Alabama · PSI

Alabama Drainage and Culvert Contractor Practice Exam

30 questions 75 minutes 70% to pass 6 topics 2:30 per question Open book 208 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$4.95

Complete exam simulation matching the real PSI test format.

  • 30 questions (same as real exam)
  • 75 minute time limit
  • 6 topic areas covered
  • 208 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 6 topic quizzes and this full exam, plus the Business and Law exam. $59.95/month.
See the study course

Alabama Drainage and Culvert Contractor Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 30
Earthwork/Surveying8
Concrete5
Curbs and Gutters5
One Call5
Heavy Equipment/Safety4
Culverts3

This practice exam is laid out like the official content outline for the Alabama Drainage and Culvert Contractor exam: Earthwork/Surveying, Concrete, Curbs and Gutters, Culverts, One Call, Heavy Equipment/Safety.

Two ways to practice: the free practice exam gives you 10 questions per attempt, as often as you want. The full practice exam gives you 30 questions on a 75 minutes clock, with a new draw from our question bank every time.

6 topics

Earthwork/Surveying 8 items

Our study plan for this topic: Reading and interpreting plan views and profile views for underground utility work; Surveying instruments and measurement techniques (optical level, transit, grade rod, GPS); Establishing line and grade using hubs, reference stakes, batter boards, and laser systems; Station numbers, elevations, cuts, fills, and engineer's decimal measurements; Contour maps, contour intervals, and estimating cut and fill volumes using cross-section and average end area methods; Soil compaction methods, Proctor tests, and field density testing; Site preparation tasks including clearing, grubbing, utility location, and sediment control; Dealing with rock types, rippability, and groundwater dewatering in excavation.

Concrete 5 items

Our study plan for this topic: Concrete mixture proportioning and water-cementitious materials ratio; Portland cement types and supplementary cementitious materials (fly ash, slag cement, silica fume); Aggregates for concrete: classification, grading, and properties; Fresh concrete properties: workability, slump, air content, and bleeding; Concrete durability: freeze-thaw resistance, sulfate attack, and permeability; Placing, finishing, and curing concrete; Chemical admixtures: types, functions, and effects on concrete properties; Hot and cold weather concreting precautions and requirements.

Curbs and Gutters 5 items

Our study plan for this topic: Gutter grade and cross-slope design standards; Curb opening inlet types, capacity, and placement; Grate inlet types and debris blockage considerations; Combination curb-and-grate inlet applications; Allowable pavement encroachment criteria by street classification; Gutter flow capacity calculations using Manning's equation; Inlet location and spacing requirements at intersections and grade transitions; Special purpose inlet types including slotted drains and bicycle-safe grates.

Culverts 3 items

Our study plan for this topic: Culvert hydraulic design and flow control (inlet vs. outlet control); Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types); Structural loads on buried culverts (soil loads, Marston theory, trench vs. embankment conditions); Pipe bedding and backfill requirements for culvert installation; Outlet protection and energy dissipation at culvert outlets (riprap aprons, scour hole design); Headwater and tailwater depth calculations for culvert sizing; Superimposed live loads on culverts (highway, railway loading); Culvert end structures and appurtenances (headwalls, wingwalls, energy-dissipating headwalls).

One Call 5 items

Our study plan for this topic: Purpose and scope of the Alabama Damage Prevention Law (§37-15-1); Key definitions under the One-Call law (excavator, operator, tolerance zone, working day, etc.); Notice of intent to excavate or demolish — timing, content, and validity periods; Excavator responsibilities within the tolerance zone and precautions to avoid damage; Operator response to notice — marking requirements and APWA color code; Emergency excavation procedures and notification requirements; Design and survey locate requests — submission and operator response; Civil penalties for violations and the Underground Damage Prevention enforcement process.

