Exam Cheat Sheet · Quick Reference

Alabama Drainage and Culvert Contractor

Alabama  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
30
Passing score
70%
Exam time
75 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Alabama State Portion 30 questions

Earthwork/Surveying 8 Q · 27%
Reading and interpreting plan views and profile views for underground utility workSurveying instruments and measurement techniques (optical level, transit, grade rod, GPS)Establishing line and grade using hubs, reference stakes, batter boards, and laser systemsStation numbers, elevations, cuts, fills, and engineer's decimal measurementsContour maps, contour intervals, and estimating cut and fill volumes using cross-section and average end area methodsSoil compaction methods, Proctor tests, and field density testingSite preparation tasks including clearing, grubbing, utility location, and sediment controlDealing with rock types, rippability, and groundwater dewatering in excavation
Concrete 5 Q · 17%
Concrete mixture proportioning and water-cementitious materials ratioPortland cement types and supplementary cementitious materials (fly ash, slag cement, silica fume)Aggregates for concrete: classification, grading, and propertiesFresh concrete properties: workability, slump, air content, and bleedingConcrete durability: freeze-thaw resistance, sulfate attack, and permeabilityPlacing, finishing, and curing concreteChemical admixtures: types, functions, and effects on concrete propertiesHot and cold weather concreting precautions and requirements
Curbs and Gutters 5 Q · 17%
Gutter grade and cross-slope design standardsCurb opening inlet types, capacity, and placementGrate inlet types and debris blockage considerationsCombination curb-and-grate inlet applicationsAllowable pavement encroachment criteria by street classificationGutter flow capacity calculations using Manning's equationInlet location and spacing requirements at intersections and grade transitionsSpecial purpose inlet types including slotted drains and bicycle-safe grates
Culverts 3 Q · 10%
Culvert hydraulic design and flow control (inlet vs. outlet control)Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types)Structural loads on buried culverts (soil loads, Marston theory, trench vs. embankment conditions)Pipe bedding and backfill requirements for culvert installationOutlet protection and energy dissipation at culvert outlets (riprap aprons, scour hole design)Headwater and tailwater depth calculations for culvert sizingSuperimposed live loads on culverts (highway, railway loading)Culvert end structures and appurtenances (headwalls, wingwalls, energy-dissipating headwalls)
One Call 5 Q · 17%
Purpose and scope of the Alabama Damage Prevention Law (§37-15-1)Key definitions under the One-Call law (excavator, operator, tolerance zone, working day, etc.)Notice of intent to excavate or demolish — timing, content, and validity periodsExcavator responsibilities within the tolerance zone and precautions to avoid damageOperator response to notice — marking requirements and APWA color codeEmergency excavation procedures and notification requirementsDesign and survey locate requests — submission and operator responseCivil penalties for violations and the Underground Damage Prevention enforcement process
Heavy Equipment/Safety 4 Q · 13%
Excavation cave-in protective systems (sloping, benching, shoring, and trench shields)Pre-shift and periodic inspection requirements for heavy equipment and cranesRollover protective structures (ROPS) for earthmoving equipmentPower line safety and minimum clearance distances for equipment operationsPersonal protective equipment requirements for construction operationsMotor vehicle and earthmoving equipment operational safety requirementsCrane and derrick assembly, disassembly, and operator qualification requirementsSigns, signals, barricades, and flagging requirements for construction work zones

Key Distinctions

Standard Proctor (T-99, ASTM D 698)vsModified Proctor (T-180, ASTM D 1557)

Standard compacts the lab sample in three layers struck 25 times with a 5.5-lb, 2-in. hammer (12,400 ft-lb), while modified uses five layers struck 25 times with a 10-lb hammer (56,250 ft-lb per cubic foot) and is specified for high-design-load areas such as heavy-duty paving, concrete drives, federal highways and runways.

Pipe and Excavation Contracting, Pages 183 to 184
ScrapersvsTrucks

A scraper can dump its payload in uniformly thick layers (improving compaction productivity on embankments), whereas trucks cannot.

Pipe and Excavation Contracting, Page 90
Load factorvsSwell factor

A load factor converts loose cubic yards to bank cubic yards (bank volume ÷ (bank volume + swell percentage)), while a swell factor converts in-place bank volume up to loose disturbed volume (e.g., 1.7 for broken asphalt/concrete slab).

Pipe and Excavation Contracting, Page 66
Swell factor 1.7 (broken slab)vsSwell factors 1.3–1.5 (soils)

Always allow 1.7 bank-to-loose for asphalt and concrete slab material; factors of 1.3, 1.4 and 1.5 apply to soils such as loam, not broken slab.

Pipe and Excavation Contracting, Page 138
Heaped bucket capacityvsStruck bucket capacity

Depending on soil type, heaped capacity is usually about 130 percent of struck capacity (e.g., a 2-ft hoe bucket struck at 5–6 LCF heaps about 6.5–8 LCF).

Pipe and Excavation Contracting, Pages 142-143
Oxygen enriched atmospherevsOxygen deficient atmosphere

Enriched means more than 23.5 percent oxygen by volume; deficient means less than 19.5 percent — either is a hazardous atmosphere under the confined spaces standard.

