Alabama Drainage and Culvert Contractor Exam: A Practical Study Guide
The Alabama Drainage and Culvert Contractor exam tests the rules and the reference books behind the work. This guide lays out the job: the key facts from the official bulletin, what the exam covers, the books you need, sample questions with answers, and how to get ready. PSI gives the exam.
The Alabama Drainage and Culvert Contractor Exam at a Glance
Here's the rundown from the official bulletin:
| Questions | 30 scored questions plus up to 10 unscored experimental questions that count against your time |
| Time limit | 75 minutes |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | $96 |
On exam day
- You must present one valid government-issued photo and signature identification that matches the name used when scheduling.
- You should arrive at least 30 minutes before your appointment.
- Reference books must be otherwise unmarked and may not contain loose or attached additional papers, and references are not supplied at the examination center.
- Books may be highlighted, underlined and indexed and tabbed with permanent tabs only, but may not be written in, and Post-It style temporary tabs must be removed before the exam begins.
- A silent, nonprinting, non-programmable calculator may be used in the examination center.
- Only approved items may be taken into the examination room, and personal belongings such as electronic devices, purses, reading material, writing devices, food and drinks must be left in secure storage.
References you may bring
- Alabama 1Call – Dig Safely; AL Act 94-487 S.299
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA), with latest available amendments
- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI, with latest available amendments
- Design and Control of Concrete Mixtures, Steven H. Kosmatka (16th Edition)
- Pipe and Excavation Contracting, Dave Roberts (2011)
- Design and Construction of Urban Storm Water Management Systems (1992)
Scheduling, changes and retakes
- You may register and schedule online at PSI's website or by calling PSI at (855) 257-1619.
- All eligibilities are valid for 1 year from the date the application is received by the state, and if you do not pass within that year you must reapply with the state.
- You may cancel and reschedule without forfeiting your fee if your cancellation notice is received 2 days before the scheduled examination date, using the PSI website or by speaking to a PSI representative.
- You forfeit your examination fee and cannot test if you miss the appointment, arrive after the examination start time, fail to cancel 2 days in advance, or do not present proper identification.
- Results are given immediately on screen and emailed, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
- You may take the examination an unlimited number of times during the 1-year period, paying the fee for each registration.
Source: State of Alabama General Contractors Candidate Information Bulletin, Updated 1/23/26. Check the bulletin before test day: fees and rules can change.
What the Alabama Drainage and Culvert Contractor Exam Covers
The official content outline breaks the exam into 6 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Earthwork/Surveying | 8 | 27% |
| Concrete | 5 | 17% |
| Curbs and Gutters | 5 | 17% |
| Culverts | 3 | 10% |
| One Call | 5 | 17% |
| Heavy Equipment/Safety | 4 | 13% |
How to Get Ready for the Alabama Drainage and Culvert Contractor Exam
Treat your reference books like your tools. On an open-book exam you don't need every rule memorized. You need to know which book holds it and where to find it.
Buy the books the bulletin lists. Except for Code books, the bulletin lets you base your answers on later editions; a different edition can put the answer on a different page.
Learn your way around each book before you study anything else. The table of contents and the index are your layout.
Highlight what you look up most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Put in the reps with timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 1 minute 52 seconds per question.
Measure twice. When you miss a practice question, find the section in your book, read it and mark it. Keep at it until you pass practice exams consistently.
The Books for the Alabama Drainage and Culvert Contractor Exam
The reference list allowed in the examination center includes Alabama 1Call – Dig Safely, 29 CFR Part 1926 (OSHA) or the PSI Selections, Design and Control of Concrete Mixtures, Pipe and Excavation Contracting, and Design and Construction of Urban Storm Water Management Systems.
Where to get them:
- Alabama 1Call – Dig Safely; AL Act 94-487 S.299
- OSHA 29 CFR 1926
- Design and Control of Concrete Mixtures
- Pipe and Excavation Contracting
- Urban Storm Water Management Systems
Working the Exam on Test Day
Work the exam in two passes. On the first pass, answer everything you know and bookmark the rest. The bulletin says you can return to any question and change your answer as long as the examination time has not run out. On the second pass, go back to your bookmarks and take them one at a time.
Don't get hung up on one question. You have 75 minutes for 30 scored questions plus up to 10 unscored experimental questions that count against your time, which is about 1 minute 52 seconds per question. Before you finish, make sure nothing is left blank.
Study Tips
Take this practice exam several times. The goal is to consistently clear your exam's passing score — often around 70–75% — so passing feels routine before you walk into the real test.
Our practice exam is specifically designed to mimic the testing conditions at all exam centers. While untimed PDF study guides might help with studying, they don’t prepare you for the challenge of managing your time during an actual test.
