Tennessee · Prov

Tennessee LLE Limited Licensed Electrician Practice Exam

40 questions 120 minutes 73% to pass 10 topics 3:00 per question Open book 239 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$4.95

Complete exam simulation matching the real Prov test format.

  • 40 questions (same as real exam)
  • 120 minute time limit
  • 10 topic areas covered
  • 239 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 10 topic quizzes and this full exam. $59.95/month.
See the study course

Tennessee LLE Limited Licensed Electrician Practice Exam Guide

Built from the official Prov exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 40
Services, Feeders, and Branch Circuits7
Grounding and Bonding5
Raceways and Boxes5
Hazardous Locations and Special Occupancies5
General Knowledge4
Conductors and Cables4
Installation Requirements3
Lighting, Signs, and General Use Equipment3
Overcurrent Protection2
Low Voltage Alarms, Signaling Systems, and Communications2

This practice exam is built around the official content outline for the Tennessee LLE Limited Licensed Electrician exam: General Knowledge, Installation Requirements, Services, Feeders, and Branch Circuits, Overcurrent Protection, Grounding and Bonding, Conductors and Cables, Raceways and Boxes, Hazardous Locations and Special Occupancies, Low Voltage Alarms, Signaling Systems, and Communications, Lighting, Signs, and General Use Equipment.

There are two ways to practice. The free practice exam gives you 10 questions per attempt, and you can take it as many times as you like. The full practice exam gives you 40 questions on a 2 hours clock, with a new draw from our question bank each time.

10 topics

General Knowledge 4 items

Our study plan for this topic: Ohm's Law formulas and calculations (voltage, current, resistance, power); Series, parallel, and combination circuit analysis; NEC Article 100 definitions and terminology; NEC Article 110 general installation requirements (approval, equipment examination, working clearances); Voltage drop calculations for single-phase and three-phase circuits; Electrical formulas for amperes, horsepower, kilowatts, and kVA (DC and AC); OSHA 1926 Subpart K electrical safety requirements for construction sites (GFCI, lockout/tagging, grounding); Common electrical distribution systems and conductor identification.

Installation Requirements 3 items

Our study plan for this topic: Working space depth, width, and height requirements for electrical equipment (NEC Table 110.26(A)(1) and Table 110.34(A)); Underground installation minimum cover requirements by wiring method and location (NEC Table 300.5); Protection of conductors and cables against physical damage (bored holes, notches, framing members, roof decking); Equipment approval, listing, labeling, and marking requirements; Electrical connections: terminals, splices, and conductor temperature limitations; Guarding of live parts and minimum clearance of live parts by voltage; Enclosure type selection for indoor and outdoor environments (NEC Table 110.28); Supporting conductors in vertical raceways: spacing intervals by conductor size and material.

Services, Feeders, and Branch Circuits 7 items

Our study plan for this topic: Branch-circuit ratings, conductor sizing, and overcurrent protection requirements; GFCI and AFCI protection requirements by location and occupancy type; Required receptacle and lighting outlet placement in dwelling and non-dwelling occupancies; Service entrance conductor installation, wiring methods, and clearances; Service disconnecting means requirements, ratings, and location; Feeder conductor sizing, overcurrent protection, and ground-fault protection of equipment; Branch-circuit, feeder, and service load calculations using demand factors; Outside branch circuits and feeders: clearances, disconnecting means, and wiring methods.

Overcurrent Protection 2 items

Our study plan for this topic: Standard ampere ratings for fuses and inverse time circuit breakers; Conductor overcurrent protection based on ampacity and wire size (small conductors); Location of overcurrent protective devices in circuit (feeder taps and transformer secondary conductors); Physical placement and accessibility requirements for overcurrent devices; Circuit breaker requirements (marking, operation, voltage ratings, and arc energy reduction); Fuse types and fuseholder requirements (plug fuses, Type S fuses, cartridge fuses); Short-circuit current calculation procedures including transformer multiplier and fault current; Current-limiting fuse let-through current and component protection.

Grounding and Bonding 5 items

Our study plan for this topic: Grounding electrode system types and installation requirements (NEC 250.52, 250.53); Sizing grounding electrode conductors for AC systems (Table 250.66); Sizing equipment grounding conductors (Table 250.122); Main bonding jumper and system bonding jumper requirements and sizing (Table 250.102(C)(1)); Equipment grounding conductor types, identification, and installation methods (NEC 250.118, 250.119); Bonding of services, piping systems, and structural metal (NEC 250.92, 250.104); Grounding of separately derived AC systems (NEC 250.30); Identification and use of grounded conductors (Article 200).

Conductors and Cables 4 items

Our study plan for this topic: Conductor ampacity tables and temperature ratings (60°C, 75°C, 90°C) for copper and aluminum; Ampacity correction factors for ambient temperature and adjustment factors for more than three current-carrying conductors; Conductor insulation types, designations, and permitted applications by location (dry, damp, wet); Conductors in parallel: minimum size, matching requirements, and installation rules; Cable type uses permitted and uses not permitted (NM, MC, AC, SE, USE, UF, TC, MI, MV); Securing and supporting requirements for cable types (intervals, distances from boxes); Conductor markings, identification, and minimum size requirements; Flexible cords and fixture wires: types, ampacities, permitted and prohibited uses.

Raceways and Boxes 5 items

Our study plan for this topic: Conduit fill calculations and conductor count tables (EMT, RMC, IMC, FMC, LFMC, PVC, ENT); Raceway securing and support intervals by conduit type; Box fill calculations and volume requirements per conductor; Pull and junction box sizing for conductors 4 AWG and larger (straight, angle, and U pulls); Permitted and prohibited uses of raceway types by location and condition; Conduit bending requirements (bend radius, maximum bends per run, bending methods and calculations); Cabinets, cutout boxes, and enclosure installation requirements (wire-bending space, deflection, damp/wet locations); Cable tray systems: types, fill requirements, grounding, and ampacity.

