Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Exam: A Practical Study Guide
The Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential exam tests the rules and the reference books behind the work. This guide lays out the job: the key facts from the official bulletin, what the exam covers, the books you need, sample questions with answers, and how to get ready. PSI gives the exam.
The Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Exam at a Glance
Here's the rundown from the official bulletin:
| Questions | 30 questions |
| Time limit | 75 minutes |
| Passing score | 21 correct answers out of 30 scored questions |
| Books in the exam room | Open book |
On exam day
- Candidates bring their own approved references (no extra loose or attached papers, and downloaded references must be bound), and while later editions of references may be used, Code questions are based only on the edition of the Code book listed.
- References may be highlighted, underlined, annotated and indexed before the exam but not written in during it, and only permanent tabs are allowed.
- Candidates will have access to an online calculator and may not bring their own calculator.
- Candidates use an on-screen online calculator and may not bring their own calculator or any additional loose or attached papers with their approved references.
References you may bring
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA), with latest available amendments
- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI, with latest available amendments
- International Residential Code for One- and Two-Family Dwellings (2015)
- NRCA Roofing Manual: Steep Slope Roof Systems (2017)
- Carpentry and Building Construction (2016)
- Architectural Sheet Metal Manual (2012)
- Gypsum Construction Handbook (7th edition, 2014)
- NRCA Roofing Manual: Metal Panel and SPF Roof Systems (2016)
Source: Arkansas Contractors Licensing Board – Detached Garage, Storage Buildings, Detached Structures, Metal Buildings – Residential, 10/17/2220. Check the bulletin before test day: fees and rules can change.
What the Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Exam Covers
The official content outline breaks the exam into 4 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Metal Roofing, Flashing, Gutters and Downspouts | 12 | 40% |
| Concrete | 8 | 27% |
| Screened Enclosures and Awnings | 6 | 20% |
| OSHA Safety | 4 | 13% |
How to Get Ready for the Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Exam
Treat your reference books like your tools. On an open-book exam you don't need every rule memorized. You need to know which book holds it and where to find it.
Buy the books the bulletin lists, in the editions it names. An older or newer edition can put the answer on a different page, or change it.
Learn your way around each book before you study anything else. The table of contents and the index are your layout.
Highlight what you look up most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
Do the big jobs first. Metal Roofing, Flashing, Gutters and Downspouts and Concrete make up 67% of the exam.
Put in the reps with timed practice exams. The clock trains you to find answers at the pace the real exam needs: about 2 minutes 30 seconds per question.
Measure twice. When you miss a practice question, find the section in your book, read it and mark it. Keep at it until you pass practice exams consistently.
The Books for the Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Exam
The bulletin lists the reference materials allowed in the examination center, including the OSHA 29 CFR Part 1926 regulations, the 2015 International Residential Code, two NRCA roofing manuals, Carpentry and Building Construction, the Architectural Sheet Metal Manual and the Gypsum Construction Handbook.
Where to get them:
- NRCA Roofing Manual: Steep Slope Roof Systems
- Carpentry and Building Construction
- Architectural Sheet Metal Manual
- Gypsum Construction Handbook
- NRCA Roofing Manual: Metal Panel and SPF Roof Systems
- IRC 2015
- OSHA 29 CFR 1926
Working the Exam on Test Day
Work the exam in two passes. On the first pass, answer everything you know and bookmark the rest. Every exam lets you come back to bookmarked questions. On the second pass, go back to your bookmarks and take them one at a time.
Don't get hung up on one question. You have 75 minutes for 30 questions, which is about 2 minutes 30 seconds per question. Before you finish, make sure nothing is left blank.
Study Tips
On an open-book exam, the winners aren't the smartest people in the room — they're the fastest at finding answers. Buy the required book, practice with it open, and tab and highlight each section the first time a question sends you there. Learn the index and table of contents until you can land on any topic in seconds. That speed is what separates a pass from a fail.
Know your way around each book's index and table of contents. Open-book exams reward speed: you need to find specific items quickly.