29 CFR 1926, §1926.1202
Field-cured cylindersvsStandard-cured companion cylinders

Field-cured cylinders are cured alongside the structure to judge curing/protection adequacy; curing is adequate if their average strength at the age designated for f'c is at least 85% of the companion standard-cured strength (or field-cured strength exceeds f'c by more than 500 psi / 3.5 MPa).

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Equipment in transit, no load, boom loweredvsEquipment working near energized lines

In transit with no load and boom lowered requires 4 ft under 50 kV, 10 ft over 50 kV up to and including 345 kV, and 16 ft up to and including 750 kV; working clearance is computed under §1926.600(a)(6)(ii) as 10 ft plus 0.4 in. per kV over 50 kV.

OSHA 29 CFR 1926, §1926.600(a)(6)(iii)
Grate inlet with no curb openingvsCombination inlet (grate plus curb opening)

A safety factor on computed theoretical capacity is especially important for a grate with no curb opening because a grate alone is prone to debris blockage and loss of capacity.

Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 245
Undisturbed earthvsSoil in an old, previously dug trench line

In certain soils, soil resistance is usually greater in undisturbed earth; the old ditch line digs easier and can be spotted visually as darker topsoil mixed into lighter-colored subsoil.

Pipe and Excavation Contracting, Page 148
Cemented gravel trench wallvsPocket of loose sand or heavy loam in the wall

A vertical wall in cemented gravel may be quite safe, but a pocket of loose sand or heavy loam makes it dangerous — classification and protection must account for the weakest soil present.

Pipe and Excavation Contracting, Page 171
Light utility dozers (40–80 hp)vsMid-sized production dozers (80–200 hp)

Light utility dozers (blade capacity 1.25–2.25 cu yd) are listed for residential/commercial foundations, fine grading, trench backfill, landscaping, light logging and swamp dozing; mid-sized production dozers list 'logging' and tree and stump removal.

Pipe & Excavation Contracting, Chapter 2 – Bulldozers
Hard-troweled (steel-troweled) finishvsFloat or broom finish

Concrete with more than 3% entrained air should not be hard troweled (risk of delamination), so slabs at the 6% or more typical of exterior freeze-thaw exposure get float or broom finishes instead.

Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330

Key Terms

Oxygen enriched atmosphere (29 CFR 1926 §1926.1202) 29 CFR 1926, §1926.1202
An atmosphere containing more than 23.5 percent oxygen by volume, which is a hazardous atmosphere under the confined spaces standard.
Oxygen deficient atmosphere (29 CFR 1926 §1926.1202) 29 CFR 1926, §1926.1202
An atmosphere containing less than 19.5 percent oxygen by volume, which is a hazardous atmosphere under the confined spaces standard.
Equipment clearance in transit (29 CFR 1926 §1926.600(a)(6)(iii)) OSHA 29 CFR 1926, §1926.600(a)(6)(iii)
Minimum clearance from energized overhead lines for equipment in transit with no load and boom lowered: 4 ft below 50 kV, 10 ft over 50 kV through 345 kV, and 16 ft up to and including 750 kV.
One-call damage liability exemption (Ala. Code §37-15-4(i)) Alabama 1Call – Dig Safely; AL Act 94-487 S.299, §37-15-4(i)
A person who complies with the notification requirements escapes liability only if the operator received the required notice, the operator failed to locate its facilities as required by §37-15-6, and the damage is a proximate result of that failure to locate.
Cast-in-place cylinder (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
A cylinder cast in a mold left in the member and cured with the surrounding concrete to verify in-place strength, intended for members 5 in. to 12 in. (125–300 mm) deep and particularly applicable to cold-weather concreting, post-tensioning and slabs.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A segregation-resistance test in which unconsolidated low-slump concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm square-head vibrator, stripped, and inspected for voids and edge slumping; a common slipform paving target is edge slump of 6 mm (0.25 in.) or less.
Adequate field curing (ACI 318-19, per DCCM 17th ed. Ch. 20) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Curing and protection are considered adequate if field-cured cylinders tested at the age designated for f'c average at least 85% of companion standard-cured cylinder strength, or exceed f'c by more than 3.5 MPa (500 psi).
Water required for complete hydration (DCCM 17th ed. Ch. 2) Design and Control of Concrete Mixtures (17th ed.), Chapter 2 — Water (Evaporable and Nonevaporable) section, Page 43
Complete hydration of portland cement requires water of about 40% of the mass of the cement (w/c of 0.40); below about 0.40 some cement remains unhydrated for lack of water.
Cold-weather subgrade temperature differential (DCCM 17th ed. Ch. 15) Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
In cold weather the difference between the surface temperature of supporting materials and the concrete should be held to less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss and plastic shrinkage cracking; concrete must not be placed on frozen subgrade and snow, ice and debris must be removed from the forms.
Hard-troweled finish air limit (DCCM 17th ed. Ch. 15; ACI 302.1R-15, ACI 301-20) Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Concrete with more than 3 percent entrained air should not be given a hard-troweled finish because finishing before bleeding is complete can trap bleed water or air and cause delaminations.
Set (trenching) Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
The length of trench a backhoe can excavate from one position.
Digging cycle Pipe & Excavation Contracting, Chapter 5, Page 143 - Digging Cycle Component table
The sequence of a typical backhoe cycle: (1) load bucket, (2) lift load, (3) swing and prepare to dump, (4) dump bucket load, and (5) return to dig.
Load factor Pipe and Excavation Contracting, Page 66
A conversion that changes loose cubic yards to bank cubic yards, calculated as bank volume divided by (bank volume plus swell percentage).
Mobilization cost Pipe and Excavation Contracting, Page 60
A project setup cost that is sometimes itemized as a separate bid item; if it is not, it must be included in the equipment cost calculations.
Trench box placement Pipe and Excavation Contracting, Page 170
The bottom of the trench box should sit 2 to 3 feet higher than the pipe so pulling it forward does not disturb bedding and newly-laid pipe; more than 5 feet above the pipe makes the ditch unsafe.
Dam of unexcavated soil Pipe and Excavation Contracting, Page 165
In high groundwater, the operator begins excavating some distance behind the end of the laid pipe and leaves an unexcavated soil 'dam' until last to keep water, mud and sludge from flowing against and blocking the pipe.
Inlet interception rule of thumb (Urban Storm Water Management Systems, Ch. 8) Design and Construction of Urban Storm Water Management Systems, Chapter 8, Pages 246 to 247
When spacing successive curb inlets on a continuous grade by trial and error, 70–80% of the approaching gutter flow is a reasonable rule-of-thumb interception, with succeeding inlets sized for the bypass (carryover) plus intervening street flow.
Backfill in lifts Pipe and Excavation Contracting, Page 87
Trenches are usually backfilled in lifts, each lift compacted and often density-tested before the next lift is installed, which substantially reduces backfill production.

