Louisiana Culverts and Drainage Structures Exam Facts
From the official bulletin:
| Questions | 45 questions |
| Time limit | 2 hours |
| Passing score | 32 correct answers out of 45 scored questions |
| Books in the exam room | Open book |
On exam day
- Later editions of references may be used except for Code books, where only the listed edition applies.
- Highlighting, underlining and annotation done before the exam are permitted, and only permanent tabs may be used, with temporary tabs such as Post-It notes prohibited.
- No additional papers, loose or attached, may be brought in with the approved references, and any such materials will be removed and confiscated.
References you may bring
- Code of Federal Regulations - 29 CFR Part 1926 (OSHA) (with latest available amendments)
- Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI (with latest available amendments)
- Louisiana 811
- Pipe and Excavation Contracting (2011)
- Simplified Irrigation Design (1995, 2nd edition)
- Design and Control of Concrete Mixtures (16th Edition)
- Design and Construction of Urban Storm Water Management Systems (1992)
Source: CULVERTS AND DRAINAGE STRUCTURES EXAMINATION. Check the bulletin before test day: fees and rules can change.
Louisiana Culverts and Drainage Structures Exam Topics
The official content outline has 7 topics:
| Topic | Questions | Share of the exam |
|---|---|---|
| Sitework | 11 | 24% |
| Concrete | 10 | 22% |
| Curbs and Gutters | 4 | 9% |
| Culverts | 3 | 7% |
| One Call | 3 | 7% |
| Heavy Equipment/Safety | 4 | 9% |
| Irrigation | 10 | 22% |
Louisiana Culverts and Drainage Structures Exam Prep Checklist
- Get the reference books the bulletin lists. Except for Code books, the bulletin lets you base your answers on later editions.
- Learn each book's table of contents and index first.
- Highlight the sections you use most. The exam facts above list the bulletin's rules on tabs and markings, so follow them exactly.
- Take our timed practice exams until you pass several in a row.
- After each attempt, look up every question you missed in your book.
- Practice at the real exam's pace: about 2 minutes 40 seconds per question.
Louisiana Culverts and Drainage Structures Exam Reference Books
The references allowed in the test room are 29 CFR Part 1926 (OSHA) or, as an alternative, the 29 CFR Part 1926 Selections by PSI, plus Louisiana 811, Pipe and Excavation Contracting, Simplified Irrigation Design, Design and Control of Concrete Mixtures, and Design and Construction of Urban Storm Water Management Systems.
Where to get them:
- OSHA 29 CFR 1926
- Design and Control of Concrete Mixtures
- Urban Storm Water Management Systems
- Simplified Irrigation Design
- Pipe and Excavation Contracting
- Louisiana 811
Test Day Checklist
- First pass: answer every question you know. Bookmark the rest. Every exam lets you return to bookmarked questions (some lock them once you take a break).
- Second pass: work through your bookmarks.
- Pace: 2 hours for 45 questions, which is about 2 minutes 40 seconds per question.
- Last step: answer anything still blank. A blank can't earn a point.
Study Tips
Take this practice exam several times. The goal is to consistently clear your exam's passing score — often around 70–75% — so passing feels routine before you walk into the real test.
Our practice exam is specifically designed to mimic the testing conditions at all exam centers. While untimed PDF study guides might help with studying, they don’t prepare you for the challenge of managing your time during an actual test.
Don't choose a word simply because it looks familiar. On difficult questions, you may not recognize several words in the answer choices—but that doesn't mean they're invented. Test writers only use real words. If you recognize the words in only one answer choice, focus on that choice and evaluate it carefully. If it's correct, great. If not, eliminate it. Every answer choice you eliminate improves your odds, even if you end up guessing among the remaining options.
On an open-book exam, the winners aren't the smartest people in the room — they're the fastest at finding answers. Buy the required book, practice with it open, and tab and highlight each section the first time a question sends you there. Learn the index and table of contents until you can land on any topic in seconds. That speed is what separates a pass from a fail.