On an open-book exam, work through every question once: answer the ones you know and skip the ones you don't. Then go back to the ones you flagged. You can bookmark questions for later review, just like on our exams — and don't sink too much time into any single question. The clock is still running.
Give yourself at least three to six weeks. Use your exam's candidate bulletin as your roadmap for what's tested, and spend your time on finding-it-fast skills over rote memorization. In practice, aim for three clean passes at 80% or higher — setting your practice bar above the real cut score gives you a comfortable margin on test day.
Practicing against a ticking clock is the best way to beat exam-clock anxiety. Use these timed tests to build your pacing, so you learn to move steadily and never burn too long on a single question. By test day, the format feels routine.
Sample Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential Questions
These come from our practice question bank, each with its answer and the reference behind it.
Sample 1 — OSHA Safety
Question: As a gas contractor, you are setting up a new job site. According to OSHA, which of the following is NOT a required minimum element of an emergency action plan?
- A. Emergency escape procedures and route assignments
- B. Procedures to account for all employees after emergency evacuation
- C. A detailed inventory of all tools and equipment on site
- D. The preferred means of reporting fires and other emergencies
Correct Answer: C
According to the OSHA 1926 CFR 29 (§1926.35(b)), the minimum elements include emergency escape procedures, procedures for employees remaining for critical operations, procedures to account for all employees after evacuation, rescue and medical duties, preferred means of reporting emergencies, and names/titles of contact persons. A detailed inventory of tools and equipment is not a required element.
Reference: OSHA 1926 CFR 29, §1926.35(b), Page 33
Sample 2 — Metal Roofing, Flashing, Gutters and Downspouts
Question: When formed metal copings are installed on a parapet wall, why is caulking NOT recommended along the lower edges of the coping?
- A. Caulking would interfere with the mechanical attachment of the continuous cleat on the exterior face
- B. Caulking would create a galvanic reaction between the metal coping and the masonry wall substrate
- C. Caulking would void the warranty of the roofing membrane where it terminates at the parapet wall
- D. Caulking would prevent the coping from expanding independently of the wall, and trapped moisture could not escape from beneath the coping
Correct Answer: D
Per the Architectural Sheet Metal Manual, Chapter 3, the coping and wall expand at different rates, so sealant along the lower coping edges would not remain adhered long-term. Additionally, if both edges were sealed, moisture could not escape — sun-driven vapor pressure would force moisture up the wall and condensate would form under the coping and accumulate wherever caulking created a dam.
Reference: SMACNA Architectural Sheet Metal Manual (7th ed.), Chapter 3, Figure 3-1 Design Data
Sample 3 — Concrete
Question: What is the process called that removes air pockets and forces concrete into all parts of the forms during placement?
- A. Consolidation
- B. Slump testing
- C. Efflorescence
- D. Hydration
Correct Answer: A
According to the Carpentry and Building Construction textbook (Section 8.2), consolidation is a process that removes air pockets and forces the concrete into all parts of the forms. It can be accomplished with a concrete vibrator, by tamping, by spearing with a spade, or by tapping forms with a hammer.
Reference: Carpentry and Building Construction, Section 8.2, Page 227
Sample 4 — Screened Enclosures and Awnings
Question: The insect screening installed on an aluminum screen enclosure in a hurricane-prone region shall have a density of not more than:
- A. 24 × 24 mesh
- B. 20 × 20 mesh
- C. 16 × 16 mesh
- D. 14 × 14 mesh
Correct Answer: B
IRC 2015 Section AH106.3.2 limits screen density to not more than 20 threads per inch by 20 threads per inch mesh for screen enclosures in hurricane-prone regions.
Reference: IRC 2015 Section AH106.3.2
Why Practice Online Instead of With a PDF
A PDF is like reading about a job instead of doing it. Our practice exams are timed and on a screen, so you practice finding answers with the clock running. Each attempt draws a new set of questions from our bank, and your results break your score down by topic so you know where to put in more work.
Get Started
Take the free Arkansas Detached Garage, Storage Buildings, Detached Structures, Metal Buildings - Residential practice exam to see where you stand, then put your time into the topics that need it. For the official rules, read the exam bulletin, and see the licensing board's website.