Alabama · PSI

Alabama Drainage, Irrigation and Flood Control Contractor Practice Exam

45 questions 120 minutes 70% to pass 7 topics 2:40 per question Open book 283 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$5.95

Complete exam simulation matching the real PSI test format.

  • 45 questions (same as real exam)
  • 120 minute time limit
  • 7 topic areas covered
  • 283 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 7 topic quizzes and this full exam, plus the Business and Law exam. $59.95/month.
See the study course

Alabama Drainage, Irrigation and Flood Control Contractor Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Questions per topic, out of 45
Sitework11
Concrete10
Irrigation10
Curbs and Gutters4
Heavy Equipment/Safety4
Culverts3
One Call3

This practice exam is laid out like the official content outline for the Alabama Drainage, Irrigation and Flood Control Contractor exam: Sitework, Concrete, Curbs and Gutters, Culverts, One Call, Heavy Equipment/Safety, Irrigation.

Two ways to practice: the free practice exam gives you 10 questions per attempt, as often as you want. The full practice exam gives you 45 questions on a 2 hours clock, with a new draw from our question bank every time.

7 topics

Sitework 11 items

Our study plan for this topic: Reading and interpreting plan views, profile views, and plan symbols for underground utility work; Surveying instruments and techniques: optical levels, transits, grade rods, and GPS; Setting line and grade using batter boards, offset stakes, and laser alignment; Site preparation operations: clearing and grubbing, access roads, utility location and protection, pavement cutting; Trench excavation methods, equipment selection, and trench dimensions; Soil compaction methods, Proctor testing, and field density testing; Dewatering techniques: pumping, wellpoint systems, and groundwater management; Estimating cut and fill quantities using cross section and average end area methods.

Concrete 10 items

Our study plan for this topic: Cement types and properties (portland, blended, hydraulic cements); Supplementary cementitious materials (fly ash, slag cement, silica fume, natural pozzolans); Aggregates for concrete (grading, classification, characteristics, deleterious substances); Water-cementitious materials ratio and its effect on strength and durability; Concrete mixture proportioning and design; Chemical admixtures (air-entraining, water-reducing, accelerating, retarding); Concrete durability (freeze-thaw resistance, sulfate attack, chloride penetration, permeability); Fresh concrete properties (workability, consistency, air content, bleeding, slump).

Curbs and Gutters 4 items

Our study plan for this topic: Gutter grade and cross slope design requirements; Curb and gutter dimensions and configurations; Pavement encroachment limits by street classification; Allowable gutter flow capacity calculation using Manning's equation; Cross-street flow depth limits for minor and major storm events; Inlet types and placement at curb and gutter locations; Street intersection drainage design criteria; Reduction factors for allowable gutter capacity.

Culverts 3 items

Our study plan for this topic: Culvert hydraulic design and flow control (inlet vs. outlet control); Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types); Pipe bedding classes and backfill requirements for culverts; Structural loads on buried culverts (earth loads, Marston's Theory, trench vs. embankment conditions); Superimposed live loads on culverts (highway, railroad, aircraft loading); Outlet protection and energy dissipation at culvert exits (riprap basins, apron design); Culvert installation procedures (trenching, shoring, pipe laying, joint assembly); Stability analysis for culvert structures (uplift, flotation, soil bearing pressure).

One Call 3 items

Our study plan for this topic: Purpose and scope of the Alabama Damage Prevention Law (§37-15-1); Key definitions under the One-Call law (excavator, operator, tolerance zone, working day, etc.); Notice of intent to excavate or demolish — timing, content, and validity periods; Excavator responsibilities within the tolerance zone and precautions to avoid damage; Operator response to notice — marking requirements and APWA color code; Emergency excavation procedures and notification requirements; Design and survey locate requests — submission and operator response; Civil penalties for violations and the Underground Damage Prevention enforcement process.

Heavy Equipment/Safety 4 items

Our study plan for this topic: Excavation cave-in protection systems (sloping, benching, shoring, trench shields); Backhoe and track excavator operation and safety; Motor vehicle and earthmoving equipment requirements (brakes, seat belts, audible alarms, reverse signals); Rollover protective structures (ROPS) for construction equipment; Crane and derrick safety (ground conditions, power line clearances, inspections, operator certification); Personal protective equipment selection, use, and maintenance; Signs, signals, barricades, and flagging requirements; General safety and health provisions (accident prevention programs, safety training, competent person duties).

