Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
45
Passing score
70%
Exam time
120 min
Administered by
PSI Services Contractor
Format
Reference materials allowed
Louisiana State Portion
45 questions
Sitework11 Q · 24%
Reading and interpreting plan views, profile views, and plan symbols for underground utility workSurveying instruments and techniques: optical levels, transits, grade rods, and GPSSetting line and grade using batter boards, offset stakes, and laser alignmentSite preparation operations: clearing and grubbing, access roads, utility location and protection, pavement cuttingTrench excavation methods, equipment selection, and trench dimensionsSoil compaction methods, Proctor testing, and field density testingDewatering techniques: pumping, wellpoint systems, and groundwater managementEstimating cut and fill quantities using cross section and average end area methods
Concrete10 Q · 22%
Cement types and properties (portland, blended, hydraulic cements)Supplementary cementitious materials (fly ash, slag cement, silica fume, natural pozzolans)Aggregates for concrete (grading, classification, characteristics, deleterious substances)Water-cementitious materials ratio and its effect on strength and durabilityConcrete mixture proportioning and designChemical admixtures (air-entraining, water-reducing, accelerating, retarding)Concrete durability (freeze-thaw resistance, sulfate attack, chloride penetration, permeability)Fresh concrete properties (workability, consistency, air content, bleeding, slump)
Curbs and Gutters4 Q · 9%
Gutter grade and cross slope design requirementsCurb and gutter dimensions and configurationsPavement encroachment limits by street classificationAllowable gutter flow capacity calculation using Manning's equationCross-street flow depth limits for minor and major storm eventsInlet types and placement at curb and gutter locationsStreet intersection drainage design criteriaReduction factors for allowable gutter capacity
Culverts3 Q · 7%
Culvert hydraulic design and flow control (inlet vs. outlet control)Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types)Pipe bedding classes and backfill requirements for culvertsStructural loads on buried culverts (earth loads, Marston's Theory, trench vs. embankment conditions)Superimposed live loads on culverts (highway, railroad, aircraft loading)Outlet protection and energy dissipation at culvert exits (riprap basins, apron design)Culvert installation procedures (trenching, shoring, pipe laying, joint assembly)Stability analysis for culvert structures (uplift, flotation, soil bearing pressure)
One Call3 Q · 7%
Louisiana 811 notification requirements and legal obligationsTwo full business day waiting period before excavationMethods for submitting locate requests (phone, online NextGen system)Tolerance zone rules and hand-digging requirements near marked utilitiesPaint and flag color codes for marking underground utilitiesLocate request validity periods and renewal proceduresProcedures when an underground utility is damaged during excavationPenalties for violations of the Louisiana Dig Law
Heavy Equipment/Safety4 Q · 9%
Excavation cave-in protection systems (sloping, benching, shoring, trench shields)Backhoe and track excavator operation and safetyMotor vehicle and earthmoving equipment requirements (brakes, seat belts, audible alarms, reverse signals)Rollover protective structures (ROPS) for construction equipmentCrane and derrick safety (ground conditions, power line clearances, inspections, operator certification)Personal protective equipment selection, use, and maintenanceSigns, signals, barricades, and flagging requirementsGeneral safety and health provisions (accident prevention programs, safety training, competent person duties)
Irrigation10 Q · 22%
Sprinkler head types, patterns, and performance characteristicsSprinkler head layout and spacing methods (square and triangular)Precipitation rates and calculating water application requirementsGeographical area analysis and circuit zoningBasic hydraulics: static and working pressure, friction loss, and velocityPipe sizing, routing, and loop configurations for irrigation systemsIrrigation system components: valves, controllers, backflow preventers, and pumpsDrip irrigation design: emitters, tubing layout, and soil wetting patterns
Key Distinctions
Standard Proctor (T-99 / ASTM D 698)vsModified Proctor (T-180 / ASTM D 1557)
Standard compacts three layers each struck 25 times with a 5.5-lb, 2-in. hammer (12,400 ft-lb), while modified compacts five layers each struck 25 times with a 10-lb hammer (56,250 ft-lb per cubic foot) and is specified for high-design-load areas such as heavy-duty paving, concrete drives, federal highways and runways.
Pipe and Excavation Contracting, Pages 183 to 184
Swell factorvsLoad factor
A swell factor converts in-place (bank) volume to loose volume, while a load factor converts loose cubic yards back to bank cubic yards (bank volume divided by bank volume plus swell percentage).
Pipe and Excavation Contracting, Page 66
Swell of broken slab (concrete/asphalt)vsSwell of soils such as loam
Always allow a swell factor of 1.7 from bank to loose volume for asphalt and concrete slabs, whereas soils such as loam swell on the order of 1.3 (30 percent) when disturbed.
Pipe and Excavation Contracting, Page 138
Scrapers for embankment fillvsTrucks for embankment fill
A scraper can dump its payload in uniformly thick layers, which trucks cannot do, so scrapers give more consistent lift thickness and better compaction productivity.
