Exam Cheat Sheet · Quick Reference

Kansas City, MO Master Gas Pipe Fitter Exam (ICC G33, 2018 IFGC)

Missouri  ·  Pearson Vue

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
75
Passing score
70%
Exam time
180 min
Administered by
Pearson Vue
Format
Reference materials allowed

Missouri State Portion 75 questions

General Requirements 37 Q · 49%
General Installation RequirementsCode Definitions and TermsPlan ReadingTestingMaterialsAppliance Listing and Labeling RequirementsPermits and Permit Application ProceduresInspection Types and ProceduresAppliance Location Restrictions and Prohibited LocationsClearances to Combustible Construction and Clearance ReductionAccess and Service Space RequirementsElectrical Bonding and Grounding of Gas Piping +4 more
Water Heaters 4 Q · 5%
Installation of Water HeatersTesting and listing standards for water heaters (ANSI Z21.10.1/CSA 4.1 and ANSI Z21.10.3/CSA 4.3)Water heaters used for combined potable water and space heating applications
Appliances and Equipment 11 Q · 15%
Requirements for Specific Appliances & EquipmentClothes dryer exhaust duct installation and length limitationsUnvented room heater restrictions and oxygen-depletion safety systemsVented wall furnace and floor furnace placement and clearance requirementsCooking appliance clearances and prohibited locationsWater heater installation and dual-use (space heating) requirementsGas-fired air-conditioning appliance clearances and refrigeration coil installationDirect-fired industrial air heater (recirculating and nonrecirculating) location and air supply requirementsSauna heater location, combustion air, and heat/time controls
Fuel Supply System Sizing 4 Q · 6%
Service Distribution Pipe SizingMaximum gas demand calculation and total connected loadAllowable pressure drop and minimum appliance supply pressureSizing methods: longest length, branch length, and hybrid pressureLow-pressure and high-pressure sizing tables for natural gas and LP-gasPipe sizing for CSST using equivalent hydraulic diameter (EHD)Gravity factor adjustments for specific gravity other than 0.60Equivalent length allowances for fittings and valvesAltitude adjustment for installations above 2,000 feetChapter 4 Gas Piping Installations
Combustion Air 10 Q · 13%
Combustion Air Source, Size of Ducts/OpeningsIndoor combustion air volume requirements (standard method and known air-infiltration-rate method)Combining indoor spaces for combustion air (same story and different stories)Outdoor combustion air methods (two-permanent-openings and one-permanent-opening)Combination indoor and outdoor combustion air calculationsMechanical combustion air supply requirements and appliance interlockLouvers, grilles, and screens — net free area calculations and motorized louver interlockCombustion air duct installation requirementsProtection of combustion air from corrosive or flammable fumes and gases
Chimneys and Vents 9 Q · 12%
Venting, Vent Connector, and ChimneysAppliance venting categories and vent type selection (Table 503.4)Vent and chimney termination location requirementsVent connector materials, sizing, slope, and clearancesSizing of Category I appliance venting systems using Tables 504.2 and 504.3Gas vent types (Type B, B-W, L) construction and installation requirementsSingle-wall metal pipe vent requirements and limitationsDraft hoods, draft controls, and vent dampersAppliances not required to be vented and aggregate input limitsChapter 5 Chimneys and Vents

Key Distinctions

PipevsTubing

Per IFGC Section 202, 'pipe' is a rigid conduit of iron, steel, copper, copper-alloy or plastic, while 'tubing' is a semirigid conduit of copper, copper-alloy, aluminum, plastic or steel (aluminum appears only under tubing).

IFGC 2018 Section 202 (Piping definition)
Pressure testvsLeak check

A pressure test verifies the gas-tight integrity of gas piping following its installation or modification, while a leak check is performed to verify that the system does not leak (during/after being placed in service).

IFGC 2018 Section 202, Definitions
Flue gasesvsCombustion products

Flue gases are products of combustion plus excess air in appliance flues or heat exchangers, whereas combustion products are the constituents from burning fuel with oxygen (including inert gases) but excluding excess air.

IFGC 2018 Chapter 2 Definitions
Combustion airvsDilution air

Combustion air is the air necessary for complete combustion of a fuel, including theoretical air and excess air; dilution air is air introduced into a draft hood and mixed with the flue gases.

IFGC 2018 Chapter 2 Definitions
IFGC scopevsIRC scope (exception to IFGC 101.2)

Detached one- and two-family dwellings and townhouses not more than three stories high with separate means of egress, and their accessory structures, go to the IRC; a four-story townhouse exceeds that limit and remains under the IFGC.

IFGC 2018 Section 101.2, Exception
CSST without an arc-resistant jacket/coatingvsArc-resistant-jacketed CSST

Non-arc-resistant CSST must be electrically continuous and bonded to the electrical service grounding electrode system with a bonding jumper not smaller than 6 AWG copper (or equivalent), while arc-resistant-jacketed CSST is considered bonded where it connects to an appliance connected to the appliance grounding conductor of the circuit supplying that appliance.

