South Carolina - Bridges Exam: A Practical Study Guide
The South Carolina - Bridges exam tests the rules and the reference books behind the work. This guide lays out the job: the key facts from the official bulletin, what the exam covers, the books you need, sample questions with answers, and how to get ready. PSI gives the exam.
The South Carolina - Bridges Exam at a Glance
Here's the rundown from the official bulletin:
| Questions | 50 questions |
| Time limit | 3 hours |
| Passing score | 35 correct answers out of 50 scored questions |
| Books in the exam room | Open book |
| Exam fee | $64 |
On exam day
- One valid, unexpired signature- and photo-bearing government ID matching the registered legal name is required at the test site.
- Candidates should arrive at the examination site at least 30 minutes before their appointment.
- The examinations are open book; books must be otherwise unmarked and contain no additional papers, and proctors inspect all books before and after the exam.
- Books may be highlighted, underlined and indexed but not written in, and only permanent tabs that would tear the page if removed are allowed.
- Only silent, battery-operated, non-programmable calculators without paper tape printing or an alphabetic keyboard are allowed.
- Only approved items may be taken into the examination room and all personal belongings, including electronic devices, writing devices, reading material, food and drinks, must be stored in the secure storage provided.
References you may bring
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA) -OR- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI (with latest available amendments)
- Standard Specifications for Highway Construction -OR- Standard Specifications for Highway Construction Selections as of 2007 by PSI
- The Contractor's Guide to Quality Concrete Construction (2005, 3rd Edition)
- South Carolina 811 Excavator Manual (latest edition)
Scheduling, changes and retakes
- Candidates schedule online at https://test-takers.psiexams.com/sccon or by calling PSI at (855) 340-3701.
- Minimum qualification must be met before registering, and the Registration Confirmation Notice issued after PSI approval is valid for one year or until an examination classification has been failed twice within the referenced time frame.
- Candidates may cancel and reschedule without forfeiting the fee if notice is received 2 days before the examination date, and voice mail or email is not acceptable notice.
- Candidates who fail to cancel on time, do not appear, arrive after the examination start time, or lack proper ID have their registration invalidated and forfeit the examination fee.
- Results are given immediately on screen, with a performance summary for passers and a printed diagnostic report for those who fail.
- Each classification examination (except Burglar and Fire Alarm) may be taken only twice in a 12-month period and thereafter only once in six months, and a passed exam may not be retaken.
- After passing the required examinations, the candidate submits the commercial license application with the documented experience affidavit.
Source: Commercial Contractor Candidate Information Bulletin, Updated 9/15/2026. Check the bulletin before test day: fees and rules can change.
What the South Carolina - Bridges Exam Covers
The official content outline breaks the exam into 9 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Concrete | 12 | 24% |
| Concrete - Reinforcing Steel | 5 | 10% |
| Concrete Formwork | 4 | 8% |
| Structural Steel | 8 | 16% |
| Pile Driving/Sitework | 8 | 16% |
| Paving | 3 | 6% |
| Safety - Code of Federal Regulations | 5 | 10% |
| Estimating | 3 | 6% |
| Business – Math | 2 | 4% |
How to Get Ready for the South Carolina - Bridges Exam
Treat your reference books like your tools. On an open-book exam you don't need every rule memorized. You need to know which book holds it and where to find it.
Buy the books the bulletin lists, in the editions it names. An older or newer edition can put the answer on a different page, or change it.
Learn your way around each book before you study anything else. The table of contents and the index are your layout.
Highlight what you look up most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Put in the reps with timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 3 minutes 36 seconds per question.
Measure twice. When you miss a practice question, find the section in your book, read it and mark it. Keep at it until you pass practice exams consistently.
The Books for the South Carolina - Bridges Exam
The bulletin lists the Bridges reference books.
Where to get them:
- OSHA 29 CFR 1926
- The Contractor's Guide to Quality Concrete Construction
- SC 811 Excavator Manual (2026)
- SCDOT Std Specs 2007
Working the Exam on Test Day
Work the exam in two passes. On the first pass, answer everything you know and bookmark the rest. Every exam lets you come back to bookmarked questions, though some lock the ones you've seen once you take a break. On the second pass, go back to your bookmarks and take them one at a time.
Don't get hung up on one question. You have 3 hours for 50 questions, which is about 3 minutes 36 seconds per question. Before you finish, make sure nothing is left blank.
Study Tips
On an open-book exam, the winners aren't the smartest people in the room — they're the fastest at finding answers. Buy the required book, practice with it open, and tab and highlight each section the first time a question sends you there. Learn the index and table of contents until you can land on any topic in seconds. That speed is what separates a pass from a fail.
