment); Limited Alterations; Applicability; and Fixtures, Faucets, and Fittings.

One rule our practice questions on this topic teach: Category 1 limited plumbing alterations permit the addition of not more than five plumbing fixtures or fixture connections in a building within any 12-month period (NYC Administrative Code Title 28 (2022), Art. 101, definition of "Limited Plumbing Alterations," Category 1).

Gas Piping — 29 items (29%)

Our study breakdown covers Installation (Gas); Maintenance (Gas); Inspection Requirements (Gas); Permits (Gas); Materials (Gas); Sizing (Gas); Gas Appliances; and Drips and Sloped Piping.

One rule our practice questions on this topic teach: corrosion protection of ferrous metal gas piping installed in buried locations is limited to bonded coatings or protective wrappings (NYC Fuel Gas Code 2022, Section 404.11.3).

Water Supply — 17 items (17%)

Our study breakdown covers Installation (Water); Maintenance (Water); Inspection Requirements (Water); Permits (Water); Water Recycling Systems; Water Distribution; Potable Water Protection and Cross-Connection Control; and Backflow Preventer Types, Standards, and Testing Requirements.

One rule our practice questions on this topic teach: a low-pressure cutoff is required on all house pumps filling a water tank and on booster pumps, set to prevent creation of a vacuum or negative pressure on the suction side when a positive pressure of 10 psi or less occurs on the suction side (NYC Plumbing Code 2022, Section 606.5.5).

Fire Protection — 10 items (10%)

Our study breakdown covers Standpipe and Sprinkler Installation; Standpipe and Sprinkler Maintenance; Inspection Requirements (Fire); Permits (Fire); fire protection during construction and demolition (standpipes, sprinklers, water supply); stationary fire pump installation requirements (NFPA 20 as modified for NYC); fire department connections (FDC) — placement, marking, and zoning; and standpipe system design requirements (pipe sizing, zones, pressure limits, water supply).

One rule our practice questions on this topic teach: in altering existing sprinkler systems containing 3/4-inch (19 mm) pipe, the existing 3/4-inch pipe shall be removed and replaced with pipe having a minimum diameter of 1 inch (25 mm), except as provided in the listed exceptions (NYC Building Code 2022, Section Q102 (NFPA 13 as modified), §8.15.20.4.4).

Sample Questions

Sample 1 — Water Supply

Question: A nonpotable water storage tank must be vented. On what basis is the required vent sized?

  • A. The peak demand of the conveyance system
  • B. The aggregate diameter of all tank influent pipes
  • C. The rated storage capacity of the tank
  • D. The diameter of the tank overflow pipe

Sample 2 — Fire Protection

Question: As the master plumber of record, you are preparing a newly installed stationary fire pump for its acceptance test in New York City. The New York City modifications to the fire pump standard add a testing provision requiring that the fire pump be equipped with which of the following?

  • A. A listed circulation relief valve
  • B. A listed flowmeter
  • C. A test header with four 2-1/2 in. outlets
  • D. A calibrated pitot gauge assembly

Sample 3 — Gas Piping

Question: As the licensed master plumber of record, you are designing a natural gas installation that will operate at elevated pressure. In addition to the general piping-system requirements of the Fuel Gas Code, compliance with Appendix G is required for installations operating at which pressure?

  • A. 2 psig or above
  • B. 5 psig or above
  • C. 15 psig or above
  • D. 25 psig or above

Sample 4 — Equipment

Question: A shower lining is being installed over a mortar bed in a field-built shower compartment. The liner must be recessed and fastened to an approved backing, and shall not be nailed or perforated at any point less than ___ above the finished threshold.

  • A. 1 inch
  • B. 3 inches
  • C. 2 inches
  • D. 6 inches

The answers are not shown here. Our free practice exam gives 10 questions per attempt from its own separate set of questions, and it can be retaken as often as you like.

Study Materials

The written exam is closed book. Four code references are recommended for this exam:

Our full practice exam gives you 100 questions on a 4 hours clock, drawn fresh from our question bank each attempt. After every attempt, the results page breaks your score down by outline topic.

Study Tips

  • Gas Piping is the heaviest topic at 29 items; plan your schedule around the item counts for all five topics.
  • This is a closed-book exam, so learn the rules themselves — the numbers, the limits and the conditions attached to them — rather than where to find them in a code book.
  • Work at about 2 minutes 24 seconds per question during practice so your timing on the real thing is familiar.
  • Answer the questions you know first, bookmark the rest, and come back to them with the time you have left.
  • Use the topic breakdown on your practice results to decide what to review next, then retake for a fresh draw.

Next Steps

The DOB NOW licensing portal and the official bulletin from CPS HR Consulting are the official sources for this exam. General license information is on the Department of Buildings website. To keep testing yourself, try our New York City master plumber license practice test.

Frequently Asked Questions

How many questions are on the NYC Master Plumber written exam, and how long do I have?
The written exam contains 100 multiple-choice questions and you have 4 hours to complete it.
What is the passing score for the NYC Master Plumber written exam?
You need to answer at least 70 questions correctly (70%) to pass the written exam.
How much does the NYC Master Plumber written exam cost, and how do I pay?
The written exam fee is $585, paid by eCheck or credit card through the DOB NOW Public Portal.
Is the NYC Master Plumber written exam open book? Can I bring notes or a calculator?
No, the exam is closed book — you may not bring reference materials, notes, or books. The testing center provides an online calculator, scratch paper, and pens.
What ID do I need to bring on exam day?
You must bring two forms of ID. The first must be a current, valid, government-issued photo ID that also bears your signature (such as a driver's license, state ID card, U.S. passport, military ID, or Permanent Resident card). The second can be any non-expired photo ID.
How do I schedule my NYC Master Plumber written exam?
Once the NYC DOB approves your application and notifies you by email that you are eligible, you schedule your exam online through Pearson VUE using the link provided in that email. You have six months from your application submission date to take the exam.
What happens if I fail the NYC Master Plumber written exam? How soon can I retake it?
If you fail, you must wait at least 14 days before reapplying and pay the full exam fee again. You may retake the written exam up to three times within a six-month period; if you fail three times within six months, you must wait six additional months before applying again.
What are the experience requirements to qualify for the NYC Master Plumber exam?
Applicants must generally have at least seven years of plumbing experience (within the prior ten years) under the direct supervision of a licensed Master Plumber, including at least two years as a DOB-registered Journeyman Plumber. Reduced experience requirements apply if you hold a bachelor's degree in mechanical engineering or are a licensed Registered Architect or Professional Engineer.
What subject areas are tested on the NYC Master Plumber written exam?
The exam covers five subject areas: Gas Piping (29 questions), Equipment (23 questions), Drainage (21 questions), Water Supply (17 questions), and Fire Protection (10 questions), all referencing the 2022 NYC Construction Codes and Administrative Code.
How long do I have to pass the practical exam after passing the written exam?
You must submit your practical exam application within two months of the date you are notified that you passed the written exam, and you have up to 24 months from that notification to pass the practical exam.
Took this practice exam? Tell other candidates how it went.
10 free questions30 min · no account