IFGC 2018 Section 310.2.2
Thimble for a listed draft-hood-equipped appliance (single-wall pipe through combustible exterior wall)vsThimble for an unlisted draft-hood-equipped appliance

Listed draft-hood appliances require a ventilated metal thimble not less than 4 inches larger in diameter than the pipe (reduced to not less than 2 inches larger where there is a run of not less than 6 feet of metal pipe in the open between draft hood outlet and thimble), while unlisted draft-hood appliances require not less than 6 inches larger in diameter.

IFGC 2018 Section 503.7.7
Outdoor combustion air through horizontal ducts (two-opening method)vsOutdoor combustion air communicating directly or through vertical ducts (two-opening method)

Horizontal ducts require each opening to have not less than 1 square inch of free area per 2,000 Btu/h of total input, while direct openings or vertical ducts require not less than 1 square inch per 4,000 Btu/h; the one-permanent-opening method of 304.6.2 uses 1 square inch per 3,000 Btu/h.

IFGC 2018 Section 304.6.1
Wood louvers of unknown design/free areavsMetal louvers and grilles of unknown design/free area

Per IFGC 304.10, where design and free area are not known, wood louvers are assumed to have 25-percent free area and metal louvers/grilles 75-percent free area.

IFGC 2018 Chapter 3 — Section 304.10
Combining volumes on the SAME story (304.5.3.1)vsCombining volumes in DIFFERENT stories (304.5.3.2)

Same-story spaces are connected by two permanent openings, EACH having 1 square inch per 1,000 Btu/h of total input but in no case less than 100 square inches (openings commencing within 12 inches of top and bottom, minimum dimension 3 inches); different-story spaces require permanent openings in doors or floors with a TOTAL minimum free area of 2 square inches per 1,000 Btu/h of total input.

IFGC 2018 Section 304.5.3.1
Indoor purgingvsOutdoor purging

Piping systems with a design operating gas pressure greater than 2 psig are required to be purged outdoors; indoor purging (e.g., through an appliance burner) is allowed only for systems at 2 psig or less that also do not meet the size and length criteria of Table 406.7.1.1.

IFGC 2018 Section 406.7.1
Appliance shutoff valve within 6 feet of the appliancevsShutoff valves grouped at a manifold (409.5.3)

A manifold valve is permitted where it is within 50 feet of the appliance served, readily accessible and permanently identified, with the piping from the manifold to within 6 feet of the appliance designed, sized and installed per Sections 401 through 408; shutoff valves are prohibited in concealed locations and furnace plenums.

IFGC 2018 Section 409.5.3

Key Terms

Flared joint IFGC 2018 Section 202 (Joint, Flared definition)
A metal-to-metal compression joint in which a conical spread is made on the end of a tube that is compressed by a flare nut against a mating flare (IFGC 202).
Flanged joint IFGC 2018 Section 202 (Joint, Flanged definition)
A joint made by bolting together a pair of flanged ends (IFGC 202).
Mechanical joint IFGC 2018 Section 202 (Joint, Mechanical definition)
A general form of gas-tight joint obtained by joining metal parts through a positive-holding mechanical construction, such as a press-connect, flanged, threaded, flared or compression joint (IFGC 202).
Plastic heat fusion joint IFGC 2018 Section 202 (Joint, Plastic Heat Fusion definition)
A joint made in thermoplastic piping by heating the parts sufficiently to permit fusion of the materials when the parts are pressed together (IFGC 202).
Pipe IFGC 2018 Section 202 (Piping definition)
A rigid conduit of iron, steel, copper, copper-alloy or plastic (IFGC 202).
Tubing IFGC 2018 Section 202 (Piping/Tubing definition)
A semirigid conduit of copper, copper-alloy, aluminum, plastic or steel (IFGC 202).
Piping system IFGC 2018 Section 202 (Piping System definition)
The fuel piping, valves and fittings from the outlet of the point of delivery to the outlets of the appliance shutoff valves (IFGC 202).
Bonding jumper IFGC 2018 Section 202 Definitions
A conductor installed to electrically connect metallic gas piping to the grounding electrode system (IFGC 202).
Drip IFGC 2018 Section 202, Definitions
The container placed at a low point in a system of piping to collect condensate and from which the condensate is removable (IFGC 202).
Service shutoff valve IFGC 2018 Section 202, Definitions
A valve installed by the serving gas supplier between the service meter or source of supply and the customer piping system, to shut off the entire piping system (IFGC 202).
Purge IFGC 2018 Section 202, Definitions
To free a gas conduit of air or gas, or a mixture of gas and air (IFGC 202).
Brazing IFGC 2018 Section 202, Definitions
A metal-joining process using a nonferrous filler metal having a melting point above 1,000°F but lower than that of the base metal being joined (IFGC 202).
EHD (Equivalent Hydraulic Diameter) IFGC 2018 Table 402.4(15), Note 2
The flow designation used in the CSST capacity tables; a measure of the relative hydraulic/flow efficiency between different tubing sizes, where a greater EHD means greater gas capacity (not the actual inside diameter).
Regulator, medium-pressure (MP regulator) IFGC 2018 Section 202, definition of Regulator, Medium-Pressure
A line pressure regulator that reduces gas pressure to a lower pressure from an inlet range greater than 0.5 psig and not greater than 5 psig (IFGC 202).
Induced-draft burner IFGC 2018 Chapter 2 Definitions
A burner that depends on draft induced by a fan that is an integral part of the appliance and is located downstream from the burner (IFGC Chapter 2).
Longest length method IFGC 2018 Section 402.4.1
Pipe sizing in which the size of each section is determined using the longest length of piping from the point of delivery to the most remote outlet and the load of that section (IFGC 402.4.1).

