Exam Cheat Sheet · Quick Reference

Louisiana Heavy Construction

Louisiana  ·  PSI Services Contractor

Verified, not estimated. Every figure below is drawn from the official exam structure we maintain — question counts, passing standard and topic weighting. Practice questions are grounded in the source law with statute citations. We omit any figure we can't verify rather than guess at it.
Total questions
30
Passing score
70%
Exam time
75 min
Administered by
PSI Services Contractor
Format
Reference materials allowed

Louisiana State Portion 30 questions

Erosion and Sedimentation Control 2 Q · 7%
Storm Water Pollution Prevention Plan (SWPPP) development and required componentsStabilization practices for disturbed areas (temporary and permanent seeding, mulching, geotextiles)Structural sediment control measures (silt fence, sediment trap, sediment basin, earth dike)Sediment basin sizing requirements and drainage area thresholdsNPDES permit compliance: Notice of Intent (NOI) and Notice of Termination (NOT) requirementsInspection and maintenance procedures for erosion and sediment controlsSite assessment: measuring disturbed area, drainage areas, and runoff coefficientFinal stabilization criteria and permit termination conditions
OSHA Safety 6 Q · 20%
Excavation cave-in protection systems (sloping, benching, shoring, and shields)Confined space entry permits, attendant and entrant duties, and rescue proceduresFall protection systems (guardrail, safety net, and personal fall arrest systems)Electrical safety and ground-fault protection on construction sitesFire protection and flammable liquid storage and handlingUnderground construction hazards (air monitoring, ventilation, and gassy operations)Personal protective equipment selection, use, and employer payment requirementsOccupational health controls (noise exposure limits, hazardous atmospheres, and permissible exposure limits)
Sitework 5 Q · 17%
Earthwork quantity calculation methods (average-end-area, cross-section, mass diagram)Cut and fill volume estimation and earthwork balancingSoil and rock classification and material properties affecting excavationCompaction equipment selection and soil compaction methodsExcavation equipment selection and production estimating (dozers, scrapers, excavators, loaders)Hauling equipment productivity and truck fleet balancingRock excavation methods (ripping, blasting, drilling) and rippability determinationSite preparation tasks (clearing, grubbing, stripping topsoil, pavement removal)
Concrete 6 Q · 20%
Concrete mixture proportioning and water-cementitious materials ratioFresh concrete properties: workability, slump, bleeding, and air contentBatching, mixing, transporting, and handling ready-mixed concreteSubgrade preparation, formwork, and pre-placement requirementsConcrete placing, consolidating, and finishing operationsCuring methods, materials, and duration requirementsConcrete durability: freeze-thaw resistance, sulfate attack, and permeabilityHot and cold weather concreting precautions and mix adjustments
Metals Including Concrete Reinforcement 3 Q · 10%
Reinforcing bar types, grades, and ASTM specificationsBar identification markings and size designationsStandard hooks, bend shapes, and fabrication tolerancesConcrete cover requirements and placement tolerancesLap, mechanical, and welded splice types and requirementsBar supports: types, selection, and placementPlacing sequence for footings, walls, columns, beams, and slabsCoated reinforcing steel handling, storage, and repair
Pipes 4 Q · 13%
Pipe materials types and selection (copper, PVC, ductile iron, concrete, clay, fiberglass)Pipe sizing classifications and strength designations (ID/OD standards, schedule numbers, SDR ratings)Pipe joints, gaskets, and fittings (roll-over, O-ring, slip, compression gaskets; ells, tees, wyes, couplers)Pipe bedding and trench support requirementsGravity sewer pipe flow rate factors (pipe diameter, slope/grade, pipe material)Water system pressure, thrust forces, and thrust block designPipeline testing methods (air test, water infiltration/exfiltration, mandrel test, visual lamping)Septic system components and drainfield design (septic tanks, distribution boxes, drainfield pipe, seepage pits)
Pre-Cast and Pre-Stressed Concrete Erecting 4 Q · 13%
Preconstruction planning and erection sequencingCrane and hoisting equipment selection and operationRigging systems, sling selection, and lifting hardwareTemporary guying, bracing, and stability during erectionField connections: bolted, welded, grouted, and post-tensionedInstallation procedures for specific member types (columns, beams, wall panels, floor/roof members)Erection tolerances: product, erection, and interfaceSafety programs, fall protection, and OSHA compliance

