Oregon Construction Contractor Exam (CCB) Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 80 questions (same as real exam)
- 180 minute time limit
- 14 topic areas covered
- 365 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Oregon Construction Contractor (CCB) Practice Exam Guide
What's on the exam
Questions per topic, out of 80This practice exam follows the official content outline for the Oregon Construction Contractor (CCB) exam: Oregon Construction Contractor Laws and Regulations, Choosing Your Business Structure, Hiring and Managing Employees, Working with Subcontractors, Contracts, Oregon Lien Law, Bidding and Estimating, Scheduling and Project Management, Oregon Building Codes, Jobsite Safety, Environmental Factors, Building Exterior Shell, Financial Management, Tax Basics.
- Free practice exam: 10 questions per attempt, retake as often as you like.
- Full practice exam: 80 questions on a 3 hours clock, a new draw from our bank every attempt.
Oregon Construction Contractor Laws and Regulations 18 items
Our study plan for this topic: CCB licensing requirements and exemptions; License endorsement types and scope of work; Surety bond and insurance requirements by endorsement; Responsible Managing Individual (RMI) designation and responsibilities; Written contract requirements and consumer notices; Dispute resolution and complaint filing procedures; Violations, penalties, and enforcement process; Homebuyer Protection Act compliance and lien protection methods.
Choosing Your Business Structure 4 items
Our study plan for this topic: Sole proprietorship characteristics, advantages, and disadvantages; General and limited partnership structures and liability distinctions; Corporation formation, shareholder liability, and management structure; C corporation versus S corporation tax treatment; Limited liability company (LLC) structure, taxation, and hybrid characteristics; Comparative summary of business structures by ownership, liability, formation documents, and management; Assumed business name (ABN) registration requirements; Business trusts and trademark considerations.
Hiring and Managing Employees 7 items
Our study plan for this topic: Legal and illegal interview questions; New hire reporting requirements and purpose; Hiring minors in construction (prohibited tasks, work hours, employment certificates); Employee personnel file documentation (I-9, W-4, employment application); Fair Labor Standards Act (FLSA) overtime, recordkeeping, and exemptions; Oregon wage and hour regulations (minimum wage, rest/meal periods, paydays, deductions, final paychecks); Oregon Prevailing Wage Rate law (covered projects, exemptions, contractor responsibilities); Americans with Disabilities Act (ADA) and other key employment laws (Title VII, ADEA, FMLA/OFLA, USERRA).
Working with Subcontractors 2 items
Our study plan for this topic: Evaluating and selecting qualified subcontractors (criteria and reference checks); Insurance, licensing, and bonding requirements for subcontractors; Creating a winning partnership: orientation, communication, and site rules; Oregon recordkeeping requirements for subcontractor lists (name, address, license number, 72-hour rule); CCB e-Watch license monitoring tool; Penalties for knowingly using unlicensed subcontractors; Independent contractor vs. employee classification (Oregon multi-part checklist); Consequences of misclassifying employees as independent contractors (taxes, workers' compensation, fines).
Contracts 9 items
Our study plan for this topic: Required elements of a binding contract (offer, acceptance, consideration, competent parties, legal purpose); Contract provisions and payment terms (progress payments, retainage, final payment); Provisions to limit risk (force majeure, indemnification, differing site conditions, warranties, delay clauses); Types of construction contracts (lump-sum, unit-price, cost-plus); Contracting methods (single prime, design/build, construction management, turnkey, fast-track, multiple prime); Breach of contract and damages (material vs. immaterial breach, liquidated, special, and consequential damages); Alternative dispute resolution (negotiation, mediation, collaborative law, arbitration, CCB dispute resolution); Change orders and contract modifications (requirements, addenda vs. modifications, oral vs. written agreements).
