Alabama Drainage, Irrigation and Flood Control Contractor
Alabama
· PSI Services Contractor
Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
45
Passing score
70%
Exam time
120 min
Administered by
PSI Services Contractor
Format
Reference materials allowed
Alabama State Portion
45 questions
Sitework11 Q · 24%
Reading and interpreting plan views, profile views, and plan symbols for underground utility workSurveying instruments and techniques: optical levels, transits, grade rods, and GPSSetting line and grade using batter boards, offset stakes, and laser alignmentSite preparation operations: clearing and grubbing, access roads, utility location and protection, pavement cuttingTrench excavation methods, equipment selection, and trench dimensionsSoil compaction methods, Proctor testing, and field density testingDewatering techniques: pumping, wellpoint systems, and groundwater managementEstimating cut and fill quantities using cross section and average end area methods
Concrete10 Q · 22%
Cement types and properties (portland, blended, hydraulic cements)Supplementary cementitious materials (fly ash, slag cement, silica fume, natural pozzolans)Aggregates for concrete (grading, classification, characteristics, deleterious substances)Water-cementitious materials ratio and its effect on strength and durabilityConcrete mixture proportioning and designChemical admixtures (air-entraining, water-reducing, accelerating, retarding)Concrete durability (freeze-thaw resistance, sulfate attack, chloride penetration, permeability)Fresh concrete properties (workability, consistency, air content, bleeding, slump)
Curbs and Gutters4 Q · 9%
Gutter grade and cross slope design requirementsCurb and gutter dimensions and configurationsPavement encroachment limits by street classificationAllowable gutter flow capacity calculation using Manning's equationCross-street flow depth limits for minor and major storm eventsInlet types and placement at curb and gutter locationsStreet intersection drainage design criteriaReduction factors for allowable gutter capacity
Culverts3 Q · 7%
Culvert hydraulic design and flow control (inlet vs. outlet control)Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types)Pipe bedding classes and backfill requirements for culvertsStructural loads on buried culverts (earth loads, Marston's Theory, trench vs. embankment conditions)Superimposed live loads on culverts (highway, railroad, aircraft loading)Outlet protection and energy dissipation at culvert exits (riprap basins, apron design)Culvert installation procedures (trenching, shoring, pipe laying, joint assembly)Stability analysis for culvert structures (uplift, flotation, soil bearing pressure)
One Call3 Q · 7%
Purpose and scope of the Alabama Damage Prevention Law (§37-15-1)Key definitions under the One-Call law (excavator, operator, tolerance zone, working day, etc.)Notice of intent to excavate or demolish — timing, content, and validity periodsExcavator responsibilities within the tolerance zone and precautions to avoid damageOperator response to notice — marking requirements and APWA color codeEmergency excavation procedures and notification requirementsDesign and survey locate requests — submission and operator responseCivil penalties for violations and the Underground Damage Prevention enforcement process
Heavy Equipment/Safety4 Q · 9%
Excavation cave-in protection systems (sloping, benching, shoring, trench shields)Backhoe and track excavator operation and safetyMotor vehicle and earthmoving equipment requirements (brakes, seat belts, audible alarms, reverse signals)Rollover protective structures (ROPS) for construction equipmentCrane and derrick safety (ground conditions, power line clearances, inspections, operator certification)Personal protective equipment selection, use, and maintenanceSigns, signals, barricades, and flagging requirementsGeneral safety and health provisions (accident prevention programs, safety training, competent person duties)
Irrigation10 Q · 22%
Sprinkler head types, patterns, and performance characteristicsSprinkler head layout and spacing methods (square and triangular)Precipitation rates and calculating water application requirementsGeographical area analysis and circuit zoningBasic hydraulics: static and working pressure, friction loss, and velocityPipe sizing, routing, and loop configurations for irrigation systemsIrrigation system components: valves, controllers, backflow preventers, and pumpsDrip irrigation design: emitters, tubing layout, and soil wetting patterns
Key Distinctions
ScrapersvsTrucks
A scraper can dump its payload in uniformly thick layers, whereas trucks cannot, which improves compaction productivity in embankment construction.