Formulas to Know

Indoor combustion air — standard method required volumeRequired volume (ft³) = 50 ft³ × (total appliance input Btu/h ÷ 1,000), summed for all appliances in the space. Examples: (120,000 + 60,000) ÷ 1,000 × 50 = 9,000 ft³; (150,000 + 50,000) ÷ 1,000 × 50 = 10,000 ft³.
Indoor combustion air — known air-infiltration-rate methodFan-assisted: (15 ÷ ACH) × (Ifan ÷ 1,000); other than fan-assisted: (21 ÷ ACH) × (Iother ÷ 1,000); add the two. ACH greater than 0.60 shall not be used in the equations. Example with 0.75 ACH measured (use 0.60): (15÷0.60)×90 = 2,250 ft³ plus (21÷0.60)×30 = 1,050 ft³ = 3,300 ft³.
Outdoor combustion air opening free areaTwo permanent openings through horizontal ducts: each opening ≥ 1 in² per 2,000 Btu/h of total input (e.g., 140,000 ÷ 2,000 = 70 in²; 160,000 ÷ 2,000 = 80 in²). Two permanent openings communicating directly with outdoors or through vertical ducts: each opening ≥ 1 in² per 4,000 Btu/h (e.g., 120,000 ÷ 4,000 = 30 in²). One-permanent-opening method: 1 in² per 3,000 Btu/h.
Combination indoor/outdoor combustion air — outdoor opening reductionRatio of interior spaces = available volume ÷ required volume; reduction factor = 1 − ratio; required outdoor opening = full outdoor opening size (per 304.6) × reduction factor. Examples: 0.60 ratio → 0.40 factor (openings at 40% of full size); 3,000 ÷ 6,000 = 0.50 → 0.50 factor applied to 120,000 ÷ 3,000 = 40 in² one-opening size = 20 in² (and not less than the sum of vent connector areas, minimum dimension 3 inches).
Gross opening area behind louvers of unknown free areaGross area = required free area ÷ assumed free-area fraction, using 25% (0.25) for wood louvers and 75% (0.75) for metal louvers/grilles. Examples: 90 ÷ 0.25 = 360 in² (wood); 50 ÷ 0.25 = 200 in² (wood over a 100,000 Btu/h horizontal-duct opening).
Mechanically supplied combustion air from outdoorsMinimum outdoor air = 0.35 cfm per 1,000 Btu/h of total input. Example: 1,200,000 Btu/h → 1,200 × 0.35 = 420 cfm (appliances must be interlocked with the air supply system per 304.9.2).
Minimum piping test pressureTest pressure = not less than 1-1/2 × proposed maximum working pressure, but not less than 3 psig irrespective of design pressure. Example: 1.5 × 1 psig = 1.5 psig, so the 3 psig floor governs.
Pressure test durationNot less than 1/2 hour for each 500 ft³ of pipe volume or fraction thereof, need not exceed 24 hours (example: 1,100 ft³ = 3 increments × 1/2 hour = 1-1/2 hours). For a system of less than 10 ft³ volume or a system in a single-family dwelling, duration shall be not less than 10 minutes.
Gas demand and longest-length table sizingDemand (cfh) = Btu/h ÷ 1,000, summed for all outlets downstream of the section; each section is then sized from Table 402.4(2) using the system's longest length row (not the branch's own length) and selecting a size whose listed capacity meets or exceeds the demand. Worked examples: (50,000+40,000+100,000) ÷ 1,000 = 190 cfh total; section B = 140 cfh → 3/4 in. (151 cfh at 50 ft) vs 1/2 in. (72 cfh); section A 3/4 in. at 60 ft = 137 cfh vs 135 cfh demand (margin 2 cfh); branch of 40 cfh at the 70-ft row = 1/2 in. (60 cfh).
Vent table capacity adjustmentsSingle-appliance venting configurations WITH LATERAL LENGTHS already include two 90-degree elbows; reduce listed maximum capacity 10 percent for each additional elbow greater than 45 up to and including 90 degrees (three 90s = one 10-percent reduction). Multiple-appliance connectors: horizontal length limited to 1-1/2 ft per inch of diameter (6 in. × 1.5 = 9 ft); longer runs reduce maximum connector capacity 10 percent per additional multiple (14 ft → 0.90 × max; over 18 ft up to 27 ft → 20 percent). Listed corrugated metallic liners in masonry chimneys: maximum capacity reduced 20 percent (0.80 ×), minimum capacity used as shown. Multistory common vent segment containing the single permitted 45-degree offset: common vent capacity reduced 20 percent. Common vent area in a masonry chimney shall be not greater than seven times the smallest listed appliance categorized vent area, flue collar area or draft hood outlet area.