Exam Cheat Sheet · Quick Reference

California C-10 Electrical Contractor Exam

California  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
115
Passing score
72%
Exam time
210 min
Administered by
PSI Services Contractor
Format
Closed-book

California State Portion 115 questions

Planning and Estimating 32 Q · 28%
Existing system evaluationPlan and specification interpretationElectrical calculationsCode requirementsMaterial selectionEnergy production and storage project planning (photovoltaic, wind, generators, batteries, capacitors)Load calculation methods for branch circuits, feeders, and services (Article 220)Conductor sizing, ampacity, and derating factorsVoltage drop calculations and conductor sizing for efficiencyDemand factors for specific loads (lighting, appliances, dryers, receptacles)Transformer sizing and overcurrent protection planningMotor circuit planning and full-load current determination +2 more
Rough Wiring 31 Q · 27%
System layoutClearance and accessibility requirementsRaceway and panel installationWire and equipment installationGrounding and bondingEnergy production and storage rough wiring (photovoltaic, wind, generators, batteries, capacitors)Conduit fill calculations and conductor count limits by raceway typeConduit bending techniques (stub-ups, offsets, saddle bends, back-to-back bends)Box fill calculations and box sizing requirementsCable wiring methods (NM, MC, AC, SE, UF, USE) — permitted uses and installation requirementsUnderground wiring installation requirements (burial depths, direct burial methods)Service entrance requirements (number of services, clearances, conductor sizing, raceway sealing) +1 more
Finish Wiring and Trim 13 Q · 11%
Finish device placement and installationMotor and equipment installationWire and equipment labelingTrims and sealantsEnergy production and storage finish wiring (photovoltaic, wind, generators, batteries, capacitors)Luminaire installation requirements and location restrictionsSwitch types, wiring configurations, and installation requirementsPanelboard and switchboard finish installation and circuit identificationReceptacle types, ratings, GFCI/AFCI protection, and accessibility complianceTransformer installation, overcurrent protection, and vault requirementsLow-voltage lighting system installation and voltage limitationsFixed electric space-heating equipment disconnecting means and control +1 more
Startup, Troubleshooting, and Maintenance 18 Q · 16%
System energizing and testingCommon electrical problemsLocation, repair, and replacement of inoperable electrical wires/componentsSelection and use of electrical testing equipmentEnergy production and storage system performance (photovoltaic, wind, generators, batteries, capacitors)Grounding and bonding system verification and testingOvercurrent protective device selection, ratings, and coordinationMotor and generator inspection, lubrication, and maintenance proceduresBattery commissioning, maintenance, and state-of-charge monitoringPV system commissioning procedures and functional testingTransformer connections and short-circuit current calculationsAutomatic transfer switch operation and generator startup procedures
Safety 21 Q · 18%
Lockout/tagout proceduresPersonal protective equipment (PPE)Tools/equipmentHazardous materials and job site environmentsInjury and Illness Prevention Program (IIPP) requirementsArc flash and shock hazard protection boundariesFall protection systems and requirementsGround-fault circuit interrupter (GFCI) and assured equipment grounding programsConfined spaces and enclosed spaces entry proceduresFire protection and prevention on construction sitesHeat illness prevention in outdoor work environmentsLadder safety and scaffold requirements

Key Distinctions

Branch Circuit, MotorvsGeneral branch circuit

A motor branch circuit is the conductors and equipment between the motor branch-circuit short-circuit and ground-fault protective device and an individual motor, while a general branch circuit begins at the final overcurrent device protecting the circuit.

California Electrical Code 2025, Article 100 (Definition of Branch Circuit, Motor)
FeedervsBranch circuit / service conductors

A feeder is all circuit conductors between the service equipment, source of a separately derived system, or other power supply source and the final branch-circuit overcurrent device, not the conductors past that device (branch circuit) nor the utility-to-premises conductors (service).