Pipe and Excavation Contracting, Page 90
Standard Proctor (T-99 / ASTM D 698)vsModified Proctor (T-180 / ASTM D 1557)
Standard compacts three layers each struck 25 times with a 5.5-lb, 2-inch hammer (12,400 ft-lb), while the modified test compacts five layers each struck 25 times with a 10-lb hammer (56,250 ft-lb per cubic foot) and is specified for high-design-load areas such as heavy-duty paving, concrete drives, federal highways and runways.
Pipe and Excavation Contracting, Pages 183 to 184
Swell factorvsLoad factor
A swell factor converts in-place (bank) volume up to loose disturbed volume (e.g., 1.7 for broken asphalt/concrete slab), while a load factor converts loose cubic yards back to bank cubic yards.
Pipe and Excavation Contracting, Page 138
False setvsFlash set
False set is a loss of plasticity with little heat evolution caused by re-crystallization of secondary gypsum and is restored by continued mixing without added water; flash set (rapid C3A hydration) gives off considerable heat and cannot be dispelled by further mixing.
Design and Control of Concrete Mixtures (17th ed.), Page 48 — Early Stiffening (False Set and Flash Set) section
Carbonation of fresh concrete (dusting)vsDelayed ettringite formation
Carbonation of freshly placed, unhardened concrete from unvented heaters or gasoline-powered equipment in an enclosure gives a soft, chalky, dusting surface; delayed ettringite formation is associated with concrete temperatures above about 70°C (158°F) and shows as paste expansion/gaps at aggregate interfaces, not surface dusting.
Design and Control of Concrete Mixtures (17th ed.), Page 227 — Carbonation
Field-cured cylinders cured alongside the structure evaluate curing and protection adequacy — adequate if their average strength at the age designated for f'c is at least 85% of companion standard-cured cylinders (or exceeds f'c by more than 3.5 MPa / 500 psi); the 75% figure instead applies to the lowest individual drilled core for in-place strength.
Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Cast-in-place cylinders are molded in and cured with the member (intended for members 5 in. to 12 in. deep) to verify in-place strength before construction continues, instead of relying on separately standard-cured cylinders.
Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
Hard-troweled (steel-troweled) finishvsFloat or broom finish
Concrete with more than 3% entrained air should not be given a hard-troweled finish (risk of delaminations), which is why slabs at the 6%-or-more air contents typical of exterior freeze-thaw exposure receive float or broom finishes.
Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Equipment in transit, no load, boom loweredvsEquipment working near energized lines
In transit with no load and boom lowered, minimum clearance is 4 ft under 50 kV, 10 ft over 50 kV up to and including 345 kV, and 16 ft up to and including 750 kV; when working, clearance is computed under §1926.600(a)(6)(ii) as 10 ft plus 0.4 in. per kV over 50 kV.
OSHA 29 CFR 1926, §1926.600(a)(6)(iii)
Undisturbed native soilvsSoil in an old, previously dug trench line
In certain soils, digging resistance is usually greater in undisturbed earth, so old ditch soil is usually easier digging; the grademan can often spot old crossline trenches by darker spots of topsoil mixed in with lighter-colored subsoil.
Pipe and Excavation Contracting, Page 148
Heaped bucket capacityvsStruck bucket capacity
Depending on soil type, heaped capacity is usually about 130 percent of struck capacity (e.g., a 2-ft hoe bucket struck at 5–6 LCF heaps about 6.5–8 LCF).
Pipe and Excavation Contracting, Pages 142-143
Light utility dozers (40–80 hp)vsMid-sized production dozers (80–200 hp)
Light utility dozers (blade capacity 1.25–2.25 cu yd) are listed for residential/commercial foundations, fine grading, trench backfill, landscaping, light logging and swamp dozing, while mid-sized production dozers list logging and tree and stump removal.