Pipe and Excavation Contracting, Page 90
Light utility dozers (40 to 80 hp)vsMid-sized production dozers (80 to 200 hp)
Light utility dozers (blade capacity 1.25 to 2.25 cu yd) are listed for residential/commercial foundations, fine grading, trench backfill, landscaping, light logging and swamp dozing, while mid-sized production dozers list logging (not 'light') and tree and stump removal.
False set is a significant loss of plasticity with little heat evolution caused by re-crystallization of secondary gypsum and is dispelled by continued mixing without adding water, while flash set comes from rapid C3A hydration, releases considerable heat, and cannot be dispelled by further mixing.
Design and Control of Concrete Mixtures (17th ed.), Page 48 — Early Stiffening (False Set and Flash Set) section
Field-cured cylinders are cured alongside the structure to judge curing and protection, which are considered adequate if the field-cured average at the age designated for f'c is at least 85% of the companion standard-cured strength (or field-cured strength exceeds f'c by more than 3.5 MPa / 500 psi); the 75% figure instead applies to the lowest individual drilled core.
Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Oxygen enriched means more than 23.5 percent oxygen by volume and oxygen deficient means less than 19.5 percent; either is a hazardous atmosphere under the confined spaces standard.
29 CFR 1926, §1926.1202
Equipment in transit, no load, boom loweredvsEquipment working near energized lines
In transit with no load and boom lowered the clearances are 4 ft under 50 kV, 10 ft over 50 kV up to and including 345 kV, and 16 ft up to and including 750 kV, whereas working clearance under §1926.600(a)(6)(ii) is computed as 10 ft plus 0.4 in. per kV over 50 kV.
OSHA 29 CFR 1926, §1926.600(a)(6)(iii)
Hard-troweled (steel-troweled) finishvsFloat or broom finish
Concrete with more than 3% entrained air should not be given a hard-troweled finish because of delamination risk, so slabs with the 6% or more air typical of exterior freeze-thaw exposure receive float or broom finishes instead.
Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Undisturbed native soilvsSoil in an old, previously-dug trench line
In certain soils, digging resistance is usually greater in undisturbed earth than in an existing trench line; the old ditch soil usually digs easier and can be spotted visually as darker spots of topsoil mixed with lighter-colored subsoil in the trench wall.
Pipe and Excavation Contracting, Page 148
Heaped bucket capacityvsStruck bucket capacity
Depending on soil type, heaped capacity is usually about 130 percent of struck capacity (e.g., a 2-ft hoe bucket struck at 5 to 6 LCF heaps at about 6.5 to 8 LCF).
Pipe and Excavation Contracting, Pages 142-143
Utility lines up to the metervsCustomer-owned piping downstream of the meter
For a metered service, operators typically mark lines up to the meter but not beyond, because they have no way of knowing what was installed on customer-owned property, so the contractor must watch for unmarked customer lines.
Load factor Pipe and Excavation Contracting, Page 66
A conversion factor that converts loose cubic yards to bank cubic yards, computed as bank volume divided by bank volume plus swell percentage.
Mobilization Pipe and Excavation Contracting, Page 60
A project cost that is sometimes itemized separately on the bid; if it is not a separate bid item it must be included in the equipment cost calculations.
The repeating backhoe sequence listed as load bucket, lift load, swing and prepare to dump, dump bucket load, and return to dig.
Height of instrument (HI) for grade checking Pipe and Excavation Contracting, Page 121
The working figure used to check pipe grade with an optical level, found from the hub rod reading plus the cut, adjusted for where the grade rod is set.
Carbonation of unhardened concrete (dusting) Design and Control of Concrete Mixtures (17th ed.), Page 227 — Carbonation
Carbonation of freshly placed concrete that produces a soft, chalky surface called dusting, usually during cold-weather concreting when unvented heaters or gasoline-powered equipment in an enclosure put unusual amounts of carbon dioxide in the air.
False set Design and Control of Concrete Mixtures (17th ed.), Page 48 — Early Stiffening (False Set and Flash Set) section
Early stiffening with significant loss of plasticity but little heat evolution, caused by rapid re-crystallization of interlocking needle-like secondary gypsum, and relieved by additional mixing without added water.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A segregation-resistance test in which unconsolidated concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, stripped, and inspected for voids and edge slumping, with a common slipform-paving target of 6 mm (0.25 in.) edge slump or less.
Cast-in-place cylinder (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
A cylinder cast in a mold left in the member and cured with the surrounding concrete, intended for concrete 125 mm to 300 mm (5 in. to 12 in.) in depth, and particularly applicable to cold-weather concreting, post-tensioning work, and slabs.
Field-cured cylinder adequacy criterion (ACI 318-19) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Curing and protection are adequate if field-cured cylinders tested at the age designated for f'c average at least 85% of companion standard-cured cylinders, or if field-cured strength at test age exceeds f'c by more than 3.5 MPa (500 psi).