On an open-book exam, work through every question once: answer the ones you know and skip the ones you don't. Then go back to the ones you flagged. You can bookmark questions for later review, just like on our exams — and don't sink too much time into any single question. The clock is still running.
Give yourself at least three to six weeks. Use your exam's candidate bulletin as your roadmap for what's tested, and spend your time on finding-it-fast skills over rote memorization. In practice, aim for three clean passes at 80% or higher — setting your practice bar above the real cut score gives you a comfortable margin on test day.
Practicing against a ticking clock is the best way to beat exam-clock anxiety. Use these timed tests to build your pacing, so you learn to move steadily and never burn too long on a single question. By test day, the format feels routine.
Sample South Carolina - Bridges Questions
These come from our practice question bank, each with its answer and the reference behind it.
Sample 1 — Concrete - Reinforcing Steel
Question: You are a commercial concrete contractor managing a large warehouse slab pour. The pour runs late, and the crew plans to resume the next morning. At the stopping point, there will be no aggregate interlock across the joint. What load transfer device is generally recommended, and what is the typical diameter relative to slab thickness?
- A. Keyed joints at 1/3 slab thickness
- B. Smooth dowel bars at 1/4 slab thickness
- C. Smooth dowel bars at 1/8 slab thickness
- D. Deformed tie bars at 1/4 slab thickness
Correct Answer: C
At a construction joint, there is no aggregate interlock, so a load transfer device is needed. Dowel bars should generally have a diameter of 1/8 the slab thickness and be spaced at 12 in. (300 mm) on center. Keyed joints are no longer recommended because unreinforced joints lose contact when the joint opens due to drying shrinkage (ACI 302.1R).
Reference: Contractor's Guide to Quality Concrete Construction (4th ed.), Chapter 8 – Joints and Reinforcement for Slabs-on-Ground, Page 125
Sample 2 — Safety - Code of Federal Regulations
Question: As the contractor on a bridge approach project, your crew is opening a 7-foot-deep trench through a former landfill area where methane may be present. Atmospheric testing is performed before entry. Under OSHA construction excavation rules, adequate precautions such as ventilation must be taken to prevent employee exposure to an atmosphere containing a flammable gas concentration in excess of what portion of the lower flammable limit?
- A. 15 percent
- B. 20 percent
- C. 10 percent
- D. 5 percent
Correct Answer: B
29 CFR 1926.651(g)(1)(iii) requires adequate precautions, such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 20 percent of the lower flammable limit of the gas. (The 10 percent LFL figure is the threshold used in the confined spaces standard's definition of hazardous atmosphere at 1926.1202, not the excavation standard.) Testing itself is required before employees enter excavations greater than 4 feet deep where oxygen deficiency — below 19.5 percent oxygen — or another hazardous atmosphere exists or could reasonably be expected.
Reference: OSHA 29 CFR 1926, §1926.651(g)(1)(iii)
Sample 3 — Concrete Formwork
Question: What percentage range of the total cost of a concrete structure is typically attributed to formwork?
- A. 35 to 60 percent
- B. 10 to 25 percent
- C. 25 to 35 percent
- D. 60 to 80 percent
Correct Answer: A
According to the Contractor's Guide to Quality Concrete Construction, formwork costs range from 35 to 60 percent of the cost of a concrete structure, making it one of the most significant cost components in concrete construction.
Reference: Contractor's Guide to Quality Concrete Construction (4th ed.), Page 54
Sample 4 — Paving
Question: A small fixed-form paving area has been approved on your project and you want to use built-up forms. What is the maximum total project area of pavement of that specified thickness that permits built-up forms, and the maximum amount the build-up may extend the form depth?
- A. 1,000 square yards; 10 percent
- B. 5,000 square yards; 25 percent
- C. 3,000 square yards; 25 percent
- D. 3,000 square yards; 50 percent
Correct Answer: C
SCDOT Subsection 501.3.8 prohibits built-up forms except where the total area of pavement of any specified thickness on the project is less than 3,000 square yards, and then the build-up may extend the form depth up to 25 percent. The build-up must be securely attached to the bottom of the form.
Reference: SCDOT Standard Specifications for Highway Construction, Section 501, Pages 258-259
Why Practice Online Instead of With a PDF
A PDF is like reading about a job instead of doing it. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results break your score down by topic so you know where to put in more work.
Get Started
Take the free South Carolina - Bridges practice exam to see where you stand, then put your time into the topics that need it. For the official rules, read the exam bulletin, and see the licensing board's website.