Key Distinctions

Standard Proctor test (ASTM D-698 / AASHTO T 99)vsModified Proctor test (ASTM D-1557 / AASHTO T 180)

Standard compacts three equal layers with a 5.5-lb rammer dropped 12 in. 25 times, while modified compacts five equal layers with a 10-lb rammer dropped 18 in., delivering roughly five times the compactive energy and yielding a higher maximum dry density at a lower optimum water content.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Compaction Tests section
Bank cubic yardsvsLoose cubic yards

Bank volume is the in-place excavation quantity, while loose volume is the swelled hauled quantity (bank × (1 + swell)); haul-off truck loads must be figured in loose yards because dividing bank volume by truck size under-counts loads.

Pipe and Excavation Contracting — Ch. 9, Estimating Surface Excavation (bank vs loose yards)
Solid rock swell, bank to embankmentvsSolid rock swell, bank to loose

Solid rock swells 20 to 40% from bank to placement in an embankment, whereas between the bank and loose states solid rock swells as much as 65% — a different measurement.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 - Soil and Rock, Volumetric Measure
Oxygen enriched atmospherevsOxygen deficient atmosphere

Oxygen enriched means more than 23.5 percent oxygen by volume; oxygen deficient means less than 19.5 percent — either condition is a hazardous atmosphere under the confined spaces standard.

29 CFR 1926, §1926.1202
Field-cured cylinders (85% criterion)vsDrilled cores (75% criterion)

Curing/protection is adequate if field-cured cylinders average at least 85% of companion standard-cured strength at the age designated for f'c (or exceed f'c by more than 500 psi), while the 75% figure applies to the lowest individual drilled core when evaluating in-place strength.

Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Shoring jacks with plywood tight-sheetingvsTrench box

Tight-sheeting against the walls with plywood on each side of the shoring jacks suits wet clays and loams that slab off the lower trench, while trench boxes are recommended for deep trenches in unstable ground such as wet sands and gravels (open ditches only for shallow, reasonably dry, stable soil).

Pipe and Excavation Contracting, Page 228 (Installing Sewer & Stormwater Systems chapter)
Water settling (puddling)vsMechanical compaction

Correctly performed water settling can reach up to 80 percent of Proctor density in granular soils, but exceeding 80 percent requires adding mechanical compaction to the puddling operation.

Pipe and Excavation Contracting, Page 187
Hard-troweled (steel-troweled) finishvsFloat or broom finish

Concrete with more than 3% entrained air should not be hard troweled (risk of trapping bleed water/air and causing delaminations), so slabs with the 6% or more air typical of exterior freeze-thaw exposure receive float or broom finishes instead.

Design and Control of Concrete Mixtures (17th ed.), Chapter 15 — Finishing Flatwork / Bullfloating or Darbying section, Page 330
Longitudinal haul (mass diagram quantity)vsCrosshaul

The sum of the absolute values of the mass diagram peaks and low points is the material moved longitudinally, while crosshaul is the remaining cut that moves at right angles to the centerline between the same two stations and is commonly treated as dozer work.

Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Haul Distances section
Carbonation of unhardened concrete (dusting)vsDelayed ettringite formation / physical salt attack

A soft, chalky, dusting surface comes from carbonation of freshly placed concrete where unvented heaters or gasoline equipment raise CO2 in an enclosure, whereas delayed ettringite formation is associated with concrete exceeding about 70°C (158°F) during placement or curing and physical salt attack involves salt-laden ground.

Design and Control of Concrete Mixtures (17th ed.), Chapter 11 — Carbonation section, Page 227
Ripper tip angle 60° / 45°vsRipper tip angle 35°

A 60-degree tip angle gives good initial penetration and 45 degrees exerts good lifting or prying force, while 35 degrees while raising the shanks is used to pry out boulders.

