Idaho · PSI

Idaho Limited Electrical Photovoltaic Installer Practice Exam

60 questions 180 minutes 70% to pass 10 topics 3:00 per question Open book 316 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 60 questions (same as real exam)
  • 180 minute time limit
  • 10 topic areas covered
  • 316 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 10 topic quizzes and this full exam. $59.95/month.
See the study course

Idaho Limited Electrical Photovoltaic Installer Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 60
2017 National Electrical Code, NFPA – Chapter 610
2017 National Electrical Code, NFPA – Chapter 17
2017 National Electrical Code, NFPA – Chapter 27
2017 National Electrical Code, NFPA – Chapter 36
2017 National Electrical Code, NFPA – Chapter 46
2017 National Electrical Code, NFPA – Chapter 56
2017 National Electrical Code, NFPA – Introduction5
2017 National Electrical Code, NFPA – Chapter 75
2017 National Electrical Code, NFPA Calculations – Chapters 4 and 95
2017 National Electrical Code, NFPA – Chapter 93

This practice exam follows the official content outline for the Idaho Limited Electrical Photovoltaic Installer exam: 2017 National Electrical Code, NFPA – Introduction, 2017 National Electrical Code, NFPA – Chapter 1, 2017 National Electrical Code, NFPA – Chapter 2, 2017 National Electrical Code, NFPA – Chapter 3, 2017 National Electrical Code, NFPA – Chapter 4, 2017 National Electrical Code, NFPA – Chapter 5, 2017 National Electrical Code, NFPA – Chapter 6, 2017 National Electrical Code, NFPA – Chapter 7, 2017 National Electrical Code, NFPA – Chapter 9, 2017 National Electrical Code, NFPA Calculations – Chapters 4 and 9.

  • Free practice exam: 10 questions per attempt, retake as often as you like.
  • Full practice exam: 60 questions on a 3 hours clock, a new draw from our bank every attempt.

10 topics

2017 National Electrical Code, NFPA – Introduction 5 items

Our study plan for this topic: Purpose and scope of the NEC (practical safeguarding of persons and property); NEC scope: covered and excluded installations (Article 90.2); Code arrangement: chapters, their hierarchy, and how they apply (Article 90.3); Authority having jurisdiction (AHJ): enforcement powers and special permissions (Article 90.4); Mandatory vs. permissive rules vs. explanatory material (Article 90.5); Equipment examination, listing, and approval for safety (Article 90.7); Wiring planning for future expansion and circuit limitations in enclosures (Article 90.8); Units of measurement: SI and inch-pound dual system and compliance (Article 90.9).

2017 National Electrical Code, NFPA – Chapter 1 7 items

Our study plan for this topic: Article 100 key definitions for PV and electrical installations (e.g., photovoltaic system, interactive system, stand-alone system, hybrid system, charge controller); Equipment approval, listing, labeling, and identification requirements; Electrical connections: terminals, splices, conductor materials, and temperature limitations; Working space and clearance requirements around electrical equipment; Guarding of live parts and arc-flash hazard warning marking; Equipment marking requirements: manufacturer identification, ratings, and field-applied hazard labels; Wiring integrity, wiring methods, and conductor sizing standards; Enclosure type selection for indoor and outdoor environments.

2017 National Electrical Code, NFPA – Chapter 2 7 items

Our study plan for this topic: Grounding and bonding requirements for PV and electrical systems (Article 250); Grounding electrode system types, installation, and sizing; Equipment grounding conductor types, identification, and sizing; Branch circuit requirements, ratings, and GFCI/AFCI protection (Article 210); Branch-circuit, feeder, and service load calculations (Article 220); Service conductor installation, disconnecting means, and overcurrent protection (Article 230); Overcurrent protection devices, ratings, and location requirements (Article 240); Surge-protective device (SPD) types, installation, and connection requirements (Article 285).

2017 National Electrical Code, NFPA – Chapter 3 6 items

Our study plan for this topic: Conductor ampacity tables and temperature rating corrections (Article 310); Conductor insulation types, applications, and marking requirements; Conductors in parallel — requirements and restrictions; General wiring methods — protection against physical damage and underground installation requirements (Article 300); Outlet, device, pull, and junction box sizing, fill calculations, and support (Article 314); Raceway types — permitted uses, securing, supporting, and bending requirements (EMT, RMC, IMC, FMC, LFMC, PVC, LFNC); Cable wiring methods — permitted uses and installation requirements (Type MC, NM, UF, SE/USE); Cabinets, cutout boxes, and enclosures — conductor deflection, wiring space, and installation (Article 312).

2017 National Electrical Code, NFPA – Chapter 4 6 items

Our study plan for this topic: Transformer overcurrent protection requirements (Articles 450.3, 450.4); Transformer installation types and location requirements (dry-type, oil-insulated, liquid-filled); Transformer vault construction, ventilation, and access requirements; Switchboard, switchgear, and panelboard overcurrent protection and grounding; Switch installation, ratings, and connection requirements; Storage battery installation, disconnecting means, and ventilation; Generator overcurrent protection, conductor ampacity, and disconnecting means; Flexible cord and cable uses, ampacity, and prohibited applications.

2017 National Electrical Code, NFPA – Chapter 5 6 items

Our study plan for this topic: Classification of hazardous locations (Class I, II, III; Divisions 1 and 2; Zones 0, 1, 2, 20, 21, 22); Wiring methods and sealing requirements in Class I, II, and III locations; Protection techniques for hazardous locations (explosionproof, intrinsically safe, flameproof, pressurization, encapsulation); Electrical requirements for specific hazardous occupancies (commercial garages, aircraft hangars, motor fuel dispensing facilities, bulk storage plants, spray application areas); Essential electrical systems and wiring requirements for health care facilities; Electrical installations for mobile homes, manufactured homes, recreational vehicles, and park trailers; Wiring methods and grounding for marinas, floating buildings, and agricultural buildings; Temporary electrical installations and wiring for assembly occupancies, theaters, and similar locations.