Formulas to Know

Bank to loose volume for broken asphalt/concrete slabLCY = BCY × 1.7 (example: 1,400 BCY × 1.7 = 2,380 LCY); soils such as loam use 1.3–1.5
Load factor (loose to bank)Load factor = bank volume ÷ (bank volume + swell percentage); multiply LCY by load factor to get BCY
Import quantity from cut and fill (convert both to a common soil state)Cut LCY = BCY × (bank-to-loose factor); Fill LCY = CCY × (compacted-to-loose factor); Import = Fill LCY − Cut LCY (example for dry common earth at 100% Standard Proctor, factors 1.32 LCY/BCY and 1.54 LCY/CCY: 4,000 × 1.32 = 5,280; 4,000 × 1.54 = 6,160; 6,160 − 5,280 = 880 LCY)
Realistic excavator production from optimum productionRealistic = optimum × operator ability × job efficiency × site condition factor (example: 78 LCY/hr × 0.75 × 0.83 × 0.6 ≈ 29 LCY/hr)
Motor-grader production and timeProduction = (blade width × speed mph × 5,280 × job efficiency × operator ability) ÷ number of passes; hours = area ÷ production (example: (12 × 4 × 5,280 × 0.83 × 0.75) ÷ 5 = 31,553 SF/hr = 3,506 SY/hr; 30,000 ÷ 3,506 ≈ 8.6 hr)
Trench linear feet per hour by digging cycleBCF/LF = width × depth; LCF/LF = BCF × (1 + swell); LCF per set = LCF/LF × set length; cycles per set = LCF per set ÷ bucket load; time per set = (cycles × cycle seconds) + move time; sets/hr = 60 min ÷ minutes per set; LF/hr = sets/hr × set length (example: 2×4=8 BCF; ×1.3=10.4 LCF; ×8 ft=83.2; ÷8=10.4 cycles; (10.4×12)+15=139.8 s=2.33 min; 60÷2.33=25.75 sets; ×8 = 206 LF/hr)
Heaped bucket capacityHeaped ≈ 1.30 × struck capacity
Height of instrument when grade rod is set on top of pipeHI = rod reading on hub + cut − (pipe diameter plus wall thickness) (example: 4.78 + 12.66 − 1.25 = 16.19)
Concrete volume for footings, piers and wallsCu yd = length × width × depth (ft) ÷ 27; continuous footing length = outside perimeter = 2 × (L + W) (examples: 124 × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 cu yd; pier 2.5 × 2.5 × 1 = 6.25 cu ft, ×3 = 18.75 ÷ 27 = 0.69 cu yd)
4-in. slab concrete from Table 11-1, and 8-in. wall concrete from the printed tableSlab: one cu yd covers 81 sq ft at 4 in., so cu yd = area ÷ 81, rounded up to whole yards (example: 960 ÷ 81 = 11.85 → 12 cu yd). 8-in. wall: cu yd = (wall area ÷ 100) × 2.47 (example: 1,088 ÷ 100 = 10.88 × 2.47 = 26.87 cu yd). Wall form contact area = 2 × perimeter × height. Footing orders are rounded UP to the next quarter yard; combined footing+pier+slab totals are rounded up to the next whole yard.