Alabama Drainage, Irrigation and Flood Control Contractor Exam: A Practical Study Guide
The Alabama Drainage, Irrigation and Flood Control Contractor exam tests the rules and the reference books behind the work. This guide lays out the job: the key facts from the official bulletin, what the exam covers, the books you need, sample questions with answers, and how to get ready. PSI gives the exam.
The Alabama Drainage, Irrigation and Flood Control Contractor Exam at a Glance
Here's the rundown from the official bulletin:
| Questions | 45 scored questions plus up to 10 unscored experimental questions that count against your time |
| Time limit | 2 hours |
| Passing score | 70% correct |
| Books in the exam room | Open book |
| Exam fee | $96 |
On exam day
- You must present one valid government-issued photo and signature identification that matches the name used when scheduling.
- You should arrive at least 30 minutes before your appointment.
- Reference books must be otherwise unmarked and may not contain loose or attached additional papers, and references are not supplied at the examination center.
- Books may be highlighted, underlined and indexed and tabbed with permanent tabs only, but may not be written in, and Post-It style temporary tabs must be removed before the exam begins.
- A silent, nonprinting, non-programmable calculator may be used in the examination center.
- Only approved items may be taken into the examination room, and personal belongings such as electronic devices, purses, reading material, writing devices, food and drinks must be left in secure storage.
References you may bring
- Alabama 1Call – Dig Safely; AL Act 94-487 S.299
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA), with latest available amendments
- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI, with latest available amendments
- Pipe and Excavation Contracting, Dave Roberts (2011)
- Simplified Irrigation Design, Pete Melby (1995, 2nd edition)
- Design and Control of Concrete Mixtures, Steven H. Kosmatka (16th Edition)
- Design and Construction of Urban Storm Water Management Systems (1992)
Scheduling, changes and retakes
- You may register and schedule online at PSI's website or by calling PSI at (855) 257-1619.
- All eligibilities are valid for 1 year from the date the application is received by the state, and if you do not pass within that year you must reapply with the state.
- You may cancel and reschedule without forfeiting your fee if your cancellation notice is received 2 days before the scheduled examination date, using the PSI website or by speaking to a PSI representative.
- You forfeit your examination fee and cannot test if you miss the appointment, arrive after the examination start time, fail to cancel 2 days in advance, or do not present proper identification.
- Results are given immediately on screen and emailed, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
- You may take the examination an unlimited number of times during the 1-year period, paying the fee for each registration.
Source: State of Alabama General Contractors Candidate Information Bulletin, Updated 1/23/26. Check the bulletin before test day: fees and rules can change.
What the Alabama Drainage, Irrigation and Flood Control Contractor Exam Covers
The official content outline breaks the exam into 7 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Sitework | 11 | 24% |
| Concrete | 10 | 22% |
| Curbs and Gutters | 4 | 9% |
| Culverts | 3 | 7% |
| One Call | 3 | 7% |
| Heavy Equipment/Safety | 4 | 9% |
| Irrigation | 10 | 22% |
How to Get Ready for the Alabama Drainage, Irrigation and Flood Control Contractor Exam
Treat your reference books like your tools. On an open-book exam you don't need every rule memorized. You need to know which book holds it and where to find it.
Buy the books the bulletin lists, in the editions it names. An older or newer edition can put the answer on a different page, or change it.
Learn your way around each book before you study anything else. The table of contents and the index are your layout.
Highlight what you look up most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Put in the reps with timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 2 minutes 11 seconds per question.
Measure twice. When you miss a practice question, find the section in your book, read it and mark it. Keep at it until you pass practice exams consistently.
The Books for the Alabama Drainage, Irrigation and Flood Control Contractor Exam
The reference list allowed in the examination center includes Alabama 1Call – Dig Safely, 29 CFR Part 1926 (OSHA) or the PSI Selections, Pipe and Excavation Contracting, Simplified Irrigation Design, Design and Control of Concrete Mixtures, and Design and Construction of Urban Storm Water Management Systems.
Where to get them:
- Alabama 1Call – Dig Safely; AL Act 94-487 S.299
- OSHA 29 CFR 1926
- Pipe and Excavation Contracting
- Simplified Irrigation Design
- Design and Control of Concrete Mixtures
- Urban Storm Water Management Systems
Working the Exam on Test Day
Work the exam in two passes. On the first pass, answer everything you know and bookmark the rest. Every exam lets you come back to bookmarked questions, though some lock the ones you've seen once you take a break. On the second pass, go back to your bookmarks and take them one at a time.
Don't get hung up on one question. You have 2 hours for 45 scored questions plus up to 10 unscored experimental questions that count against your time, which is about 2 minutes 11 seconds per question. Before you finish, make sure nothing is left blank.
