60 questions 120 minutes 70% to pass 7 topics 2:00 per question Open book
Try 10 free questions Free Cheat Sheet Official Bulletin

Practice at the real exam's pace

Every practice exam shows your time per question against the real exam's clock (2:00 here), and each topic lands in one of these:

Ready Find it faster Study it Needs both Rushing: slow down

What's on the exam

Questions per topic, out of 60
Safety6
Insulation1
Windows and Doors3
Rough Carpentry and Formwork27
Finish Carpentry14
Drywall7
Siding2

Topics

Open a topic to read its key concepts

Safety

6 on exam · 19 practice questions

Key Concepts

Employer/employee responsibilities - The employer is responsible for requiring the wearing of appropriate PPE in all operations with exposure to hazardous conditions (§1926.28(a)). - PPE standards impose a separate compliance duty for each employee; each failure to provide PPE to an employee may be a separate violation (§1926.20(f)(1)). Training standards work the same way — each failure to train an employee may be a separate violation (§1926.20(f)(2)). - The employer must initiate and maintain safety programs, provide for frequent and regular inspections by competent persons, and permit only employees qualified by training or experience to operate equipment (§1926.20(b)(1)–(4)). - Machinery, tools, or equipment not in compliance is prohibited and must be tagged or locked to render controls inoperable, or physically removed (§1926.20(b)(3)). - OSHA issues and enforces standards, conducts inspections, and assesses fines; employers must keep the workplace free of recognized hazards, train for hazardous work and PPE use, and comply with record-keeping and accident-reporting standards. Employees must comply with OSHA regulations (Carpentry and Building Construction, Construction Safety & Health).

Insulation

1 on exam · 14 practice questions

The verified questions cluster tightly in Sections 31.1 and 31.2 of Carpentry and Building Construction.

Key Concepts

Insulation and R-value basics - Insulation is any material that slows the transmission of heat, sound, or electricity. Thermal insulation slows the transmission of heat through walls, floors, and ceilings (Section 31.1). - R-value measures a material's ability to resist heat transmission. It varies with thickness but is cumulative — insulation rated R-5 per inch gives R-10 at two inches. The higher the R-value, the better a material insulates (Section 31.1 — R-Value Basics). - When choosing type and amount of insulation, climate is the primary factor. The 2006 IRC divides the United States into eight climate zones, with edges defined by county lines, and four climate types: Marine, Dry, Moist, and Warm-Humid. Code figures are minimums; builders may exceed them (Section 31.1).

Building envelope / where to insulate - All walls, ceilings, roofs, and floors separating heated from unheated spaces should be insulated. This continuous layer is the building envelope: everything inside is heated and/or cooled, everything outside is exposed to outdoor temperatures (Section 31.1 — Where to Insulate). - In a **one-and-a-half-story house, second floor knee walls should be treated…

Windows and Doors

3 on exam · 23 practice questions

Key Concepts

Window types and components - A casement window has a side-hinged sash that swings inward or outward. Its advantage over the double-hung type is that the entire window area can be opened for ventilation (Windows & Skylights chapter, Types of Windows section). - A muntin is a vertical or horizontal piece within a sash that holds a pane of glass; muntins historically held groups of small panes together to form a single window. A mullion strip is a vertical piece separating combined window units (Windows & Skylights chapter, Double-Hung Windows section).

Window code requirements - Egress windows must have an unblocked open area of not less than 5.7 sq. ft., except windows on the grade floor, which require not less than 5.0 sq. ft. (Windows & Skylights chapter, Design Requirements section). - Total openable window area for ventilation must be not less than 4 percent of floor area, unless mechanical air conditioning and ventilation are provided. (The 8 percent figure applies to glass area for natural light, not ventilation.) (Windows & Skylights chapter, Design Requirements section).

Rough Carpentry and Formwork

27 on exam · 285 practice questions

Key Concepts

Sizing basis and nominal vs. actual - Computations to determine required sizes of members shall be based on net dimensions (actual sizes), not nominal sizes (IBC 2304.2). Where dimensions of lumber are specified in Chapter 23, they are deemed nominal unless designated actual (IBC 2301.2). A 2×4 stud actually measures about 1½ × 3½ inches (Carpentry and Building Construction, Section 12.1, Page 325).

