Exam Cheat Sheet · Quick Reference
Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Exam
Arkansas · PSI Services Contractor
Arkansas State Portion 30 questions
Key Distinctions
The thickened slab area acts like a footing but is formed by a trench dug into the subgrade (strengthened with rebar) rather than by formwork.
Carpentry and Building Construction, Section 11.1, Page 295Five bags of cement per cubic yard is the minimum amount considered acceptable for most work, while six-bag mix is commonly specified where high strength is needed or where steel reinforcement is used.
Carpentry and Building Construction, Section 8.2, Page 226Class A involves wood, paper, cloth and plastic and Class B involves grease, oil and chemicals, whereas Class C involves electrical equipment and Class D involves combustible metals.
Carpentry and Building Construction, Construction Safety & Health, Page 81Type M has high compressive strength and durability for heavily loaded or below-grade foundation walls; Type N is for general masonry above grade, Type S for earthquake/high-wind zones, and Type O is low-strength mortar for interior walls.
Carpentry and Building Construction, Section 10.3, Page 279Type III (high-strength) gains strength faster and is used where forms must be removed quickly or concrete put into service quickly.
Carpentry and Building Construction, Chapter 8 — Table 8-1: Basic Types of Portland CementColumns and walls might use a 4" to 8" slump so concrete flows into narrow forms, while paving and floor slabs might use a 1" to 4" slump.
Carpentry and Building Construction, Chapter 8 — Slump Testing sectionEfflorescence is a whitish crystalline salt deposit on the surface that is cosmetic and generally does not affect strength or durability, while chalking is loose surface powder so weak it can be crushed by traffic or scratched with light pressure.
Carpentry and Building Construction, Chapter 8 — Troubleshooting Concrete sectionScreeding is always the first finishing step, striking off concrete just after placement; bullfloating follows shortly after while the concrete is still wet enough to bring mortar paste to the surface.
Carpentry and Building Construction, Chapter 11 — Steps in Finishing sectionFlat seam joints may be sealed with sealant except where the pitch is less than 3 in. per ft (250 mm per m), where they must be soldered; in snow areas all seams subject to flooding from ice damming must be soldered regardless of pitch.
SMACNA Architectural Sheet Metal Manual (7th ed.), Flat Seam Roofs, Figure 6-3NRCA recommends copper, lead-coated copper, and stainless steel because they can be soldered or welded for critical watertight seaming, while prefinished or other metals that do not allow soldering or welding are not recommended.
NRCA Roofing Manual: Architectural Metal Flashing, Chapter 3, Page 104Shorter downspouts shall have two straps of support, while longer downspouts shall be supported at 10 ft (2.5 m) maximum intervals.
SMACNA Architectural Sheet Metal Manual (7th ed.), Page 1.80For open valleys each section of metal valley flashing should lap at least 4 inches over the next lowest section (sides extending at least 8 inches up each roof), whereas NRCA calls for metal valley sections to overlap a minimum of 8 inches over adjacent upslope sections.
Carpentry and Building Construction, Section 22.2 — Open Valleys, MetalUnder §1926.35(e)(3) employers with 10 or fewer employees may communicate the emergency action plan orally and need not maintain a written plan.
OSHA 1926 CFR 29, §1926.35(e)(3)Wire chairs (usually 2" to 4" high) are the recommended, more precise support so concrete can flow under the mesh, while broken brick or similar materials are specifically cautioned against because they can draw moisture from the soil and cause corrosion.
Carpentry and Building Construction, Chapter 8 — Reinforcing Mesh sectionKey Terms
Formulas to Know
Minimum slope = 1 in. per 16 ft (1/16 in. per ft) toward the downspout; drop = run (ft) × 1/16 in. Worked example: 32 ft × 1/16 = 2 in. of total drop.Bags of cement per cubic yard: five-bag mix (5 bags/cu yd) is the minimum for most work; six-bag mix where high strength or steel reinforcement is used.Eleven courses of block above the footings + 4-inch solid cap block ≈ 7 ft 4 in. of headroom between joists and basement floor; each additional course adds 8 inches.Gutter length served by a downspout and gutter sections between ends or expansion joints shall not exceed 50 ft (15.2 m) unless special provisions for flexibility are made; distance from gutter high point to downspout should not ordinarily exceed 25 feet (Carpentry & Building Construction).Flat seam roofs exceeding 30 ft in any direction are divided into sections of 30 ft (9 m) maximum width, separated by expansion battens 1⅝ in. tall, 3 in. wide across the top, tapered on the vertical sides.Raised curbs must be designed high enough above the tapered insulation to allow minimum flashing heights of 8 inches; adjacent walls and openings must also allow minimum flashing heights.