Cold-weather subgrade temperature differential Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Subgrade Preparation section, Page 314
In cold weather the difference between the surface temperature of the supporting materials and the concrete should be held to less than 20°F (11°C) to avoid inconsistent setting, rapid moisture loss, and plastic shrinkage cracking, and concrete must not be placed on frozen subgrade.
Free-fall placement in piers and piles Design and Control of Concrete Mixtures (17th ed.), Page 477 — Structures, Piers and Piles section
Concrete dropped freely down a drilled shaft, which studies show produces no appreciable segregation or loss of strength up to depths of 45.7 m (150 ft).
The application rate in inches per hour computed from the constant 96.3 times the total GPM of all heads in an area divided by the total square feet of area being covered.
Barbed male elbow Simplified Irrigation Design, Chapter 21 (Fittings for the Irrigation System)
A PE fitting that screws into a PVC threaded tee and onto which PE flexible swing pipe is pushed, the barbs holding the pipe without leaking.
Rigid nipple Simplified Irrigation Design, Fittings for the Irrigation System, Chapter 21
A small protuberance or extension used in constructing swing joints to connect two threaded street elbows, and also to raise a sprinkler head set too deep.
Flexible riser Simplified Irrigation Design, Fittings for the Irrigation System, Chapter 21
A PE (polyethylene) lateral-line fitting that connects to bubblers and fixed spray heads, can be cut to the needed length, and bends and pops back when stepped on.
Curb inlet interception rule of thumb Design and Construction of Urban Storm Water Management Systems, Chapter 8, Pages 246 to 247
When locating successive curb inlets on a continuous grade by trial and error, 70-80% of the approaching gutter flow is a reasonable rule of thumb for interception, with succeeding inlets sized for bypass (carryover) plus intervening street flow.
The bottom of the trench box should sit 2 to 3 feet higher than the pipe so pulling the box does not disturb bedding and newly laid pipe; more than 5 feet above the pipe makes the ditch unsafe.
Formulas to Know
Average net cut depth for a takeoff grid cellNet cut = average plan cut − stripped topsoil thickness + replaced topsoil thickness; worked example: 1.80 − 0.50 + 0.33 = 1.63 ft
Height of instrument when the grade rod is set on TOP of the pipeHI = rod reading on hub + cut − (pipe diameter + wall thickness); worked examples: 4.78 + 12.66 − 1.25 = 16.19 (15-in. pipe) and 5.22 + 11.40 − 1.60 = 15.02 ft (18-in. pipe)
Bank to loose volume for broken concrete and asphalt slabLCY = BCY × 1.7; worked example: 1,400 BCY × 1.7 = 2,380 LCY
Import quantity (cut vs fill compared in the same soil state)Convert both to LCY, then import = fill LCY − cut LCY; worked example: 4,000 BCY × 1.32 = 5,280 LCY cut, 4,000 CCY × 1.54 = 6,160 LCY fill, 6,160 − 5,280 = 880 LCY import
Realistic excavator production from optimum productionRealistic rate = optimum rate × operator ability × job efficiency × site condition factors; worked example: 78 LCY/hr × 0.75 × 0.83 × 0.6 = 29 LCY per hour
Motor-grader production and timeProduction = (effective blade width × speed in mph × 5,280 × job efficiency × operator ability) ÷ number of passes; worked example: (12 × 4 × 5,280 × 0.83 × 0.75) ÷ 5 = 31,553 SF/hr = 3,506 SY/hr, so 30,000 SY ÷ 3,506 ≈ 8.6 hours
Linear feet of trench per hour (backhoe)BCF per LF = width × depth; LCF per LF = BCF × (1 + swell); LCF per set = LCF/LF × set length; cycles per set = LCF per set ÷ bucket load; time per set = (cycles × cycle time) + move-up time; LF/hr = (3,600 or 60 min ÷ time per set) × set length. Worked example: 2 × 4 = 8 BCF; 8 × 1.3 = 10.4 LCF/LF; ×8 ft set = 83.2 LCF; ÷8 LCF bucket = 10.4 cycles; (10.4 × 12 s) + 15 s = 139.8 s = 2.33 min; 60 ÷ 2.33 = 25.75 sets/hr; × 8 ft = 206 LF/hr
Sprinkler precipitation ratePR (in./hr) = (96.3 × total GPM of all heads in the area) ÷ total square feet of area being covered
Pressure change with elevation0.433 psi (0.03 kg/cm²) change per 1 ft (0.3 m) of elevation rise or fall
Concrete quantities for slabs, footings and walls4-in. slab: cu yd = slab area in sq ft ÷ 81 (one cu yd covers 81 sq ft at 4 in.), rounded up to the next whole yard (e.g., 960 ÷ 81 = 11.85 → 12 cu yd). Footings/piers: cu yd = length × width × depth ÷ 27, with continuous footing length = outside perimeter (e.g., 124 × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 cu yd), then rounded UP to the next quarter yard to order (5.10 → 5.25 cu yd). 8-in. walls: cu yd = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft (e.g., 1,088 sq ft → 10.88 × 2.47 = 26.87 cu yd). Form contact area = 2 × perimeter × wall height.