Louisiana Culverts and Drainage Structures Practice Exam
Free Practice Exam
Test your knowledge with 10 questions from our pool of 20 free questions.
- 10 questions per attempt
- 30 minute time limit
- Unlimited attempts
- A new mix each time
- Instant results
Full Practice Exam
Complete exam simulation matching the real PSI test format.
- 45 questions (same as real exam)
- 120 minute time limit
- 7 topic areas covered
- 283 questions in pool
- Detailed explanations
Texts preferred · 9am–9pm Central
Louisiana Culverts and Drainage Structures Practice Exam Guide
What's on the exam
Questions per topic, out of 45This practice exam follows the official content outline for the Louisiana Culverts and Drainage Structures exam: Sitework, Concrete, Curbs and Gutters, Culverts, One Call, Heavy Equipment/Safety, Irrigation.
- Free practice exam: 10 questions per attempt, retake as often as you like.
- Full practice exam: 45 questions on a 2 hours clock, a new draw from our bank every attempt.
Sitework 11 items
Our study plan for this topic: Reading and interpreting plan views, profile views, and plan symbols for underground utility work; Surveying instruments and techniques: optical levels, transits, grade rods, and GPS; Setting line and grade using batter boards, offset stakes, and laser alignment; Site preparation operations: clearing and grubbing, access roads, utility location and protection, pavement cutting; Trench excavation methods, equipment selection, and trench dimensions; Soil compaction methods, Proctor testing, and field density testing; Dewatering techniques: pumping, wellpoint systems, and groundwater management; Estimating cut and fill quantities using cross section and average end area methods.
Concrete 10 items
Our study plan for this topic: Cement types and properties (portland, blended, hydraulic cements); Supplementary cementitious materials (fly ash, slag cement, silica fume, natural pozzolans); Aggregates for concrete (grading, classification, characteristics, deleterious substances); Water-cementitious materials ratio and its effect on strength and durability; Concrete mixture proportioning and design; Chemical admixtures (air-entraining, water-reducing, accelerating, retarding); Concrete durability (freeze-thaw resistance, sulfate attack, chloride penetration, permeability); Fresh concrete properties (workability, consistency, air content, bleeding, slump).
Curbs and Gutters 4 items
Our study plan for this topic: Gutter grade and cross slope design requirements; Curb and gutter dimensions and configurations; Pavement encroachment limits by street classification; Allowable gutter flow capacity calculation using Manning's equation; Cross-street flow depth limits for minor and major storm events; Inlet types and placement at curb and gutter locations; Street intersection drainage design criteria; Reduction factors for allowable gutter capacity.
Culverts 3 items
Our study plan for this topic: Culvert hydraulic design and flow control (inlet vs. outlet control); Culvert materials selection (concrete, corrugated steel, aluminum, plastic pipe types); Pipe bedding classes and backfill requirements for culverts; Structural loads on buried culverts (earth loads, Marston's Theory, trench vs. embankment conditions); Superimposed live loads on culverts (highway, railroad, aircraft loading); Outlet protection and energy dissipation at culvert exits (riprap basins, apron design); Culvert installation procedures (trenching, shoring, pipe laying, joint assembly); Stability analysis for culvert structures (uplift, flotation, soil bearing pressure).
One Call 3 items
Our study plan for this topic: Louisiana 811 notification requirements and legal obligations; Two full business day waiting period before excavation; Methods for submitting locate requests (phone, online NextGen system); Tolerance zone rules and hand-digging requirements near marked utilities; Paint and flag color codes for marking underground utilities; Locate request validity periods and renewal procedures; Procedures when an underground utility is damaged during excavation; Penalties for violations of the Louisiana Dig Law.
Heavy Equipment/Safety 4 items
Our study plan for this topic: Excavation cave-in protection systems (sloping, benching, shoring, trench shields); Backhoe and track excavator operation and safety; Motor vehicle and earthmoving equipment requirements (brakes, seat belts, audible alarms, reverse signals); Rollover protective structures (ROPS) for construction equipment; Crane and derrick safety (ground conditions, power line clearances, inspections, operator certification); Personal protective equipment selection, use, and maintenance; Signs, signals, barricades, and flagging requirements; General safety and health provisions (accident prevention programs, safety training, competent person duties).