Irrigation 10 items

Our study plan for this topic: Sprinkler head types, patterns, and performance characteristics; Sprinkler head layout and spacing methods (square and triangular); Precipitation rates and calculating water application requirements; Geographical area analysis and circuit zoning; Basic hydraulics: static and working pressure, friction loss, and velocity; Pipe sizing, routing, and loop configurations for irrigation systems; Irrigation system components: valves, controllers, backflow preventers, and pumps; Drip irrigation design: emitters, tubing layout, and soil wetting patterns.

3 questions

Sample 1 — Sitework

Question: You are a contractor dewatering a foundation site using wellpoints. What is the typical suction lift limitation for wells in a wellpoint system?

  • A. 30 feet
  • B. 15 feet
  • C. 20 feet
  • D. 10 feet

Correct Answer: C

According to Pipe & Excavation Contracting, Chapter 10, wells in a wellpoint system are usually limited to a 20-foot suction lift.

Reference: Pipe and Excavation Contracting, Chapter 10 — Dealing with Rock & Groundwater, Page 293

Sample 2 — Concrete

Question: As the contractor proportioning concrete for a reinforced structure that will be built in a coastal seawater/brackish-water environment, you must select a portland cement that both binds chloride ions (favoring a higher tricalcium aluminate content) and resists seawater sulfates (favoring a lower tricalcium aluminate content). What tricalcium aluminate (C3A) content range in the portland cement has been found to provide satisfactory performance for this balance?

  • A. 4% to 10%
  • B. 0% to 4%
  • C. 12% to 18%
  • D. 10% to 15%

Correct Answer: A

Design and Control of Concrete Mixtures, Chapter 11 (Durability), 'Materials and Methods for a Marine Environment,' states that cement for a marine environment must balance the benefit of higher C3A content for binding chlorides against the need for sulfate resistance (low C3A). Portland cements with C3A contents ranging from 4% to 10% have been found to provide satisfactory protection against seawater sulfate attack as well as protection against chloride-induced reinforcement corrosion. The same section notes that water-cementitious materials ratios should not exceed 0.40 for marine exposures and that in northern climates the concrete must contain at least 6% air.

Reference: Design and Control of Concrete Mixtures (17th ed.), Chapter 11 — Materials and Methods for a Marine Environment section, Page 240

Sample 3 — Irrigation

Question: Many experienced irrigation contractors follow a practice of never using pipe smaller than what nominal size on a job?

  • A. 1-1/4 in (32 mm)
  • B. 1 in (25 mm)
  • C. 1/2 in (13 mm)
  • D. 3/4 in (19 mm)

Correct Answer: B

According to Chapter 8 (Sizing Irrigation Pipe), many good contractors never use pipe smaller than 1 in (25 mm). While designers may specify various sizes, this is a common practice among experienced contractors.

Reference: Simplified Irrigation Design, Sizing Irrigation Pipe, Chapter 8

Your first attempt is an inspection, not a final grade. The results page breaks your score down by outline topic, so you can see which areas need work. Compare it with the real exam's passing score, 70% correct, and keep practicing until you pass consistently.

  • Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
  • Work your bookmarks on the second pass.
  • Keep your pace. The real exam works out to about 2 minutes 11 seconds per question.
  • After each attempt, look up each missed question's reference in your book and read the section.

Questions 45 scored questions plus up to 10 unscored experimental questions that count against your time
Time limit 2 hours
Passing score 70% correct
Books in the exam room Open book
Exam fee $96
  • Results are given immediately on screen and emailed, with a diagnostic report of strengths and weaknesses for candidates who do not pass.
  • You may take the examination an unlimited number of times during the 1-year period, paying the fee for each registration.

Source: State of Alabama General Contractors Candidate Information Bulletin, Updated 1/23/26. Check the bulletin before test day: fees and rules can change.

10 free questions30 min · no account