Hazardous Locations and Special Occupancies 5 items

Our study plan for this topic: Classification of hazardous locations: Class I, II, and III Divisions 1 and 2 (Article 500); Material groups for Class I locations (Groups A, B, C, D) and Class II locations (Groups E, F, G); Wiring methods and sealing requirements for Class I Division 1 and 2 locations (Article 501); Zone classification system for Class I Zone 0, 1, and 2 locations and protection techniques (Article 505); Zone 20, 21, and 22 locations for combustible dusts and ignitible fibers/flyings (Article 506); Intrinsically safe systems: installation, wiring separation, and equipment requirements (Article 504); Specific hazardous occupancies: commercial garages, aircraft hangars, motor fuel dispensing facilities, bulk storage plants, and spray application processes (Articles 511–516); Health care facility essential electrical systems: life safety branch, critical branch, and equipment branch requirements (Article 517).

Low Voltage Alarms, Signaling Systems, and Communications 2 items

Our study plan for this topic: Fire alarm circuit classifications: non-power-limited (NPLFA) vs. power-limited (PLFA) requirements; Class 1, Class 2, and Class 3 circuit power source requirements and voltage/power limitations; Cable type selection and installation by location: plenums, risers, and general-purpose spaces; Bonding and grounding of communications, CATV, and broadband system cables and protectors; Primary and secondary protector requirements for communications and fire alarm circuits; Separation requirements between low-voltage signal circuits and electric light/power conductors; Optical fiber cable types (conductive vs. nonconductive) and installation methods; Network-powered broadband communications system cable types and power classifications.

Lighting, Signs, and General Use Equipment 3 items

Our study plan for this topic: Luminaire installation requirements and location restrictions (Article 410); Receptacle types, ratings, and installation requirements (Article 406); Switch types, ratings, and installation requirements (Article 404); Panelboard and switchboard installation, overcurrent protection, and grounding (Article 408); Electric signs and outline lighting disconnects, grounding, and branch circuits (Article 600); Fixed electric space-heating equipment installation, disconnecting means, and overcurrent protection (Article 424); Air-conditioning and refrigerating equipment disconnecting means, branch-circuit protection, and conductor sizing (Article 440); Swimming pools, spas, and fountains — GFCI protection, bonding, and luminaire requirements (Article 680).

3 questions

Sample 1 — Services, Feeders, and Branch Circuits

Question: According to NEC Section 215.4(A), up to how many sets of 3-wire feeders are permitted to utilize a common neutral conductor?

  • A. Two sets
  • B. Three sets
  • C. Four sets
  • D. Five sets

Correct Answer: B

According to the National Electrical Code or National Electrical Code Handbook (Page 93), Section 215.4(A) states that up to three sets of 3-wire feeders or two sets of 4-wire or 5-wire feeders shall be permitted to utilize a common neutral.

Reference: NEC 2017 Section 215.4(A)

Sample 2 — Grounding and Bonding

Question: A 400 A service uses 600 kcmil copper service conductors. What is the minimum size of a copper grounding electrode conductor that runs only to a concrete-encased electrode?

  • A. 2 AWG
  • B. 4 AWG
  • C. 3/0 AWG
  • D. 1/0 AWG

Correct Answer: B

Table 250.66 would require a 1/0 AWG copper grounding electrode conductor for 600 kcmil copper service conductors, but 250.66(B) says a grounding electrode conductor (or bonding jumper) that runs only to a concrete-encased electrode is not required to be larger than 4 AWG copper. So the minimum size required here is 4 AWG copper.

Reference: NEC 2017 Section 250.66(B), Table 250.66

Sample 3 — Raceways and Boxes

Question: Which of the following is a permitted use for Liquidtight Flexible Metal Conduit (LFMC)?

  • A. Where subject to physical damage
  • B. For direct burial where listed and marked for the purpose
  • C. In locations where the operating temperature exceeds the material's listed rating
  • D. As a substitute for rigid metal conduit in all hazardous locations

Correct Answer: B

Per NEC 350.10(3), LFMC shall be permitted for direct burial where listed and marked for the purpose. Section 350.12 prohibits LFMC where subject to physical damage or where temperature limits are exceeded.

Reference: NEC 2017 Section 350.10(3)

Your first score is just a starting point. After every attempt, the results page shows how you did on each outline topic, so you can see what to work on next. Compare your score with the real exam's passing score, a minimum score of 73, and keep at it until you pass consistently.

  • Start with the questions you know. Go through the whole exam once and bookmark anything you're unsure about. Our practice exams let you bookmark and come back.
  • Circle back to your bookmarks on the second pass.
  • Keep an eye on your pace. The real exam works out to about 3 minutes per question.
  • Turn every miss into a lesson. After each attempt, look up each missed question's reference in your book and read the section.

Questions 40 questions
Time limit 2 hours
Passing score a minimum score of 73
Books in the exam room Open book
Exam fee $53
  • Results are reported immediately by email with a numerical score and pass/fail result, plus a diagnostic report for candidates who fail.
  • Failed exams may be retaken an unlimited number of times with no waiting period, at $53 per attempt.

Source: Tennessee Board for Licensing Contractors Candidate Information Bulletin, TNCONT_CIB 2026.08.18. Check the bulletin before test day: fees and rules can change.

Reference books

3 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account