On an open-book exam, the winners aren't the smartest people in the room — they're the fastest at finding answers. Buy the required book, practice with it open, and tab and highlight each section the first time a question sends you there. Learn the index and table of contents until you can land on any topic in seconds. That speed is what separates a pass from a fail.
Every exam you take will be different from the last. New questions, new order, but always based on the exam bulletin in terms of topics, questions and time.
Sample Alabama Drainage and Culvert Contractor Questions
These come from our practice question bank, each with its answer and the reference behind it.
Sample 1 — One Call
Question: Your crew will use explosives to break rock while opening a drainage channel. What advance-notice window applies to blasting operations performed for excavation, not counting the day of notification?
- A. At least 2 but not more than 20 calendar days
- B. At least 2 working days but not more than 30 calendar days
- C. At least 5 working days but not more than 30 calendar days
- D. At least 2 but not more than 10 working days
Correct Answer: B
Per Ala. Code §37-15-4(b), for demolition or any blasting operations (for either excavation or demolition), notice must be given at least two working days but not more than 30 calendar days before the start, not including the day of notification.
Reference: Alabama 1Call – Dig Safely; AL Act 94-487 S.299, §37-15-4(b)
Sample 2 — Heavy Equipment/Safety
Question: You are a sitework contractor and your trackhoe operator reports that wet sandy spoil excavated from the bottom of a deep trench has been placed on the trench banks. Shortly after, you notice the bank soil appears wetter and is beginning to show signs of movement. What is the most likely cause of this change in bank stability?
- A. The trackhoe counterweight is vibrating the soil excessively
- B. The shoring jacks have been set too high above the pipe
- C. Water draining from the wet spoil has seeped into the bank soil and is lubricating it, causing the otherwise stable bank to slip
- D. The trench box is creating lateral pressure against the trench walls
Correct Answer: C
According to Pipe and Excavation Contracting, when wet sandy spoil from the bottom of a trench is piled on the banks, the water drains out of the wet spoil quickly and seeps down into the banks. This added water lubricates the soil in the bank, possibly causing an otherwise stable bank to slip. An experienced operator should foresee this and avoid placing wet spoil on the banks.
Reference: Pipe and Excavation Contracting, Page 164
Sample 3 — Culverts
Question: You are setting precast manholes on a public works storm drainage system where differential settlement is expected between each manhole and the incoming pipe. To accommodate that movement, limit shear forces on the pipe, and provide a positive seal between the manhole wall and the pipe, the plans call for resilient connectors. Which ASTM specification covers the manufacture of these connectors?
- A. ASTM C 923
- B. ASTM C 76
- C. ASTM C 443
- D. ASTM C 497
Correct Answer: A
Per Chapter 14, Section IX.C.1 (Manholes), rigid pipe-to-manhole connections subject to differential settlement can induce excessive shear, producing circumferential cracks or shear failure. Resilient connectors accommodate the settlement, minimize shear and leakage, and are manufactured in accordance with ASTM C 923. ASTM C 76 covers reinforced concrete culvert/storm drain pipe, C 443 covers rubber-gasket joints for circular concrete pipe, and C 497 covers test methods for concrete pipe.
Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 14 — Structural Requirements, Book Page 631
Sample 4 — Earthwork/Surveying
Question: A 6-foot-wide sheepsfoot roller works a wide trench backfill at 2 mph. Each loose lift compacts to 8 inches, and eight passes are required for compaction. Applying a job efficiency factor of 0.83 and an operator ability factor of 0.9, what is the corrected production rate in compacted cubic yards per hour?
- A. 146 CCY per hour
- B. 176 CCY per hour
- C. 196 CCY per hour
- D. 162 CCY per hour
Correct Answer: A
Per Pipe & Excavation Contracting, Chapter 6 (Soil Compaction, Pages 192-193), sheepsfoot ideal output = width (ft) × speed (mph) × compacted lift (in.) × 16.3 ÷ passes = 6 × 2 × 8 × 16.3 = 1,564.8 ÷ 8 = 195.6 CCY/hr ideal. Corrected: 195.6 × 0.83 × 0.9 ≈ 146 CCY/hr. 196 is the uncorrected ideal, 176 applies only the operator factor, and 162 applies only the job efficiency factor.
Reference: Pipe and Excavation Contracting, Chapter 6 — Soil Compaction, Pages 192-193
Why Practice Online Instead of With a PDF
A PDF is like reading about a job instead of doing it. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results break your score down by topic so you know where to put in more work.
Get Started
Take the free Alabama Drainage and Culvert Contractor practice exam to see where you stand, then put your time into the topics that need it. For the official rules, read the exam bulletin, and see the licensing board's website.