2017 National Electrical Code, NFPA – Chapter 6 10 items

Our study plan for this topic: PV system definitions and terminology (Article 690 Part I); Maximum voltage calculations for PV source and output circuits; Circuit sizing and maximum current calculations for PV systems; Overcurrent protection requirements for PV system DC circuits; PV system disconnecting means requirements and ratings; Wiring methods, conductor types, and labeling for PV system DC circuits; System grounding, equipment grounding, and bonding for PV arrays; Required markings and labels for PV system components and disconnects.

2017 National Electrical Code, NFPA – Chapter 7 5 items

Our study plan for this topic: Interconnected electric power production sources: point of connection and equipment approval (Article 705); Disconnecting means requirements for interconnected systems and energy storage systems; Energy storage system (ESS) classification, circuit sizing, and overcurrent protection (Article 706); ESS location requirements: ventilation, guarding, working space, and egress; Charge control and diversion charge controller requirements for ESS; Stand-alone system wiring, equipment approval, and capacity requirements (Article 710); DC microgrid system grounding, ground-fault detection, and arc fault protection (Article 712); Loss of primary source disconnection and anti-islanding requirements.

2017 National Electrical Code, NFPA – Chapter 9 3 items

Our study plan for this topic: Conduit and tubing fill percentages (Table 1 — 1, 2, and over 2 conductors); Conduit bend radius requirements (Table 2); Cross-sectional area and fill calculations for specific conduit types (EMT, RMC, IMC, PVC, FMC, LFMC, LFNC); Insulated conductor dimensions and cross-sectional areas by wire type and AWG size (Table 5); Compact conductor nominal dimensions and areas (Table 5A); Bare conductor properties, DC resistance, and stranding data (Table 8); AC resistance and reactance for conductors in conduit, including effective impedance at 0.85 power factor (Table 9); Conductor stranding classes by size for copper and aluminum (Table 10).

2017 National Electrical Code, NFPA Calculations – Chapters 4 and 9 5 items

Our study plan for this topic: PV source and output circuit current calculations (Article 690.8); Maximum PV system voltage determination and temperature correction factors (Article 690.7); Conductor ampacity tables and temperature correction/adjustment factors (Article 310.15); Branch-circuit, feeder, and service load calculations (Article 220); Motor branch-circuit conductor sizing and full-load current tables (Article 430.22 and Tables 430.247–430.250); Motor branch-circuit short-circuit and ground-fault protective device ratings (Table 430.52); Conduit fill calculations using Chapter 9 Tables 1, 4, and 5; Overcurrent protection sizing for PV system dc circuits (Article 690.9).

3 questions

Sample 1 — 2017 National Electrical Code, NFPA – Chapter 6

Question: You are installing a PV system on a commercial building with multiple parallel-connected strings of modules. An overcurrent device is required at the connection point to each string. In what polarity position must all of the single overcurrent protective devices be placed within the PV system?

  • A. Alternating between positive and negative for each string
  • B. In the negative polarity for all circuits
  • C. In the same polarity for all circuits within a PV system
  • D. In whichever polarity the installer selects per string

Correct Answer: C

Per NEC 690.9(C), where single overcurrent protection devices are used to protect PV source or output circuits, all overcurrent devices shall be placed in the same polarity for all circuits within a PV system.

Reference: NEC 2017 Section 690.9(C)

Sample 2 — 2017 National Electrical Code, NFPA – Chapter 1

Question: Per NEC Article 100, a ______ is defined as 'an organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure.'

  • A. Competent Person
  • B. Designated Official
  • C. Qualified Inspector
  • D. Authority Having Jurisdiction (AHJ)

Correct Answer: D

Per NEC Article 100, the Authority Having Jurisdiction (AHJ) is defined as 'An organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure.' The AHJ plays a critical role in the approval and enforcement process described throughout the NEC.

Reference: NEC 2017 Article 100 (Definitions)

Sample 3 — 2017 National Electrical Code, NFPA – Chapter 2

Question: A 400 A service uses 600 kcmil copper service conductors. What is the minimum size of a copper grounding electrode conductor that runs only to a concrete-encased electrode?

  • A. 2 AWG
  • B. 4 AWG
  • C. 3/0 AWG
  • D. 1/0 AWG

Correct Answer: B

Table 250.66 would require a 1/0 AWG copper grounding electrode conductor for 600 kcmil copper service conductors, but 250.66(B) says a grounding electrode conductor (or bonding jumper) that runs only to a concrete-encased electrode is not required to be larger than 4 AWG copper. So the minimum size required here is 4 AWG copper.

Reference: NEC 2017 Section 250.66(B), Table 250.66

  • Your results break the score down by outline topic.
  • The real exam's passing score: a minimum score of 70.
  • Keep practicing until you pass consistently, not just once.

  • Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
  • Work your bookmarks on the second pass.
  • Real exam pace: about 3 minutes per question.
  • After each attempt, look up every miss in your book.

Questions 60 questions
Time limit 3 hours
Passing score a minimum score of 70
Books in the exam room Open book
Exam fee $75
  • Your score is shown on screen at the end of the exam and a score report is provided, with a diagnostic report of strengths and weaknesses if you fail.
  • If you do not pass, you may retake the exam as many times as needed, paying an examination fee for each attempt.

Source: Examination Scheduling Procedures / Examination Guide (Idaho PSI Candidate Bulletin), Effective 7/9/2026. Check the bulletin before test day: fees and rules can change.

Reference books

4 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account