California · PSI

California C-10 Electrical Contractor Exam Practice Exam

115 questions 210 minutes 5 topics 1:49 per question Closed book 628 questions in pool
Free Cheat Sheet Official Bulletin
Free

Free Practice Exam

$0

Test your knowledge with 10 questions from our pool of 20 free questions.

  • 10 questions per attempt
  • 30 minute time limit
  • Unlimited attempts
  • A new mix each time
  • Instant results
No account required.
Full Exam

Full Practice Exam

$9.95

Complete exam simulation matching the real PSI test format.

  • 115 questions
  • 210 minute time limit
  • 5 topic areas covered
  • 628 questions in pool
  • Detailed explanations
Price per attempt. Never the same exam twice: each attempt draws a fresh set of questions.
Not sure which exam you need? Text us: (813) 582-5360
Texts preferred · 9am–9pm Central
Want a guided study plan? Study Course: topic briefs, 5 topic quizzes and this full exam, plus the Law and Business Exam. $59.95/month.
See the study course

California C-10 Electrical Contractor Practice Exam Guide

Built from the official PSI exam bulletin. View the bulletin

What's on the exam

Approximate share of the exam, by topic
Planning and Estimating28%
Rough Wiring27%
Safety18%
Startup, Troubleshooting, and Maintenance16%
Finish Wiring and Trim11%

This practice exam is laid out like the official content outline for the California C-10 Electrical Contractor exam: Planning and Estimating, Rough Wiring, Finish Wiring and Trim, Startup, Troubleshooting, and Maintenance, Safety.

Two ways to practice: the free practice exam gives you 10 questions per attempt, as often as you want. The full practice exam gives you 115 questions on a 210 minutes clock, with a new draw from our question bank every time.

5 topics

Planning and Estimating — about 28% of the exam

The outline lists: Existing system evaluation; Plan and specification interpretation; Electrical calculations; Code requirements; Material selection; Energy production and storage project planning (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Load calculation methods for branch circuits, feeders, and services (Article 220); Conductor sizing, ampacity, and derating factors.

Rough Wiring — about 27% of the exam

The outline lists: System layout; Clearance and accessibility requirements; Raceway and panel installation; Wire and equipment installation; Grounding and bonding; Energy production and storage rough wiring (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Conduit fill calculations and conductor count limits by raceway type; Conduit bending techniques (stub-ups, offsets, saddle bends, back-to-back bends).

Finish Wiring and Trim — about 11% of the exam

The outline lists: Finish device placement and installation; Motor and equipment installation; Wire and equipment labeling; Trims and sealants; Energy production and storage finish wiring (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Luminaire installation requirements and location restrictions; Switch types, wiring configurations, and installation requirements; Panelboard and switchboard finish installation and circuit identification.

Startup, Troubleshooting, and Maintenance — about 16% of the exam

The outline lists: System energizing and testing; Common electrical problems; Location, repair, and replacement of inoperable electrical wires/components; Selection and use of electrical testing equipment; Energy production and storage system performance (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Grounding and bonding system verification and testing; Overcurrent protective device selection, ratings, and coordination; Motor and generator inspection, lubrication, and maintenance procedures.

Safety — about 18% of the exam

The outline lists: Lockout/tagout procedures; Personal protective equipment (PPE); Tools/equipment; Hazardous materials and job site environments. Our study plan adds: Injury and Illness Prevention Program (IIPP) requirements; Arc flash and shock hazard protection boundaries; Fall protection systems and requirements; Ground-fault circuit interrupter (GFCI) and assured equipment grounding programs.

3 questions

Sample 1 — Planning and Estimating

Question: A 480-volt, three-phase feeder uses 4/0 copper conductors (211,600 circular mils) to supply a 180-ampere load located 300 feet from the source. Using K = 12.9, what is the approximate voltage drop?

  • A. 6.6 volts
  • B. 5.7 volts
  • C. 3.3 volts
  • D. 11.4 volts

Correct Answer: B

Vd = (1.73 x K x L x I) / Cm = (1.73 x 12.9 x 300 x 180) / 211,600 = 1,205,118 / 211,600 = 5.7 volts. Using the single-phase multiplier of 2 instead of 1.73 would wrongly give about 6.6 volts.

Reference: Ugly's Electrical References 2023, Voltage Drop Calculations: Inductance Negligible

Sample 2 — Rough Wiring

Question: You are specifying structural members for a corrosion-resistant array mounting structure. Which aluminum structural alloys are commonly used in array designs because they are corrosion resistant, lightweight, and relatively inexpensive?

  • A. 1100 and 1350
  • B. 3003 and 5052
  • C. 6061 and 6063
  • D. 2024 and 7075

Correct Answer: C

Aluminum structural alloys 6061 and 6063 are commonly used in array mounting designs because they are particularly corrosion resistant, lightweight, and relatively inexpensive. For fasteners, stainless steel alloys 316 and 403 are recommended, especially in humid and marine climates.

Reference: Photovoltaic Systems, 3rd Edition, Chapter 10 — Mechanical Integration (Materials)

Sample 3 — Safety

Question: The periodic inspection of an employer's hazardous energy control (lockout/tagout) procedures, required at least annually, must be performed by whom?

  • A. An authorized employee not using that procedure
  • B. A Cal/OSHA representative during a scheduled compliance inspection
  • C. The employee who normally performs that lockout procedure
  • D. Each affected employee assigned to operate that machine

Correct Answer: A

§3314(j)(1) requires the annual periodic inspection to be performed by an authorized employee or person other than the one(s) utilizing the hazardous energy control procedure being inspected. The employer must also certify the inspection, identifying the equipment, date, employees included, and the person performing it.

Reference: Cal/OSHA Title 8 General Industry and Electrical Safety Orders, §3314(j)(1)

Your first attempt is an inspection, not a final grade. The results page breaks your score down by outline topic, so you can see which areas need work. Keep practicing until you pass consistently.

  • On our practice exams, answer what you know first and bookmark the rest; you can come back to bookmarked questions.
  • Work your bookmarks on the second pass.
  • After each attempt, read the cited reference section for each question you missed.

Questions Not published by the board
Time limit 210 minutes
Passing score Not published by the board
Books in the exam room Closed book (no books in the room)
Exam fee $51.43
  • You receive a printed score report at the check-in location immediately after your examination, and a failing report shows the overall score including the number of items answered correctly.
  • You must wait 21 calendar days after each attempt before testing again, may test as many times as needed within the 18-month eligibility period, and must pay a fee for each attempt.

Source: Contractors State License Board Licensing Examination Information Guide – Electrical (C-10), 13E-10 (03/2026). Check the bulletin before test day: fees and rules can change.

Reference books

9 books on the bulletin
As an Amazon Associate we earn from qualifying purchases.
10 free questions30 min · no account