Pipe and Excavation Contracting, Page 279
Continuous footing order (quarter-yard rule)vsCombined footings/piers/slab order (whole-yard rule)

The printed ordering rule rounds the net footing volume UP to the next quarter yard, while a combined order of footings, pier footings and slab sums net volumes and rounds UP to the next whole yard.

Carpentry and Building Construction — Ch. 10, Estimating Footings, Foundation Walls and Concrete Block

Key Terms

Plasticity index (PI) Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Soil Limits section
The numerical difference between a soil's liquid limit and its plastic limit (PI = LL − PL).
Modified Proctor test (ASTM D-1557 / AASHTO T 180) Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Compaction Tests section
A laboratory compaction test compacting the specimen in five equal layers with a 10-lb rammer dropped 18 in., giving about five times the energy of the standard test.
Standard Proctor test (ASTM D-698 / AASHTO T 99) Construction Planning, Equipment, and Methods (9th ed.), Chapter 4 — Compaction Tests section
A laboratory compaction test compacting three equal layers with a 5.5-lb rammer dropped 12 in. 25 times.
Cast-in-place cylinder (ASTM C873) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Strength Tests of Hardened Concrete section, Page 437
A cylinder cast in a mold left in the member and cured with the surrounding concrete, usable in concrete 125 mm to 300 mm (5 in. to 12 in.) in depth, and particularly applicable to cold-weather concreting, post-tensioning work, and slabs where a minimum in-place strength is needed before work continues.
Box Test (AASHTO TP 137) Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Segregation Resistance / Box Test section, Page 430
A test in which unconsolidated concrete is placed in a 28 L (1 ft³) collapsible wood form, vibrated with a 25-mm (1-in.) square-head vibrator, stripped, and inspected for voids and edge slumping to judge a low-slump mixture's ability to hold a vertical edge; a common slipform paving target is edge slump of 6 mm (0.25 in.) or less.
Oxygen enriched atmosphere (29 CFR 1926.1202) 29 CFR 1926, §1926.1202
An atmosphere containing more than 23.5 percent oxygen by volume.
Oxygen deficient atmosphere (29 CFR 1926.1202) 29 CFR 1926, §1926.1202
An atmosphere containing less than 19.5 percent oxygen by volume.
Canceled entry permit retention (29 CFR 1926.1205(f)) 29 CFR 1926, Subpart AA, §1926.1205(f)
The entry employer must retain each canceled entry permit for at least 1 year to facilitate the review of the permit-required confined space program required by §1926.1204(n), with problems encountered during entry noted on the pertinent permit.
Carbonation of unhardened concrete (dusting) Design and Control of Concrete Mixtures (17th ed.), Chapter 11 — Carbonation section, Page 227
Carbonation occurring in freshly placed concrete that produces a soft, chalky surface, usually during cold-weather concreting when unvented heaters or gasoline-powered equipment in an enclosure raise carbon dioxide in the air.
Crosshaul Construction Planning, Equipment, and Methods (9th ed.), Chapter 3 — Haul Distances section
Material that moves at right angles to the centerline between the same two stations, equal to total cut within the project limits minus the longitudinal quantity from the mass diagram, and commonly assigned to dozer work.
Water settling (puddling) Pipe and Excavation Contracting, Page 187
Backfill compaction by flooding spoil with water, most effective in sand, gravel and desert-type soils and least effective in cohesive silts and clays, reaching up to 80 percent of Proctor density.
Tight-sheeting Pipe and Excavation Contracting, Page 228 (Installing Sewer & Stormwater Systems chapter)
Lining the trench walls with plywood sheets placed on each side of the shoring jacks (or attached to the jacks), used where wet clays and loams slab off the lower trench.
Drain rock (manhole excavation in groundwater) Pipe and Excavation Contracting, Pages 246-247 (Installing Sewer & Stormwater Systems chapter)
Rock used to stabilize running sands and gravels and to surround the pump intake (or a slotted pipe) to keep it clear when excavating in high groundwater.
Bar support height tolerance Placing Reinforcing Bars (10th ed.), Chapter 10 — Bar Supports
A variation of plus or minus 1/8 inch from the specified nominal height, measured from the support base to the underside of the reinforcing bar, is a normal construction tolerance.
Field-cured cylinders Design and Control of Concrete Mixtures (17th ed.), Chapter 20 — Evaluation of Compression Test Results section, Page 440
Cylinders cured alongside the structure to evaluate the adequacy of curing and protection; curing is adequate if their average strength at the age designated for f'c is at least 85% of companion standard-cured cylinders, or if field-cured strength at test age exceeds f'c by more than 3.5 MPa (500 psi).
Wall form contact area Carpentry and Building Construction — Ch. 10, Estimating Footings, Foundation Walls and Concrete Block
The form surface area in contact with concrete, counted on both faces of the wall.
Roller coverage limit Construction Planning, Equipment, and Methods (9th ed.), Chapter 5 — Types of Compacting Equipment section, Page 206
If required density is not achieved within four to eight coverages by the roller, a different type of compactor should be considered (ten to twelve refers to impacts per foot for asphalt mixtures; two to three is typical passes for a tamping roller on an 8- to 12-in. lift).