California Electrical Code 2025, Article 100 (Definition of Feeder)
MainvsFeeder

A main is a supply circuit of the same wire size for its entire length, with no cutouts in series, to which other circuits connect through automatic cutouts at several points, while a feeder runs from the original source of energy to a distributing center with no other circuits connected between the two.

American Electricians' Handbook, 17th ed., Division 3, Secs. 11-18 (Circuit nomenclature)
Monopole circuitvsBipolar circuit

A monopole circuit is a PV subset with two output conductors, one positive and one negative, while a bipolar circuit is a dc circuit comprised of two monopole circuits of opposite polarity connected to a common reference point.

California Electrical Code 2025, Article 100 (Definition of Monopole Circuit)
Compressed strandingvsCompact stranding

Compressed stranding presses only the outer layer of strands (diameter less than concentric but greater than compact), while compact stranding presses each layer of strands; concentric stranding is a straight central strand with helically laid layers and no pressing.

California Electrical Code 2025, Article 100 (Definitions of Stranding, Compressed; Stranding, Compact; Stranding, Concentric)
Type UF cable conductor sizesvsType NM/NMC cable conductor sizes

Type UF conductors run 14 AWG copper or 12 AWG aluminum/copper-clad aluminum through 4/0 AWG (340.104), while 2 AWG is the upper limit for Types NM and NMC under 334.104.

California Electrical Code 2025, Section 340.104
Three-wire controlvsTwo-wire control

Three-wire control uses a momentary-contact pilot device plus a holding-circuit contact and provides undervoltage protection (motor stays off after voltage loss), while two-wire control uses a maintained-contact pilot device and provides only undervoltage release, permitting automatic restarting.

American Electricians' Handbook, 17th ed., Sec. 251, Electric Controller Terminology (Three-Wire Control; Two-Wire Control; Undervoltage Protection; Undervoltage Release)
AFCI receptacle as first outlet (home-run limit)vsBranch/feeder AFCI breaker or metal-enclosed home run

An outlet/branch-circuit AFCI used as the first outlet on NM-cable wiring limits the home run to 50 ft on 15-A and 70 ft on 20-A circuits, but the length limit does not apply if the home run is metal-enclosed (raceway, MC, AC) or if an AFCI breaker originates the circuit.

American Electricians' Handbook, 17th ed., Division 4, Sec. 77 (Arc-fault circuit interrupters)
Devices permitted to be reconditioned (240.2(B))vsDevices that shall not be reconditioned (240.2(A))

Low-voltage power circuit breakers, electromechanical protective relays and current transformers may be reconditioned, while GFE equipment, GFCIs, low-voltage fuseholders and nonrenewable fuses, molded-case circuit breakers, and low-voltage power circuit breaker electronic trip units shall not be.

California Electrical Code 2025, Section 240.2
250.146(A) direct metal-to-metal yoke contactvs250.146(B) self-grounding contact device

250.146(A) permits a receptacle yoke in direct metal-to-metal contact with a surface-mounted metal box but requires removal of at least one insulating washer when the receptacle has no contact yoke, while 250.146(B) covers contact devices/yokes listed as self-grounding for flush-type boxes.

California Electrical Code 2025, Section 250.146(A)
EMT/FMC/cable connectors with seating shoulder (250.97 Exception)vsRigid metal conduit and IMC bonding

For circuits over 250 volts to ground with no oversized, concentric, or eccentric knockouts, a shouldered fitting seated tightly against the box with one locknut inside is permitted, whereas the two-locknut method (inside and outside) applies to RMC and IMC.

California Electrical Code 2025, Section 250.97
Wye–delta transformer bankvsDelta–delta and star–star banks

A wye–delta bank produces a 30-degree angular displacement between primary and secondary, while delta–delta and star–star banks have 0-degree displacement; banks with different angular displacements cannot be paralleled.