Oxygen enriched means more than 23.5 percent oxygen by volume and oxygen deficient means less than 19.5 percent; either is a hazardous atmosphere under the confined spaces standard.
A person who complies with the notification requirements is not liable for damage only if the operator received the required notice, the operator failed to locate its facilities as required by §37-15-6, and the damage is a proximate result of that failure to locate.
Clearance for equipment in transit (§1926.600(a)(6)(iii)) OSHA 29 CFR 1926, §1926.600(a)(6)(iii)
Minimum clearance from energized overhead lines for equipment in transit with no load and boom lowered: 4 ft under 50 kV, 10 ft over 50 kV up to and including 345 kV, and 16 ft up to and including 750 kV.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A segregation-resistance test in which unconsolidated low-slump concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, stripped and inspected; a common slipform paving target is edge slump of 6 mm (0.25 in.) or less.
Cast-in-place cylinder method (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
Cylindrical molds filled during normal placement and cured in the member, then removed and tested, usable in concrete 125 mm to 300 mm (5 in. to 12 in.) deep and particularly applicable to cold-weather concreting, post-tensioning work and slabs.
Carbonation of unhardened concrete (dusting) Design and Control of Concrete Mixtures (17th ed.), Page 227 — Carbonation
Carbonation of freshly placed concrete that produces a soft, chalky surface, usually during cold-weather concreting when unvented heaters or gasoline-powered equipment in an enclosure put unusual amounts of carbon dioxide in the air.
Complete hydration water requirement Design and Control of Concrete Mixtures (17th ed.), Chapter 2 — Water (Evaporable and Nonevaporable) section, Page 43
Complete hydration of portland cement requires about 40% water by mass of cement (w/c of 0.40); below about 0.40 some cement remains unhydrated for lack of water.
Cold-weather subgrade temperature differential Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
In cold weather, the difference between the surface temperature of supporting materials and the concrete should be held to less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss and plastic shrinkage cracking; concrete must not be placed on frozen subgrade.
Free-fall placement in piers and piles Design and Control of Concrete Mixtures (17th ed.), Page 477 — Structures, Piers and Piles section
Concrete for piles and piers may be dropped freely down the shaft or placed by trunk, with depths up to 45.7 m (150 ft) producing no appreciable segregation or loss of strength.
Steam curing effect on creep and shrinkage Design and Control of Concrete Mixtures (17th ed.), Page 202 — Chapter 10, Creep section (Figure 10-32)
Very little creep occurs in high-pressure steam (autoclaved) concrete and atmospheric steam-cured concrete has considerably less creep than 7-day moist-cured concrete; the two steam-curing methods reduce drying shrinkage only about half as much as they reduce creep.
The sequence of a typical backhoe cycle: (1) load bucket, (2) lift load, (3) swing and prepare to dump, (4) dump bucket load, and (5) return to dig.
Mobilization cost Pipe and Excavation Contracting, Page 60
A project cost that is sometimes itemized separately on the bid; if it is not, it must be included in the equipment cost calculations.
Trench box placement Pipe and Excavation Contracting, Page 170
The bottom of the trench box should sit 2 to 3 feet higher than the pipe so pulling the box does not disturb bedding and newly laid pipe; more than 5 feet above the pipe makes the ditch unsafe.
Cemented soil trench walls Pipe and Excavation Contracting, Page 171
Some cemented soils are quite stable, but it is wise to consider all trench walls over 5 feet high to be dangerous and always use cave-in protection.
Ripper tooth angles Pipe and Excavation Contracting, Page 279
A 60-degree tip angle gives good initial penetration, 45 degrees exerts good lifting or prying force, and 35 degrees while raising the shanks is used to pry out boulders.
The application rate in inches per hour found from the constant 96.3 times the total GPM of all heads in an area divided by the total square feet of area being covered.