Heavy Equipment/Safety 4 items

Our study plan for this topic: Excavation cave-in protective systems (sloping, benching, shoring, and trench shields); Pre-shift and periodic inspection requirements for heavy equipment and cranes; Rollover protective structures (ROPS) for earthmoving equipment; Power line safety and minimum clearance distances for equipment operations; Personal protective equipment requirements for construction operations; Motor vehicle and earthmoving equipment operational safety requirements; Crane and derrick assembly, disassembly, and operator qualification requirements; Signs, signals, barricades, and flagging requirements for construction work zones.

3 questions

Sample 1 — Earthwork/Surveying

Question: You are bidding a project that requires 4,000 BCY of cut and 4,000 CCY of fill using dry common earth placed at 100% Standard Proctor density. After converting both quantities to loose cubic yards (using conversion factors of 1.32 LCY/BCY and 1.54 LCY/CCY), what is the correct import quantity needed?

  • A. 1,540 LCY
  • B. No import is needed — the site is balanced
  • C. 1,280 LCY
  • D. 880 LCY

Correct Answer: D

Per Pipe & Excavation Contracting (Page 63), both cut and fill must be converted to the same soil state before comparing. Cut = 4,000 BCY × 1.32 = 5,280 LCY. Fill = 4,000 CCY × 1.54 = 6,160 LCY. Since fill exceeds cut: 6,160 − 5,280 = 880 LCY of import is required. Subtracting different soil states (LCY from CCY) without conversion produces a meaningless result.

Reference: Pipe and Excavation Contracting, Page 63

Sample 2 — Concrete

Question: You are the contractor placing structural concrete for a water treatment plant basin. The licensed design professional requires field-cured cylinders, cured alongside the structure, to evaluate whether your curing and protection procedures are adequate. Comparing them with companion standard-cured cylinders tested at the age designated for f'c, the field curing is considered adequate if the field-cured cylinders reach at least what portion of the companion standard-cured strength?

  • A. 100 percent
  • B. 75 percent
  • C. 85 percent
  • D. 90 percent

Correct Answer: C

Per ACI 318-19, as summarized in Design and Control of Concrete Mixtures (17th ed.), Chapter 20, curing and protection procedures are considered adequate if field-cured cylinders tested at the age designated for f'c have an average strength of at least 85% of that of companion standard-cured cylinders, or if the field-cured strength at test age exceeds f'c by more than 3.5 MPa (500 psi). The 75% figure is a different criterion — it applies to the lowest individual drilled core when evaluating in-place strength.

Reference: Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440

Sample 3 — Curbs and Gutters

Question: You are setting curb and gutter grades where a local street intersects a major street, and the grade of the major street (6%) is not to be interrupted. In developing the typical cross-sections for this condition, the crown must be held within the one-quarter points of the street and the crown slope held between stated limits. What is the maximum allowable crown slope used for this intersection condition?

  • A. 4%
  • B. 2%
  • C. 1%
  • D. 6%

Correct Answer: A

In the intersection design discussion (Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 258, referring to Figure 8.10), the typical cross-sections for a local street intersecting a major street assume a major street grade of 6%, a maximum allowable crown slope of 4%, a minimum allowable crown slope of 1%, and that the crown be maintained within the one-quarter points of the street. The 1% value is the minimum, not the maximum; 2% is the general minimum crown slope for a typical street section; 6% is the assumed major street longitudinal grade.

Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 258

Your first attempt is an inspection, not a final grade. The results page breaks your score down by outline topic, so you can see which areas need work. Compare it with the real exam's passing score, 70% correct, and keep practicing until you pass consistently.

  • Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
  • Work your bookmarks on the second pass.
  • Keep your pace. The real exam works out to about 1 minute 52 seconds per question.
  • After each attempt, look up each missed question's reference in your book and read the section.

Questions 30 scored questions plus up to 10 unscored experimental questions that count against your time
Time limit 75 minutes
Passing score 70% correct
Books in the exam room Open book
Exam fee $96
  • Results are given immediately on screen and emailed, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
  • You may take the examination an unlimited number of times during the 1-year period, paying the fee for each registration.

Source: State of Alabama General Contractors Candidate Information Bulletin, Updated 1/23/26. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account