The California C-10 Electrical Contractor exam tests the rules and trade knowledge behind the work. This guide lays out the job: the key facts from the official bulletin, what the exam covers, the study resources the bulletin lists, sample questions with answers, and how to get ready. PSI gives the exam.
The California C-10 Electrical Contractor Exam at a Glance
Here's the rundown from the official bulletin:
| Questions | Not published by the board |
| Time limit | 210 minutes |
| Passing score | Not published by the board |
| Books in the exam room | Closed book (no books in the room) |
| Exam fee | $51.43 |
On exam day
- The exam is multiple choice with four choices per question, one BEST answer, and no penalty for guessing.
- You must show one valid, non-expired government-issued photo ID from the listed types, and the name on it must match the name on your application.
- You must arrive at the examination site at least 30 minutes before your scheduled appointment time.
- This is a closed-book examination and no reference materials may be used during it.
- A calculator is provided for the examination, and candidates may not bring their own calculator into the testing room.
- Personal items such as phones, calculators, notes, textbooks, personal pens or pencils, watches and food or drink are prohibited in the testing room, while timing mechanisms are available in the room and on the computer console.
Study references listed in the bulletin (not allowed in the exam room)
- California Building Code, California Code of Regulations, Title 24 (2025)
- California Electrical Code, California Code of Regulations, Title 24 (2025)
- California Energy Code, California Code of Regulations, Title 24 (2025)
- California Fire Code, California Code of Regulations, Title 24 (2025)
- American Electricians' Handbook
- Photovoltaic Systems
- State of California General Industry & Electrical Safety Orders (Cal/OSHA) and State of California Construction & Electrical Safety Orders (Cal/OSHA), California Code of Regulations, Title 8 (2025)
- Ugly's Electrical References
Scheduling, changes and retakes
- You schedule the examination yourself through PSI, online at https://test-takers.psiexams.com/cacon or by phone at (877) 392-6422.
- After the Board approves you, your examination eligibility lasts 18 months from the date you were deemed eligible, and you must reapply once it expires.
- You can cancel or reschedule without forfeiting your fee if PSI receives notice two days before the exam date, done through the PSI website or by speaking to a representative, and registration fees are never refundable or transferable.
- Missing the appointment, arriving after the examination start time, failing to cancel two days ahead, or not presenting proper identification means you cannot test and you forfeit your examination fee.
- You receive a printed score report at the check-in location immediately after your examination, and a failing report shows the overall score including the number of items answered correctly.
- You must wait 21 calendar days after each attempt before testing again, may test as many times as needed within the 18-month eligibility period, and must pay a fee for each attempt.
- Passing candidates receive additional instructions in the mail from CSLB, since the score report itself is not a license.
Source: Contractors State License Board Licensing Examination Information Guide – Electrical (C-10), 13E-10 (03/2026). Check the bulletin before test day: fees and rules can change.
What the California C-10 Electrical Contractor Exam Covers
The official content outline breaks the exam into 5 topics:
| Topic | Approximate share of the exam |
|---|---|
| Planning and Estimating | 28% |
| Rough Wiring | 27% |
| Finish Wiring and Trim | 11% |
| Startup, Troubleshooting, and Maintenance | 16% |
| Safety | 18% |
Planning and Estimating: The outline lists: Existing system evaluation; Plan and specification interpretation; Electrical calculations; Code requirements; Material selection; Energy production and storage project planning (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Load calculation methods for branch circuits, feeders, and services (Article 220); Conductor sizing, ampacity, and derating factors.
Rough Wiring: The outline lists: System layout; Clearance and accessibility requirements; Raceway and panel installation; Wire and equipment installation; Grounding and bonding; Energy production and storage rough wiring (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Conduit fill calculations and conductor count limits by raceway type; Conduit bending techniques (stub-ups, offsets, saddle bends, back-to-back bends).
Finish Wiring and Trim: The outline lists: Finish device placement and installation; Motor and equipment installation; Wire and equipment labeling; Trims and sealants; Energy production and storage finish wiring (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Luminaire installation requirements and location restrictions; Switch types, wiring configurations, and installation requirements; Panelboard and switchboard finish installation and circuit identification.
Startup, Troubleshooting, and Maintenance: The outline lists: System energizing and testing; Common electrical problems; Location, repair, and replacement of inoperable electrical wires/components; Selection and use of electrical testing equipment; Energy production and storage system performance (photovoltaic, wind, generators, batteries, capacitors). Our study plan adds: Grounding and bonding system verification and testing; Overcurrent protective device selection, ratings, and coordination; Motor and generator inspection, lubrication, and maintenance procedures.
Safety: The outline lists: Lockout/tagout procedures; Personal protective equipment (PPE); Tools/equipment; Hazardous materials and job site environments. Our study plan adds: Injury and Illness Prevention Program (IIPP) requirements; Arc flash and shock hazard protection boundaries; Fall protection systems and requirements; Ground-fault circuit interrupter (GFCI) and assured equipment grounding programs.
How to Get Ready for the California C-10 Electrical Contractor Exam
This is a closed-book exam, so the knowledge has to be in your head, not in a book. Work through the topics in the outline.
Do the big jobs first. Planning and Estimating and Rough Wiring make up about 55% of the exam.
Put in the reps with timed practice exams.
When you miss a practice question, read the explanation and the reference behind it until the rule sticks. Keep at it until you pass practice exams consistently.
The Books for the California C-10 Electrical Contractor Exam
CSLB's study guide (03/2026) lists these codes and handbooks as study resources, with the 2025 California codes; the exam is closed book, so none may be brought into the testing room.