Ugly's Electrical References 2023, Three-Phase Standard Phase Rotation
Fire pump starting (locked-rotor) voltage drop limitvsGeneral voltage-drop recommendations

Fire pump supply conductors have a mandatory limit of 15 percent voltage drop at the controller terminals under locked-rotor/starting conditions, while the 3 percent feeder / 5 percent overall figures are nonmandatory recommendations for reasonable efficiency.

American Electricians' Handbook, 17th ed., Division 3, Sec. 35 (Allowable voltage drops)
PV panelvsPV string

A panel is a preassembled installation unit of a small group of modules (often three or four) physically and electrically connected together, while a string is a series-connected set of modules.

Photovoltaic Systems, 3rd Edition, Chapter 4 (Modules and Arrays)
Assured grounding program: daily visual inspectionvsAssured grounding program: continuity/terminal testing

Visual inspection of cord sets, caps, plugs, receptacles and cord- and plug-connected equipment is required before each day's use (except fixed receptacles/cord sets not exposed to damage), while continuity and terminal tests are required at intervals not exceeding 3 months (6 months for fixed items not exposed to damage).

Cal/OSHA Title 8, §2405.4(d)(3)

Key Terms

Branch Circuit, Motor (CEC 2025 Art. 100) California Electrical Code 2025, Article 100 (Definition of Branch Circuit, Motor)
The circuit conductors, including equipment, between the motor branch-circuit short-circuit and ground-fault protective device and an individual motor.
Feeder (CEC 2025 Art. 100) California Electrical Code 2025, Article 100 (Definition of Feeder)
All circuit conductors between the service equipment, the source of a separately derived system, or other power supply source and the final branch-circuit overcurrent device.
Monopole Circuit (CEC 2025 Art. 100) California Electrical Code 2025, Article 100 (Definition of Monopole Circuit)
An electrical subset of a PV system having two conductors in the output circuit, one positive (+) and one negative (−).
Cable, Medium Voltage (Type MV) (CEC 2025 Art. 100) California Electrical Code 2025, Article 100 (Definition of Cable, Medium Voltage (Type MV))
A single- or multiconductor solid dielectric insulated cable rated 2001 volts up to and including 35,000 volts, nominal.
Compressed stranding (CEC 2025 Art. 100) California Electrical Code 2025, Article 100 (Definitions of Stranding, Compressed; Stranding, Compact; Stranding, Concentric)
A stranding method in which the outer layer of strands is pressed together so the finished diameter is less than a concentric stranded conductor but greater than a compact stranded conductor.
Thermal protector (motor) American Electricians' Handbook, 17th ed., Div. 4, Sec. 67 (Thermal protector)
A heat-sensitive element installed in the motor windings at manufacture, rated in motor horsepower, that responds to currents in the range of 140 to 170 percent of nominal motor full-load current and may open the power circuit within the motor or a control circuit.
Arc flash boundary American Electricians' Handbook, 17th ed., Div. 13, Sec. 78 (Determining the arc flash boundary)
The approach limit from a prospective arc source at which incident energy equals 1.2 cal/cm², the level representing the onset of a second-degree burn on exposed skin.
PPE Category 2 head/face protection Ugly's Electrical References 2023, Electrical Safety: Personal Protection Equipment Guide (PPE Category 2)