Formulas to Know

Plasticity index of a borrow sourcePI = LL − PL; e.g., LL 42 − PL 19 = 23, which satisfies a maximum PI of 25 (61−30=31, 38−12=26, 55−28=27 all exceed it)
Crosshaul from a mass diagramCrosshaul = total cut within project limits − (sum of absolute values of mass diagram peaks and low points); example: 4,100 − (1,500 + 2,200 = 3,700) = 400 bcy
Average net cut depth in a grid cellNet cut = average plan cut − stripped topsoil thickness + replaced topsoil thickness; example: 1.80 − 0.50 + 0.33 = 1.63 ft
Loose (hauled) volume from bank volume using swellLoose cy = bank cy × (1 + swell %); examples: 25.19 × 1.30 = 32.74; 23.70 × 1.25 = 29.63; 512.00 × 1.20 = 614.40. A 10-point increase in swell adds 10% of the bank volume (e.g., 512.00 × 0.10 = 51.20 cy)
Truck loads for haul-offLoads = loose cy ÷ truck capacity, rounded UP (figure in loose yards, not bank); examples: 32.74 ÷ 12 = 2.73 → 3 loads; 29.63 ÷ 14 = 2.12 → 3 loads; 614.40 ÷ 10 = 61.44 → 62 loads
Trench excavation quantity (perimeter trench)Trench length = outside perimeter = 2 × (L + W); bank cy = length × width × depth ÷ 27; example: 2 × (40 + 28) = 136 ft × 2.5 ft × 2 ft = 680 cu ft ÷ 27 = 25.19 bcy
Basement excavation footprint and bank volumeFootprint = (L + 2 × offset) × (W + 2 × offset); bank cy = footprint × depth ÷ 27; examples: (44+4) × (28+4) = 1,536 sq ft × 9 ft ÷ 27 = 512.00 bcy; (44+6) × (24+6) = 1,500 sq ft × 7 ft ÷ 27 = 388.89 bcy
4-inch slab concrete order (Table 11-1)At 4 in. thickness one cubic yard covers 81 sq ft: cy = slab area ÷ 81, rounded UP to whole yards; examples: 960 ÷ 81 = 11.85 → 12 cy; 1,408 ÷ 81 = 17.38 → 18 cy; 1,248 ÷ 81 = 15.41 → 16 cy (check: area × 0.333 ft ÷ 27)
Continuous footing and pier footing volumesFooting length = outside perimeter = 2 × (L + W); cy = length × width × depth ÷ 27 (e.g., 124 × 1.333 × 0.833 = 137.78 cu ft ÷ 27 = 5.10 cy). Piers: each = w × l × d, times number, ÷ 27 (e.g., 3 × (2.5 × 2.5 × 1) = 18.75 cu ft ÷ 27 = 0.69 cy)
8-inch foundation wall concrete and form contact areaWall cy = (wall area ÷ 100) × 2.47 cu yd per 100 sq ft (e.g., 1,088 ÷ 100 = 10.88 × 2.47 = 26.87 cy; check 1,088 × 0.667 ÷ 27 = 26.86). Form contact area = 2 × perimeter × height (e.g., 2 × 136 × 8 = 2,176 sq ft). Block: courses = height × 3/2; blocks per course = length × 3/4