Irrigation 10 items
Our study plan for this topic: Sprinkler head types, patterns, and performance characteristics; Sprinkler head layout and spacing methods (square and triangular); Precipitation rates and calculating water application requirements; Geographical area analysis and circuit zoning; Basic hydraulics: static and working pressure, friction loss, and velocity; Pipe sizing, routing, and loop configurations for irrigation systems; Irrigation system components: valves, controllers, backflow preventers, and pumps; Drip irrigation design: emitters, tubing layout, and soil wetting patterns.
Sample 1 — Sitework
Question: Before bidding a trench line through exposed rock, you make a quick field estimate of sonic velocity by striking the rock with a one-pound hammer. The hammer chips the rock, leaving jagged edges. This indicates a sonic velocity in which range?
- A. 8,000 to 10,000 fps
- B. 15,000 to 18,000 fps
- C. 10,000 to 13,000 fps
- D. 13,000 to 15,000 fps
Correct Answer: D
Pipe & Excavation Contracting (Sonic Velocity, Pages 289-290) gives the one-pound hammer field test: cratering/spalling indicates 8,000-10,000 fps, a smooth dent 10,000-13,000 fps, chipping with jagged edges 13,000-15,000 fps, and a rebound with no damage 15,000-18,000 fps.
Reference: Pipe and Excavation Contracting, Pages 289-290
Sample 2 — Concrete
Question: You are proportioning the mixture for an interior equipment-room slab at a treatment plant. The specification calls for a smooth, hard-troweled (steel-troweled) finish, and the supplier offers an air-entrained mixture. Above what entrained air content should the slab NOT be given a hard-troweled finish?
- A. 8 percent
- B. 1 percent
- C. 3 percent
- D. 6 percent
Correct Answer: C
Per Design and Control of Concrete Mixtures, Chapter 15 (Finishing Flatwork), floating and troweling before bleeding is complete can trap bleed water or air beneath the finished surface and cause delaminations; for this reason concrete with more than 3% entrained air should not be finished with a hard trowel (ACI 302.1R-15, ACI 301-20). Air contents of 6% or more are typical for exterior freeze-thaw exposure, which is why such slabs receive float or broom finishes rather than hard-troweled finishes.
Reference: Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Sample 3 — Irrigation
Question: You are calculating surge pressure for a residential irrigation system. After determining the pressure rise from the nomograph, what must you do next to find the total surge pressure the pipe must withstand?
- A. Multiply the pressure rise by the pipe length
- B. Divide the pressure rise by the valve closure time
- C. Add the pressure rise to the working water pressure
- D. Subtract the pressure rise from static pressure
Correct Answer: C
According to the surge pressure chapter, once you determine the surge pressure caused by the closing valve from the nomograph, you add that pressure rise to the working water pressure to determine the total surge pressure. For example, a 35 psi pressure rise added to a 50 psi working pressure yields a total surge pressure of 85 psi.
Reference: Simplified Irrigation Design, Surge Pressure and Water Hammer, Chapter 13
- Your results break the score down by outline topic.
- The real exam's passing score: 32 correct answers out of 45 scored questions.
- Keep practicing until you pass consistently, not just once.
- Answer what you know first and bookmark the rest. Our practice exams let you bookmark and come back.
- Work your bookmarks on the second pass.
- Real exam pace: about 2 minutes 40 seconds per question.
- After each attempt, look up every miss in your book.
| Questions | 45 questions |
| Time limit | 2 hours |
| Passing score | 32 correct answers out of 45 scored questions |
| Books in the exam room | Open book |
Source: CULVERTS AND DRAINAGE STRUCTURES EXAMINATION. Check the bulletin before test day: fees and rules can change.