- 2025 California Building Code (ICC)
- 2025 California Electrical Code (BNI Publications)
- 2025 California Energy Code (ICC)
- 2025 California Fire Code (ICC)
- American Electricians' Handbook (McGraw-Hill Professional)
- Photovoltaic Systems (American Technical Publishers)
- Ugly's Electrical References (Jones & Bartlett Learning)
- Cal/OSHA General Industry & Electrical Safety Orders and Construction & Electrical Safety Orders, 2025 (California Code of Regulations, Title 8)
California code books can be viewed online at www.dgs.ca.gov/bsc.
Working the Exam on Test Day
Work the exam in two passes. On the first pass, answer everything you know and put down your best answer on the rest. Before the clock starts, the on-screen tutorial gives you sample questions to practice answering and reviewing your answers; use it to learn how to go back to a question. On the second pass, go back to the ones you were unsure of and take them one at a time.
Don't get hung up on one question. Before you finish, make sure nothing is left blank.
Study Tips
Reading the material cover to cover usually isn't enough to pass. This is a multiple-choice exam, and multiple choice rewards practice — the more questions you work through under real conditions, the more the terminology and question style become second nature.
Read the explanation for every question — right or wrong. Understanding the underlying rule lets you answer reworded questions you've never seen, instead of memorizing specific answers.
Several 25–30 minute sessions across the week beat one long cram. Spaced repetition moves facts into long-term memory so they stick through exam day.
Practicing against a ticking clock is the best way to beat exam-clock anxiety. Use these timed tests to build your pacing, so you learn to move steadily and never burn too long on a single question. By test day, the format feels routine.
Sample California C-10 Electrical Contractor Questions
These come from our practice question bank, each with its answer and the reference behind it.
Sample 1 — Startup, Troubleshooting, and Maintenance
Question: You are performing an arc flash risk assessment before energized diagnostic work on a 480-volt switchboard and must establish the arc flash boundary. The arc flash boundary is the approach limit from the prospective arc source at which the incident energy equals ______.
- A. 1.2 cal/cm²
- B. 12 cal/cm²
- C. 8 cal/cm²
- D. 40 cal/cm²
Correct Answer: A
The arc flash boundary is defined as the approach limit at which incident energy equals 1.2 cal/cm², the level testing has shown to represent the onset of a second-degree burn on exposed skin. Because injury at that level is survivable and nonpermanent, arc flash protection is not required at lesser levels. The 8, 12, and 40 cal/cm² figures are arc ratings associated with PPE selection, not the boundary definition.
Reference: American Electricians' Handbook, 17th ed., Div. 13, Sec. 78 (Determining the arc flash boundary)
Sample 2 — Finish Wiring and Trim
Question: As a C-10 contractor you are trimming out a stationary 2 hp, 230-volt, single-phase motor rated 300 volts or less with a full-load current of 12 amperes. You intend to use a general-use snap switch suitable only for use on ac as the motor disconnecting means. What is the minimum ampere rating the snap switch may have?
- A. 30 amperes
- B. 15 amperes
- C. 20 amperes
- D. 24 amperes
Correct Answer: B
Per CEC 430.109(C)(2), an ac-only general-use snap switch may serve as the disconnecting means for a stationary motor rated 2 hp or less and 300 volts or less only where the motor full-load current is not more than 80 percent of the ampere rating of the switch. 12 A ÷ 0.80 = 15 A. The 24-ampere answer comes from the different rule in 430.109(C)(1), which requires a general-use (non-snap) switch to be rated not less than twice the motor full-load current.
Reference: California Electrical Code 2025, Section 430.109(C)
Sample 3 — Planning and Estimating
Question: You are evaluating an existing 120/240-volt, single-phase, three-wire feeder in a multifamily building so the grounded conductor can be re-sized. After all Article 220 calculations, including the reductions permitted for ranges and dryers, the maximum unbalanced load between the neutral and an ungrounded conductor is 260 amperes, and none of the connected load is nonlinear. What neutral load may be used to size the grounded conductor?
- A. 242 amperes
- B. 182 amperes
- C. 200 amperes
- D. 260 amperes
Correct Answer: A
For three-wire dc or single-phase ac systems, a further demand factor of 70 percent may be applied to that portion of the maximum unbalanced load in excess of 200 A. The first 200 A is taken at 100 percent and the remaining 60 A at 70 percent (42 A), for 242 A. Option B wrongly applies 70 percent to the entire unbalanced load, and option D ignores the permitted reduction.
Reference: American Electricians' Handbook, 17th ed., Division 12, Sec. 5, Par. 5 (Neutral Feeder Load)
Sample 4 — Rough Wiring
Question: You are laying out an underground duct line for a campus distribution system. Because cable is normally furnished in lengths of 400 to 600 ft and all splices must be made in manholes, what is the recommended maximum spacing between manholes on a straight duct run?
- A. 300 ft
- B. 750 ft
- C. 500 ft
- D. 200 ft
Correct Answer: C
Recommended practice is to locate manholes not more than 500 ft apart. Cable is generally not made in lengths exceeding 400 to 600 ft, splices must be located in manholes, and excessive pull lengths impose too much mechanical strain on the conductors and sheath during the pulling-in process.
Reference: American Electricians' Handbook, 17th ed., Division 8, Sec. 111 (Manholes)
Why Practice Online Instead of With a PDF
A PDF is like reading about a job instead of doing it. Our practice exams are timed and on a screen, so you practice answering with the clock running. Each attempt draws a new set of questions from our bank, and your results break your score down by topic so you know where to put in more work.
Get Started
Take the free California C-10 Electrical Contractor practice exam to see where you stand, then put your time into the topics that need it. For the official rules, read the exam bulletin, and see the licensing board's website.