Requires an arc-rated flash suit hood, or an arc-rated face shield worn together with an arc-rated balaclava; arc-rated jacket, parka, rainwear or hard hat liner are listed as needed (optional).
Minimum approach distance altitude correction (§2940.2(a)(2)(A)) Cal/OSHA Title 8 General Industry and Electrical Safety Orders, §2940.2(a)(2)(A)
Tabulated minimum approach distances must be adjusted using the Table 2940.2-7 altitude correction factors for work locations above 3,000 feet (900 meters); below that elevation the published distances may be used.
Sloping option without soil classification (§1541.1(b)(1)(A), Option 1) Cal/OSHA Title 8 Construction Safety Orders, §1541.1(b)(1)(A)
Permits excavation sides to be sloped no steeper than 1½ horizontal to 1 vertical (34 degrees from horizontal) — the Type C soil slope — with no soil classification, appendices or engineer.
PPE hazard assessment certification (§3380(f)(2)) Cal/OSHA Title 8, §3380(f)(2)
A written certification that identifies the workplace evaluated, the person certifying the evaluation was performed, the date(s) of the hazard assessment, and identifies the document as a certification of hazard assessment; the PPE selected need not be listed.
IIPP training documentation (§3203(b)(2)) Cal/OSHA Title 8, §3203(b)(2)
Records of safety and health training for each employee that include the employee name or other identifier, training dates, type(s) of training, and the training providers.
Class E protective helmet (§3381(c)(2)) Cal/OSHA Title 8 General Industry and Electrical Safety Orders, §3381(c)(2)
The ANSI Z89.1 electrical class designation required where there is risk of head injury from contact with electrical conductors greater than 600 volts (Class E or G permitted below 600 volts).
Chromium (VI) PEL (§1532.2(c)) Cal/OSHA Title 8 Construction Safety Orders, §1532.2(c)
No employee shall be exposed to airborne chromium (VI) in excess of 5 micrograms per cubic meter of air as an 8-hour time-weighted average; 2.5 µg/m³ is the action level.
Integrator (PV industry) Photovoltaic Systems, 3rd Edition, Chapter 1 (PV Industry — Integrators)
A business that designs, builds, and installs complete PV systems for particular applications by matching components from various manufacturers.
Balance-of-system (BOS) component Photovoltaic Systems, 3rd Edition, Chapter 1 (Manufacturers — BOS Components)
An electrical or structural component other than a major component required to complete a PV system, such as conductors, connectors, switchgear, fuses and mounting hardware.
PV troubleshooting levels Photovoltaic Systems, 3rd ed., Ch. 14 (Troubleshooting Levels)
A hierarchy of system, subsystem, component, and element, in which the array is a subsystem, an individual module is a component, and a PV cell is an element.
Neon (luminous-tube) transformer rating American Electricians' Handbook, 17th ed., Division 10, Sec. 138 (Neon transformer ratings)
Standard high-voltage luminous-tube transformers are rated by secondary voltage and short-circuit current in milliamperes, which with the gas and tubing diameter determine the maximum tubing footage.
NEMA 7 series receptacle Ugly's Electrical References 2023, Wiring Diagrams for NEMA Configurations
Straight-blade 2-pole, 3-wire grounding devices rated 277 volts (7-15R, 7-20R, 7-30R, 7-50R); the 6 series is the 250-volt equivalent.
Switch symbol S-sub-D Ugly's Electrical References 2023, Electrical Symbols (Switch Outlets)
In the standard electrical symbol list, a switch outlet marked S with subscript D designates a door switch (S2 = double-pole, S3 = three-way, S4 = four-way).