Oregon Lien Law 5 items
Our study plan for this topic: Definition of key lien law terms (owner, contractor, subcontractor, original contractor, mortgagee, commencement of improvement); Who is entitled to file a construction lien (licensed contractors, subcontractors, material suppliers, equipment rental companies, design professionals); Information Notice to Owner about Construction Liens — when required, timing, and consequences of non-delivery; Notice of Right to a Lien — who must provide it, timing relative to start of work, delivery method, and coverage period; Recording a Claim of Lien — required contents, 75-day filing deadline, and county recording process; Post-claim notices — Notice of Filing a Claim of Lien (20-day deadline) and Notice of Intent to Foreclose (10-day notice before suit); Lien foreclosure lawsuit — 120-day filing deadline, court jurisdiction, and priority relative to mortgages; Homebuyer Protection Act — properties covered, seller compliance methods, Notice of Compliance requirements, and penalties for non-compliance.
Bidding and Estimating 6 items
Our study plan for this topic: Bid documents and bid package components; Ethics in bidding: bid shopping, bid peddling, and bid rigging; Estimating framework: project phases, tasks, and materials; Quantity take-off method for determining estimated costs; Labor cost calculation and labor burden; Direct costs: materials, equipment, subcontractor fees, allowances, and contingencies; Overhead calculation and markup for profit margin; Job cost recording system and estimating pitfalls.
Scheduling and Project Management 5 items
Our study plan for this topic: Scheduling process components (sequence of tasks, activity duration, contingency time, float time); Scheduling methods: calendar, bar chart, and critical path method (CPM); Critical path method: task relationships, simultaneous events, and critical activities; Scheduling and cash flow management (working capital, progress payments, preliminary cash flow budget); Project supervisory team roles (project manager, superintendent, foreman, materials expediter); Project life cycle phases (pre-construction, construction, closeout); Tracking project progress (daily reports, status reports, schedule monitoring); Budget and cost controls (cost overruns, just-in-time delivery, purchase orders, receiving).
Oregon Building Codes 4 items
Our study plan for this topic: Oregon Building Codes Division structure and role; Specialty codes overview and applicability; Permit requirements and application process; Plan review and required project documentation; Inspection types, sequencing, and procedures; Stop work orders: issuance, compliance, and consequences; Specialty trade licensing requirements under Building Codes Division; Activities requiring special licenses, permits, or notices (DEQ, OHA, OWRD).
Jobsite Safety 4 items
Our study plan for this topic: Oregon OSHA regulatory framework and employer responsibilities; Safety training requirements and safety committee obligations; Substance abuse policies and substance-free workplace programs; Personal protective equipment selection and use; Emergency action plan and emergency medical plan requirements; Injury and illness recordkeeping (OSHA 300, 300A, DCBS 801) and reporting timelines; Hazard communication standards, Safety Data Sheets, and written hazard communication plan; Fall protection systems and ladder safety.
Environmental Factors 4 items
Our study plan for this topic: EPA and Oregon DEQ roles and jurisdiction over construction environmental compliance; Air quality regulations: open burning permits, dust control, refrigerant handling, and indoor air quality; Asbestos identification, survey requirements, abatement licensing, and DEQ notification; Lead-based paint renovation licensing, certified renovator requirements, and target housing definitions; Clean water protections: stormwater discharge, NPDES permit requirements, and construction washing rules; Sedimentation and erosion control measures and NPDES 1200-C permit obligations; Hazardous and non-hazardous solid waste identification, generator classifications, and disposal requirements; Environmentally suspect materials handling: PCBs, mercury-containing devices, used oil, refrigerants, and underground storage tanks.
Building Exterior Shell 4 items
Our study plan for this topic: Purpose and components of the building exterior shell (building envelope); Water intrusion sources and mechanisms (rain, snow/ice, condensation, groundwater, saturated materials); Oregon rainscreen system requirements for exterior walls; Flashing installation locations, materials, and galvanic corrosion considerations; Window and door assembly weatherproofing and integration with water-resistive barriers; Deck assembly waterproofing, drainage, and flashing requirements; Roof assembly water management, drainage, and common failure causes; Foundation damp-proofing, waterproofing, crawlspace ventilation, and capillary breaks.
