80 questions 240 minutes 70% to pass 9 topics 3:00 per question Open book 368 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real Pearson VUE test format.

  • 80 questions (same as real exam)
  • 240 minute time limit
  • 9 topic areas covered
  • 368 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 9 topic quizzes and this full exam. $59.95/month.
See the study course

ICC R17 Journeyman Electrician (2023 NEC) Practice Exam Guide

Built from the official Pearson VUE exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 80
Wiring Methods and Materials21
Branch Circuits and Conductors15
Equipment and Devices10
Services and Service Equipment9
Special Occupancies, Equipment, and Conditions9
General Knowledge5
Motors and Generators5
Feeders3
Control Devices3

This practice exam is laid out like the official content outline for the ICC R17 Journeyman Electrician (2023 NEC) exam: General Knowledge, Services and Service Equipment, Feeders, Branch Circuits and Conductors, Wiring Methods and Materials, Equipment and Devices, Control Devices, Motors and Generators, Special Occupancies, Equipment, and Conditions.

Two ways to practice: the free practice exam gives you 10 questions per attempt, as often as you want. The full practice exam gives you 80 questions on a 4 hours clock, with a new draw from our question bank every time.

9 topics

General Knowledge 5 items

Our study plan for this topic: Electrical Theory and General Electrical Load Calculations; Code Definitions and Terms; Plan Reading; AC Circuit Properties: Impedance, Reactance, and Inductance; Power Factor, Power Factor Correction, and Capacitors; NEC Purpose, Scope, and Code Arrangement (Article 90); Series, Parallel, and Combination Circuit Analysis; Electrical Distribution Systems and Wiring Diagrams.

Services and Service Equipment 9 items

The outline lists: Services and Fault Current; Service Load Calculations; Service Equipment & Service Conductors; Transformers; System Grounding and Bonding; Temporary Service Wiring; Service disconnecting means requirements and ratings; Overcurrent protection for services and ground-fault protection of equipment.

Feeders 3 items

Our study plan for this topic: Load Calculations; Equipment Grounding; Feeder conductor sizing (minimum ampacity and continuous vs. noncontinuous loads); Overcurrent protection for feeders; Feeder neutral conductor sizing; Demand factors for dwelling and non-dwelling loads; Outside feeder installation requirements (clearances, supports, and wiring methods); Feeder disconnecting means requirements (rating, location, and number).

Branch Circuits and Conductors 15 items

Our study plan for this topic: Branch Circuit Calculation; Overcurrent Protection; Conductors; Required Outlets & GFCI/AFCI Protection; Equipment Grounding; Voltage Drop Calculations for Branch Circuits; Conductor Ampacity Correction and Adjustment Factors; Conductor Insulation Types and Applications.

Wiring Methods and Materials 21 items

The outline lists: Raceway Installations; Underground Wiring Methods; Boxes and Enclosures; Cabinets, Panelboards, & Switchboards; Clearance and Guarding; Flexible Cords and Cables; Cable Wiring Methods (NM, AC, MC, MI, SE, UF, TC, ITC, and specialty types) — Uses Permitted and Not Permitted; Conduit Bending Calculations and Techniques.

Equipment and Devices 10 items

Our study plan for this topic: Luminaires; Receptacles, Switches and Other Devices; Appliances and Other Equipment; Other Utilization Equipment; Heating and Cooling Equipment; Fixture Wire Types, Ampacity, and Installation Requirements; Lighting Track Installation, Construction, and Restrictions; Low-Voltage Lighting System Requirements and Voltage Limitations.

Control Devices 3 items

Our study plan for this topic: Switches, Disconnects and Controllers; Motor controller ratings, markings, and horsepower requirements; Motor control circuit overcurrent protection and wiring methods; Motor disconnecting means types, location, and current ratings; Motor overload protection devices and settings; Stop-start stations, jogging circuits, and hand-off-automatic control schemes; Industrial control panel overcurrent protection, short-circuit current rating, and marking; Class 1 power-limited remote-control and signaling circuit requirements.

Motors and Generators 5 items

Our study plan for this topic: Motors; Generators; Motor branch-circuit conductor sizing (125% rule and special motor types); Motor overload protection selection and trip current percentages; Motor branch-circuit short-circuit and ground-fault protective device ratings (Table 430.52); Motor disconnecting means requirements and location; Motor controllers — ratings, types, and marking requirements; Motor control centers — overcurrent protection, grounding, and busbar arrangements.

Special Occupancies, Equipment, and Conditions 9 items

The outline lists: Special Occupancies; Swimming Pools and Similar Installations; Mobile Home and RV Parks; Data Processing Equipment; Miscellaneous Special Equipment; Emergency Systems; Signaling and Fire Alarm Systems; Hazardous Location Classification (Classes, Divisions, and Zones).

3 questions

Sample 1 — Wiring Methods and Materials

Question: A 480V switchboard has exposed live parts front and rear. What is minimum working clearance required?

  • A. 3 ft
  • B. 4 ft
  • C. 5 ft
  • D. 6 ft

Correct Answer: B

Exposed live parts on both sides = Condition 3; Table 110.26(A)(1), 151–600V → 4 ft.

Reference: NEC 2023 Table 110.26(A)(1)

Sample 2 — Branch Circuits and Conductors

Question: You are sizing branch circuit conductors for a commercial building's lighting system that operates as a continuous load. The continuous lighting load is 16 amperes and there are no noncontinuous loads on the circuit. What is the minimum ampere rating of the overcurrent protective device for this branch circuit?

  • A. 16 amperes
  • B. 18 amperes
  • C. 20 amperes
  • D. 25 amperes

Correct Answer: C

Per NEC 210.20(A), where a branch circuit supplies continuous loads, the rating of the overcurrent device shall not be less than 125 percent of the continuous load. 16 amperes × 1.25 = 20 amperes. The minimum overcurrent protective device rating is 20 amperes.

Reference: NEC 2023 Section 210.20(A)

Sample 3 — Equipment and Devices

Question: What is the maximum distance between supports for lighting track sections that are 1.2 m (4 ft) or shorter in length?

  • A. One support per section
  • B. Two supports minimum for each section
  • C. Three supports evenly spaced
  • D. Support every 600 mm (24 in.)

Correct Answer: B

According to NEC 410.154, a single section 1.2 m (4 ft) or shorter in length shall have two supports, and where installed in a continuous row, each individual section of not more than 1.2 m (4 ft) in length shall have one additional support.

Reference: NEC 2023 Section 410.154

Your first attempt is an inspection, not a final grade. The results page breaks your score down by outline topic, so you can see which areas need work. Compare it with the real exam's passing score, 70% correct, and keep practicing until you pass consistently.

  • Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
  • Work your bookmarks on the second pass.
  • Keep your pace. The real exam works out to about 3 minutes per question.
  • After each attempt, look up each missed question's reference in your book and read the section.

Questions 80 questions
Time limit 4 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $120
  • Results for examinations taken electronically are available immediately after the examination is completed.
  • You must wait 10 days before retaking a failed exam.

Source: National Contractor/Trades Examination Information Bulletin, PUBLISHED June 30, 2026; ICC Exam Catalog, checked September 27, 2026. Check the bulletin before test day: fees and rules can change.

Reference books

2 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account