Formulas to Know

Ohm's law (all three forms)E = I × R; I = E / R; R = E / I — e.g., 8 A × 15 Ω = 120 V; 240 V ÷ 48 Ω = 5 A; 12 V ÷ 0.5 A = 24 Ω
Power in a dc/single-phase resistive circuitP = E × I; I = P / E; P = I² × R — e.g., 120 V × 12.5 A = 1,500 W; 1,800 W ÷ 120 V = 15 A; (4 A)² × 25 Ω = 400 W
Three-phase power and apparent powerP = √3 × V × I × cos θ; apparent power S = P ÷ PF (e.g., 200 kW ÷ 0.8 = 250 kVA). Raising PF at constant V and I raises real power; apparent power is unchanged.
Inductive reactanceXL = 2πfL (f = frequency, L = inductance) — not 2πfC
Resistances in parallel (joint resistance)R = 1 / (1/r1 + 1/r2 + 1/r3); two-resistor shortcut R = (R1×R2)/(R1+R2); equal resistors R = R/n — e.g., 6, 12, 4 Ω parallel = 2 Ω; 12∥4 = 3 Ω; two 30 Ω = 15 Ω
Series-parallel network solution sequenceCombine parallel banks first, add series resistances for R_total, then I_total = E / R_total; branch voltage = I_total × R_parallel and branch current = that voltage ÷ branch resistance — e.g., 3 + (12∥4=3) = 6 Ω, 24/6 = 4 A, 12 V across pair, 12/4 = 3 A through R3
Outlet box fill volume (CEC 314.16(B))Sum conductor allowances (each 12 AWG = 2.25 in.³) + one single allowance for internal cable clamps based on largest conductor + one single allowance for up to four EGCs + double allowance per yoke based on largest conductor connected — worked example: 4 insulated 12 AWG (9.00) + clamps (2.25) + EGCs (2.25) + receptacle yoke (4.50) = 18.00 in.³
Star-delta (wye-delta) overload element selection currentEnter overload tables at 58% of the across-the-line delta nameplate full-load current (elements carry winding/phase current) — worked example: 0.58 × 60 A = 34.8 A ≈ 35 A
Net profit on selling price from markup and overheadP = 100 − h − [10,000 ÷ (100 + m)], where m = markup based on cost and h = overhead as percent of gross sales — worked example: 10,000 ÷ 125 = 80, P = 100 − 20 − 80 = 0 percent
Charge control omission threshold for stand-alone PV with batteriesCharge control required unless (maximum array charge current × 1 hour) is less than 3% of rated battery capacity in Ah (about C/33) — worked example: 3% of 400 Ah = 12 A, so control is required at 12 A or more
EMT 90° stub-up bend markMark from end = stub height − take-up (take-up chart: ½" = 5 in, ¾" = 6 in, 1" = 8 in, 1¼" = 11 in) — e.g., 18 − 5 = 13 in; 12 − 6 = 6 in; 16 − 8 = 8 in; 16 − 11 = 5 in
EMT offset: distance between bend marks and shrinkDistance between bends = multiplier × offset depth (22½° = 2.6, 30° = 2.0, 45° = 1.4, 60° = 1.2); shrink per inch of offset = 3/16 in at 22½°… applied values used: 1/4 in (30°), 3/8 in (45°), 1/2 in (60°); first mark = measured distance to obstruction + shrink — e.g., 30° over 4 in: 2.0×4 = 8 in apart, shrink 1/4×4 = 1 in, first mark at 30+1 = 31 in
EMT three-point saddle layoutSide marks = 2.5 × obstruction height each side of the center mark (center bent 45°, sides 22½°); shrink = 3/16 in × obstruction height — e.g., 3 in pipe: 7½ in and 9/16 in shrink; 4 in: 10 in and 3/4 in; 5 in: 12½ in; 6 in: 15 in
Labor cost with overtime after 40 hours/weekTotal = (regular hours × rate) + (overtime hours × 1.5 × rate) — e.g., 40×$30 + 8×$45 = $1,560; two weeks at 50 hr/wk per worker: 80×$25 + 20×$37.50 = $2,750, ×2 workers (200 hr ÷ 100 hr) = $5,500
Material order with waste, quantity discount, promotion and taxQuantity = required × (1 + waste %); apply volume discount to the whole order; free units = total ÷ 11 for buy-10-get-1-free, then tax the discounted base — e.g., 220 × $15 × 0.95 = $3,135; 50 × $120 = $6,000 + 7% tax = $6,420
Subcontractor total with change-order markupTotal = base bid + change orders × (1 + markup) — e.g., $20,000 + $5,000 × 1.15 = $25,750
Unit conversions1 hp = 746 W; kilo = 1,000 (2,400 W = 2.4 kW); milli = 1/1,000 (350 mA = 0.35 A); 1 kcmil = 1,000 circular mils