Study Tips
Don't choose a word simply because it looks familiar. On difficult questions, you may not recognize several words in the answer choices—but that doesn't mean they're invented. Test writers only use real words. If you recognize the words in only one answer choice, focus on that choice and evaluate it carefully. If it's correct, great. If not, eliminate it. Every answer choice you eliminate improves your odds, even if you end up guessing among the remaining options.
If you've actually studied, an option full of unfamiliar terms is usually a distractor. A choice you don't recognize at all is rarely the correct one.
A little anxiety before an exam is completely normal — acknowledge it instead of fighting it. If you feel yourself spiraling on a question, pause and take a few slow breaths to reset. If your test center allows a short break, use it; just remember the clock usually keeps running.
Skim the answer choices before you commit. You're hunting for the key term or vocabulary word that signals the right concept. The more you've practiced, the faster the right wording jumps out at you.
Sample Alabama Drainage, Irrigation and Flood Control Contractor Questions
These come from our practice question bank, each with its answer and the reference behind it.
Sample 1 — Curbs and Gutters
Question: You are checking a curbed local street against major-storm criteria. Runoff from an overloaded gutter must cross the street to reach an inlet on the opposite side. For the major design runoff on a local or collector street, what is the typical allowable cross-street flow depth?
- A. 6 inches above the gutter flow line
- B. 6 inches over the street crown
- C. 12 inches above the gutter flow line
- D. 18 inches above the gutter flow line
Correct Answer: D
Design and Construction of Urban Storm Water Management Systems, Table 8.5 (Page 257), lists typical allowable cross-street flow for local and collector streets as 18 inches of depth above the gutter flow line for the major design runoff. The 6-inch depth at the gutter or in cross pans is the MINOR design runoff limit, and 6 inches or less over the crown applies to arterials and freeways during the major event.
Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 257 (Table 8.5)
Sample 2 — Heavy Equipment/Safety
Question: As the contractor on a public works drainage job, you are opening a trench for culvert installation in soil a competent person has classified as Type A. The trench will be 11 feet deep, no support or shield system will be used, the sides will be simple-sloped with no benching, and the trench will be backfilled and closed approximately 20 hours after it is opened. What is the maximum allowable slope, expressed as horizontal to vertical?
- A. 1:1
- B. 1 1/2:1
- C. 3/4:1
- D. 1/2:1
Correct Answer: D
Per 29 CFR 1926, Subpart P, Appendix B, Figure B-1 (B-1.1), simple slope excavations in Type A soil 20 feet or less in depth normally require a maximum allowable slope of 3/4:1. However, the short-term exception permits a maximum allowable slope of 1/2:1 for simple slope excavations that are open 24 hours or less and are 12 feet or less in depth. The 11-foot depth and 20-hour exposure meet both conditions, so 1/2:1 is permitted. 1:1 is the Type B simple-slope value and 1 1/2:1 is the Type C value.
Reference: OSHA 29 CFR 1926, Subpart P, Appendix B, Figure B-1 (B-1.1) and §1926.652(b)(2)
Sample 3 — Culverts
Question: As the contractor reviewing plans for riprap channel protection at a culvert outlet, you must verify the design storm used for sizing the protection and the steepness of the apron side slopes. Which combination meets the recommended criteria?
- A. 50-year design runoff; side slopes 2:1 or flatter
- B. 25-year design runoff; side slopes 3:1 or flatter
- C. 10-year design runoff; side slopes 3:1 or flatter
- D. 25-year design runoff; side slopes 2:1 or flatter
Correct Answer: D
Per Chapter 9, the design of riprap protection at conduit/culvert outlets is normally based on a 25-year design runoff event, and the apron side slopes should be 2:1 or flatter (consistent with the recommended maximum design side slope for riprap).
Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 9 — Riprap Protection at Outlets, Pages 351-354
Sample 4 — One Call
Question: For purposes of Alabama's underground damage prevention law, "working day hours" are defined as which span of local time on working days?
- A. 7:00 A.M. to 7:00 P.M.
- B. 6:00 A.M. to 6:00 P.M.
- C. 8:00 A.M. to 5:00 P.M.
- D. 7:00 A.M. to 5:00 P.M.
Correct Answer: D
Ala. Code §37-15-2(30) defines "working day hours" as the time from 7:00 A.M. to 5:00 P.M. local time on working days. Notification center services are to be provided during these hours.
Reference: Alabama 1Call – Dig Safely; AL Act 94-487 S.299, §37-15-2(30) Definitions — Working Day Hours
Why Practice Online Instead of With a PDF
A PDF is like reading about a job instead of doing it. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results break your score down by topic so you know where to put in more work.
Get Started
Take the free Alabama Drainage, Irrigation and Flood Control Contractor practice exam to see where you stand, then put your time into the topics that need it. For the official rules, read the exam bulletin, and see the licensing board's website.