Financial Management 4 items
Our study plan for this topic: Financial statements: balance sheet, income statement, and cash flow statement; Accounting cycle steps: recording, posting, adjusting entries, and closing; Cash method vs. accrual method of accounting; Cash flow management: billing, accounts receivable collection, and progress payments; Financial ratio analysis: liquidity ratio, debt ratio, and return on total assets; Depreciation methods: straight-line and accelerated (MACRS); Payroll accounting: gross pay, tax deductions, and net pay calculation; Accounting for materials: purchase orders, payment terms, and shipping terms.
Tax Basics 4 items
Our study plan for this topic: Federal Employer Identification Number (EIN) requirements and application; Oregon Business Identification Number (BIN) requirements and uses; Federal tax forms by business entity type; Estimated tax thresholds and payment requirements for individuals and corporations; Self-employment tax (SE tax) filing requirements and thresholds; Federal employment taxes: FICA, federal income tax withholding, and FUTA; Payroll tax deposit schedules and penalty rates for late or incorrect deposits; Oregon corporate excise tax rates, minimum tax, and filing requirements.
Sample 1 — Oregon Construction Contractor Laws and Regulations
Question: Your firm currently holds a commercial specialty contractor level 1 endorsement and is upgrading to a commercial general contractor level 1 endorsement so it can perform and subcontract an unlimited number of unrelated trades on large commercial jobsites. What surety bond amount must the firm file with the CCB for the new endorsement?
- A. $20,000
- B. $50,000
- C. $100,000
- D. $75,000
Correct Answer: D
Under the CCB bond schedule (ORS ch. 701 / OAR ch. 812), a commercial general contractor level 1 must maintain a $75,000 surety bond. A commercial specialty contractor level 1 bond is $50,000, and level 2 commercial endorsements and the commercial developer endorsement require $20,000.
Reference: Oregon Contractor's Reference Manual, Appendix C: Endorsement Summary / Chapter 1 — Bond Amounts section
Sample 2 — Contracts
Question: An owner retains a professional firm for a fee to coordinate and supervise a project from the conceptual development stage through final construction, requiring the work to be performed in a timely and economical manner. Which contracting method is the owner using?
- A. Single prime
- B. Turnkey
- C. Design/build
- D. Construction management
Correct Answer: D
The Oregon Contractors Reference Manual, Chapter 5, describes the construction management method as the owner contracting with a professional construction manager who generally receives a fee to manage, coordinate and supervise the construction process from conceptual development through final construction. Design/build places design and construction with one company, turnkey adds land and financing responsibilities, and single prime is the traditional owner-architect-contractor arrangement.
Reference: Oregon Contractors Reference Manual, Chapter 5 (Contracts) — Construction Management section
Sample 3 — Hiring and Managing Employees
Question: During one workweek a non-exempt laborer on your crew logs 38 hours on the jobsite and also attends a mandatory three-hour Saturday safety meeting that you require at your shop. How many of that week's hours must be paid at one-and-one-half times the regular rate?
- A. 3 hours
- B. 0 hours
- C. 1 hour
- D. 4 hours
Correct Answer: C
Work hours under the FLSA ordinarily include all time an employee is required to be on the employer's premises, on duty or at a prescribed workplace, so the required safety meeting counts: 38 + 3 = 41 hours. Overtime at one-and-one-half times the regular rate is owed only for hours over 40 in the workweek — one hour. (Oregon CCB Contractor's Reference Manual, Chapter 3, Work Hours Defined Under FLSA and Fair Labor Standards Act)
Reference: Oregon CCB Contractor's Reference Manual, Chapter 3 (Hiring and Managing Employees) — Work Hours Defined Under FLSA section
- Your results break the score down by outline topic.
- The real exam's passing score: 70% correct.
- Keep practicing until you pass consistently, not just once.
- Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
- Work your bookmarks on the second pass.
- Real exam pace: about 2 minutes 15 seconds per question.
- After each attempt, look up every miss in your book.
| Questions | 80 questions |
| Time limit | 3 hours |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | $60 |
- Failing candidates may retest an unlimited number of times with no expiration date.
Source: Oregon Construction Contractors Board Examination Candidate Information Bulletin, Effective 8/5/2025. Check the bulletin before test day: fees and rules can change.