Barbed male elbow / rigid nipple / flexible riser Simplified Irrigation Design, Chapter 21 (Fittings for the Irrigation System)
Irrigation fittings: the barbed male elbow is a PE fitting attaching PE flexible swing pipe to a PVC threaded tee; a rigid nipple is a small extension connecting two threaded street elbows in a swing joint (also used to raise a head set too deep); a flexible riser is a PE lateral-line fitting cut to length for bubblers and fixed spray heads that bends and pops back when stepped on.
Curb inlet interception rule of thumb Design and Construction of Urban Storm Water Management Systems, Chapter 8, Pages 246 to 247
When locating successive curb inlets on a continuous grade by trial and error, 70-80% of the approaching gutter flow is a reasonable interception assumption, with succeeding inlets sized for the bypassing (carryover) flow plus intervening street flow.
Formulas to Know
Average net cut depth for a takeoff grid cellNet cut = average plan cut − stripped topsoil thickness + replaced topsoil thickness; worked example: 1.80 − 0.50 + 0.33 = 1.63 ft
Bank-to-loose volume for broken asphalt/concrete slabLCY = BCY × 1.7 (always allow a swell factor of 1.7 for broken slab); worked example: 1,400 BCY × 1.7 = 2,380 LCY. Load factor (loose→bank) = bank volume ÷ (bank volume + swell percentage).
Import quantity when balancing cut and fillConvert both quantities to the same soil state before subtracting, using the conversion factors given for the material/compaction specified: Import = fill LCY − cut LCY. Worked example (dry common earth placed at 100% Standard Proctor, 1.32 LCY/BCY and 1.54 LCY/CCY): 4,000 BCY × 1.32 = 5,280 LCY; 4,000 CCY × 1.54 = 6,160 LCY; 6,160 − 5,280 = 880 LCY import.
Motor-grader production and hoursProduction = (blade width ft × speed mph × 5,280 × job efficiency × operator ability) ÷ number of passes; worked example: (12 × 4 × 5,280 × 0.83 × 0.75) ÷ 5 = 31,553 SF/hr = 3,506 SY/hr; 30,000 SY ÷ 3,506 = about 8.6 hours
Linear feet of trench per hour (backhoe)BCF/LF = width × depth; LCF/LF = BCF × (1 + swell); LCF per set = LCF/LF × set length; cycles per set = LCF per set ÷ bucket load; time per set = (cycles × cycle seconds) + move-up seconds; sets/hr = 3,600 s ÷ time per set; LF/hr = sets/hr × set length. Worked example: 2×4 = 8 BCF; ×1.3 = 10.4 LCF; ×8 ft set = 83.2 LCF; ÷8 LCF bucket = 10.4 cycles; (10.4×12)+15 = 139.8 s = 2.33 min; 60 ÷ 2.33 = 25.75 sets/hr; ×8 = 206 LF/hr
Height of instrument when grade rod is set on TOP of the pipeHI = rod reading on hub + cut quantity − (pipe diameter plus wall thickness); worked examples: 4.78 + 12.66 − 1.25 = 16.19; 5.22 + 11.40 − 1.60 = 15.02 ft
Sprinkler precipitation rate (in./hr)PR = (96.3 × total GPM of all heads in the area) ÷ total square feet of area being covered
Pressure change with elevation0.433 psi (0.03 kg/cm²) pressure change for each 1 ft (0.3 m) of elevation rise or fall
Concrete takeoff for footings, slabs and wallsContinuous footing: length = outside perimeter; volume = L × width × depth ÷ 27 (e.g., 124 × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 cu yd). Pier footings: each L × W × D ÷ 27 (e.g., 3 piers at 2.5 × 2.5 × 1 = 18.75 cu ft ÷ 27 = 0.69 cu yd). 4-in. slab (Table 11-1): sq ft ÷ 81 = cu yd (e.g., 960 ÷ 81 = 11.85). 8-in. wall: (wall sq ft ÷ 100) × 2.47 cu yd (e.g., 1,088 ÷ 100 × 2.47 = 26.87). Form contact area = 2 × perimeter × height. Ordering rule: footings round UP to next quarter yard (5.10 → 5.25); combined totals round up to next whole yard (17.65 → 18).