Floor framing - A wood post supporting a girder must be solid and not less than 4×4 (often 6×6), with flat, securely fastened ends (Page 396). - Girders for single-story construction or supporting a single floor: not less than 4" × 6" for spans 6 feet or less, spaced not more than 8 feet o.c.; girder end joints occur over supports; ends bearing on masonry or concrete need not less than 3 inches of bearing (IBC 2308.4.1). A girder framed into a masonry pocket needs ½-inch clearance at tops, sides, and ends to prevent moisture absorption (Chapter 15, Built-Up Girder, Pages 399–401). - Joist ends: 1½ inches bearing on wood or metal, 3 inches on masonry (IBC 2308.4.2.2). - Holes in solid-wood floor joists must be at least 2 inches from top and bottom…

Finish Carpentry

14 on exam · 150 practice questions

Key Concepts

Stair parts (Ch. 25, Sec. 25.1) - A stringer may also be called a string, a carriage, or a horse; it supports treads and risers. - A baluster is the vertical member supporting the handrail on open stairs; the whole system of balusters, handrails and supports is a balustrade. Newel posts — not balusters — are the primary support for the handrail (Sec. 25.2). - An angle newel supports the handrail at landings where the stair changes direction; a landing (starting) newel sits at the bottom. - A gooseneck is the curved piece between the main handrail and a newel post (Sec. 25.1, p. 738). - A bullnose starting step is a first step lengthened and rounded at one or both ends. - A skirtboard is a finished board nailed to the wall before the stringers; risers and treads butt to it (Sec. 25.2, p. 751).

Drywall

7 on exam · 70 practice questions

Key Concepts

Panel types - Type-X fire-code drywall is 5/8″ thick and contains glass fibers that prevent it from crumbling in extreme heat. Type-C is even more fire resistant and contains vermiculite. (Carpentry and Building Construction, Ch. 32, Fire-Code Drywall) - Edges along the length of a panel are tapered so joints can be filled with compound and smoothed flush. (Ch. 32, Standard Drywall) - Glass-mat gypsum board ("paperless drywall") has front and back surfaces covered by thin fiberglass instead of paper; it is approved as backing in shower stalls and tub/shower surrounds. Starting with the 2006 IRC, green board is no longer allowed there except on ceiling surfaces; cement board, fiber-cement backer board, and glass-mat gypsum board may be used. (Ch. 32, Moisture-Resistant Drywall; Ch. 32, p. 917) - IBC 2509.3: water-resistant gypsum backing board shall not be used over a vapor retarder in shower or bathtub compartments, nor where there is direct exposure to water or continuous high humidity. IBC 2509.2 permits it as a base for tile in water closet compartment walls. (2021 IBC, §2509.3, §2509.2)

Siding

2 on exam · 23 practice questions

Mississippi Carpentry

Key Concepts

Definition and code language - Siding is the exterior wall covering of a house; its purpose is to shed rain and protect the structural portions of walls. Installation normally begins after windows and doors are in place and after the roofing is installed (Ch. 23 — Understanding Siding). - The IRC refers to siding as "exterior wall covering"; these materials provide weather resistance to the "exterior wall envelope" (Ch. 23 — Builder's Tip: Code Terminology).

Moisture prevention - Exterior walls must provide a weather-resistant exterior wall envelope including flashing, a water-resistive barrier behind the exterior veneer, and a means for draining water that enters the assembly (IBC 1402.2). - Not fewer than one layer of water-resistive barrier must be attached to the studs or sheathing with flashing; acceptable barriers include No. 15 felt complying with ASTM D226, Type 1, and ASTM E2556, Type I or II (IBC 1403.2). - No. 15 (15 lb.) building paper is the minimum weight required by code beneath siding (Ch. 23 — Preventing Moisture Problems / Building Paper). - Building paper: lap vertical joints at least 6 inches; lap horizontal courses at least 2 inches over previously applied strips (Ch.…

Final Practice Exam
60 questions · 120 min · timed simulation of the real exam
Never the same exam twice. Every attempt is drawn fresh from 584 questions, about 9 full exams' worth, and questions you haven't seen come first.
Law and Business Exam included
11 topics · 50 questions · 120 min

Required Books

Open-book exam
OSHA Standards for the Construction Industry
Buy on Amazon
2021 Edition
International Building Code 2021
Buy on Amazon
Carpentry and Building Construction
Buy on Amazon
2018 (upd. 2020)
BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses
Buy on Amazon
7th Edition
Gypsum Construction Handbook
Buy on Amazon
Finish Carpenter's Manual
Buy on Amazon
The Complete Illustrated Guide to Furniture and Cabinet Construction
Buy on Amazon
6th Edition
NASCLA Contractors Guide to Business, Law and Project Management - Mississippi - 6th Edition
Buy on Amazon
As an Amazon Associate we earn from qualifying purchases.
$59.95/monthCancel anytime. Instant access.