Every exam you take will be different from the last. New questions, new order, but always based on the exam bulletin in terms of topics, questions and time.
Louisiana Culverts and Drainage Structures Sample Questions
From our practice question bank, with answers and references:
Sample 1 — Curbs and Gutters
Question: You are checking a curbed local street against major-storm criteria. Runoff from an overloaded gutter must cross the street to reach an inlet on the opposite side. For the major design runoff on a local or collector street, what is the typical allowable cross-street flow depth?
- A. 6 inches above the gutter flow line
- B. 6 inches over the street crown
- C. 12 inches above the gutter flow line
- D. 18 inches above the gutter flow line
Correct Answer: D
Design and Construction of Urban Storm Water Management Systems, Table 8.5 (Page 257), lists typical allowable cross-street flow for local and collector streets as 18 inches of depth above the gutter flow line for the major design runoff. The 6-inch depth at the gutter or in cross pans is the MINOR design runoff limit, and 6 inches or less over the crown applies to arterials and freeways during the major event.
Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 8, Page 257 (Table 8.5)
Sample 2 — Heavy Equipment/Safety
Question: On a construction jobsite, outlets supplying nonpotable water (water intended only for industrial or firefighting purposes) must be identified by signs clearly indicating the water is unsafe for drinking, washing, or cooking. Those signs must meet the requirements of which subpart of the OSHA construction standards?
- A. Subpart E
- B. Subpart G
- C. Subpart D
- D. Subpart C
Correct Answer: B
Per 29 CFR 1926.51(b)(1), outlets for nonpotable water, such as water for industrial or firefighting purposes only, 'shall be identified by signs meeting the requirements of subpart G of this part' to indicate clearly that the water is unsafe and is not to be used for drinking, washing, or cooking purposes. Subpart G is OSHA's Signs, Signals, and Barricades subpart; Subpart C covers general safety and health provisions, Subpart D covers occupational health and environmental controls, and Subpart E covers personal protective and life saving equipment.
Reference: OSHA 29 CFR 1926, §1926.51(b)(1)
Sample 3 — Culverts
Question: You are sizing a culvert in a wooded tributary basin where no debris/safety rack will be installed. Local criteria follow the common practice of requiring that the design computation account for partial plugging of the barrel. What percentage of debris blockage do localities commonly stipulate as the assumed value when computing required culvert size?
- A. 10 percent
- B. 40 percent
- C. 50 percent
- D. 25 percent
Correct Answer: D
Chapter 8 (Culvert Sizing) states that localities often stipulate that the engineer assume 25% debris blockage when computing the required size of the culvert, and that greater blockage may be justified under certain conditions.
Reference: Design and Construction of Urban Storm Water Management Systems, Chapter 8 — Culverts, Design Considerations (Culvert Sizing), Page 307
Sample 4 — One Call
Question: State law requires a "positive response" from facility operators on every locate request. Before the mark-by time, what must a utility operator or pipeline company do?
- A. Confirm the ticket with Louisiana 811
- B. Supply facility depth records to the excavator
- C. Notify the excavator if no conflict exists
- D. Re-mark any faded marks at no charge
Correct Answer: C
Per the Louisiana 811 Brochure (Excavator Frequently Asked Questions), positive response IS required by law: the utility operator or pipeline company must notify the excavator prior to the mark-by time if there is no conflict, or advise that its facilities are not fully marked for locating purposes. Re-marking occurs only on request, depth records are not promised, and ticket confirmation is handled by the notification center.
Reference: Louisiana 811 Brochure, Page 2 — Excavator FAQ (positive response)
Online Practice vs. a PDF
- Timed: you practice finding answers under time pressure, not just reading them.
- Bookmarks: flag questions and come back, the way you will on test day.
- New sets: each attempt draws new questions from our bank.
- Scored by topic: your results show which outline topics need more study.
Next Step
- Take the free Louisiana Culverts and Drainage Structures practice exam.
- Study the topics where you scored lowest.
- Read the exam bulletin for the official rules, and see the licensing board's website.